December 2001 Monthly Operating Report for Cooper Nuclear Station
ML020420281
Person / Time
Site: Cooper Entergy icon.png
Issue date: 01/15/2002
From: Hutton J
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NLS2002009
Download: ML020420281 (6)


Text

N Nebraska Public Power District Nebraska's Energy Leader NLS2002009 January 15, 2001 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:

Subject:

Monthly Operating Status Report for December 2001, Docket No. 50-298 Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for December 2001. In accordance with the guidance provided by Generic Letter 97-02, this report includes an Operating Data Report and Unit Shutdown Report for the month of December.

In accordance with Technical Specification 5.6.4, this report also includes documentation of challenges to the safety/relief valves.

Should you have any comments or require additional information regarding this report, please contact Paul Fleming at (402) 825-2774.

Sincerely, James A. Hutton Plant Manager

cb Enclosure cc:

NRC Regional Administrator NRC Senior Resident Inspector ANI Library R. W. Beck and Associates J. M. Cline A. L. Dostal J. W. Dutton D. T. McNeil Cooper Nuclear Station P.O. Box 98/ Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 http://www.nppd.com

NLS2002009 Page 2 R. L. Gumm INPO Records Center D. Bantam E. A. Lanning B. Lewis W. R. Mayben W. D. Shanks R. D. Stoddard D. L. Wilson W. D. Leech Records

APPENDIX A OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE Reporting Period:

050-0298 Cooper Nuclear Station 01/15/2001 Rodrick Wilson (402) 825-5135 December 2001 Design Electrical Rating (Net MWe).

The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design

2.

Maximum Dependable Capacity (Net MWe):

The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.

3.

Number of Hours the Reactor Was Critical.

The total number of hours during the gross hours of the reporting period that the reactor was critical.

4.

Number of Hours the Generator Was On Line.

(Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus.

The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.

5.

Unit Reserve Shutdown Hours.

The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.

6.

Net Electrical Energy (MWH).

The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.

778 N/A N/A 764 N/A N/A 55.4 7,087.1 183,889.1 0.0 7,009.6 181,354.8 0.0 0.0 0.0 0.0 5,206,540.8 122,343,521.0 1/7/02 1:40 PM This Month Yr.-o-Date Cumulative

APPENDIX B UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORT MONTH 050-0298 Cooper Nuclear Station 01/15/2001 Rodrick Wilson (402) 825-5135 December 2001 L

I J __________

L a.

SUMMARY

Continuation of RFO 20.

(1) Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method:

I - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 1/7/02 1:40 PM Type Method Of Shutting CAUSE/CORRECTIVE ACTIONS No.

Date F:

FORCED Duration (Hours)

Reason (1)

Down Reactor (2)

COMMENTS S:

SCHEDULED 01-02 12/01/01 S

SCHEDULED 744 C-REFUELING I-MANUAL Continuation of RFO 20 Refueling Outage beginnning 3-November 2001 1

1 4

4 t

t

APPENDIX C SAFETY/RELIEF VALVE CHALLENGES DECEMBER 2001 There were no challenges to the safety/relief valves during the month of December.

ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS Correspondence Number: NLS2002009 The following table identifies those actions committed to by the District in this document.

Any other actions discussed in the submittal represent intended or planned actions by the District. They are described for information only and are not regulatory commitments.

Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.