ML020370069
| ML020370069 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 01/14/2002 |
| From: | George Gellrich AmerGen Energy Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 5928-02-20005, GL-97-002 | |
| Download: ML020370069 (3) | |
Text
ArnerGen Energy Company, LLC Three Mile Island Unit 1 Route 441 South, P.O. Box 480 Middletown, PA 17057 Teepoe 1
94761An exn/rihE egyCmpan January 14, 2002 5928-02-20005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Dear Sir or Madam:
SUBJECT:
THREE MILE ISLAND UNIT I (TMI UNIT 1)
OPERATING LICENSE NO. DPR-50 DOCKET NO. 50-289 MONTHLY OPERATING REPORT FOR DECEMBER 2001 Enclosed are two copies of the December 2001 Monthly Operating Report for Three Mile Island Unit 1. The content and format of information submitted in this report is in accordance with the guidance provided by Generic Letter 97-02.
Sincerely, George H. Gellrich Plant Manager GHG/awm
Enclosure:
Appendix A, and Appendix B cc: Administrator, Region I TMI-1 Senior Resident Inspector File 02001 An Exelon/British Energy Company Telephone: 717-944-7621
- ýýq
Document Control Desk 5928-02-20005 Page 2 of 3 APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-289 DATE January 14, 2002 COMPLETED BY A. W. MILLER TELEPHONE (717) 948-8128 REPORTING PERIOD: December 2001 YEAR TO MONTH DATE CUMULATIVE
- 1.
DESIGN ELECTRICAL RATING (MWe NET).
819.0 The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
- 2.
MAXIMUM DEPENDABLE CAPACITY (MWe NET).
786.0 The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.
- 3.
NUMBER OF HOURS REACTOR WAS CRITICAL.
658.3 7,372.9 158,486.3 The total number of hours during the gross hours of the reporting period that the reactor was critical.
- 4.
HOURS GENERATOR ON LINE.
605.6 7,020.0 156,901.0 (Service Hours) The total number of hours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus. The sum of the hours that the generator was on line plus the total outage hours in the reporting period.
- 5.
UNIT RESERVE SHUTDOWN HOURS.
0.0 0.0 0.0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
- 6.
NET ELECTRICAL ENERGY (MWH).
491,028.0 5,416,658.8 123,011,516.4 The gross electrical output of the unit measured at the output terminals of the turbine generator minus the normal station service loads during the gross hours of the reporting period, expressed in megawatt hours. Negative quantities should not be used.
- Design values have no "Year to Date" or "Cumulative" significance.
Document Control Desk 5928-02-20005 Page 3 of 3 APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-289 DATE January 14, 2002 COMPLETED BY A. W. MILLER TELEPHONE (717) 948-8128 REPORTING PERIOD: December 2001 2
Reason A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Licensing Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 33 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Other (Explain)
SUMMARY
- The plant entered December in the final stage of a refueling shutdown mode and achieved criticality at 13:45 on December 4, 2001. The Generator was placed on-line at 1825 on December 6, 2001. The plant achieved 100 % power on December 9, 2001 and remained at 100% power for the remainder of the month.
Cause & Corrective Action to Prevent Recurrence None F Forced S Scheduled