ML020390224

From kanterella
Jump to navigation Jump to search
NRC Notification Ltr Dtd 2/5/02 to Millstone, Unit 3
ML020390224
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/05/2002
From: Conte R
NRC/RGN-I/DRS/OSB
To: Hicks G
Dominion Nuclear Connecticut
References
Download: ML020390224 (4)


Text

February 5, 2002 Mr. Gerald D. Hicks, Director Nuclear Training Services Dominion Nuclear Connecticut, Inc.

Millstone Nuclear Power Station, Unit 3 Rope Ferry Road Waterford, CT 06385

Dear Mr. Hicks:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on January 4, 2002, and the operating tests administered January 7-10, 2002, at your facility. This meets the intent of section E.1 of the Examiner Standards (ES 501) in NUREG 1021. Seven individuals were administered the examination and six passed. This information is considered to be proprietary in accordance with 10 CFR 2.790 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individuals independent of the overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the licenses.

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5183.

Sincerely,

/RA/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 50-423

Mr. Gerald

Enclosures:

1.

ES-501-2, Power Plant Licensing Examination Results Summary 2.

2.

ES-303-1 and 303-2, Individual Examination Results 3.

3.

Licenses cc w/o encls:

R.P. Necci, Vice President - Nuclear Technical Services c/o David Smith M. Wilson, Manager - Operations Training

Mr. Gerald Distribution: w/o enclosures:

Master Exam File DOCUMENT NAME: G:OSB\\Caruso\\MS3ExamNotificationLtr.wpd ADAMS PKG ML01240020 After declaring this document An Official Agency Record it will/will not be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE R1/DRS/OSB R1/DRS/OSB R1/DRS/OSB NAME Cburacker /RA/

Jcaruso /RA/

RJConte /RA/

DATE 02/11/02 02/05/02 02/05/02 02/ /02 02/ /02 OFFICIAL RECORD COPY