Amendments 198 & 173 Technical Specification Pages
ML020330020
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/29/2002
From:
NRC/NRR/DLPM
To:
References
TAC MB0634, TAC MB0637
Download: ML020330020 (2)


Text

K.. S SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.1.6.2 Perform a functional test of each 31 days required vacuum breaker.

AND Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after discharge of steam to the suppression chamber from S/RV operation AND Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> following an operation that causes any of the vacuum breakers to open SR 3.6.1.6.3 Verify the opening setpoint of each 24 months required vacuum breaker is - 0.25 anr

.75 psid.

SUSQUEHANNA - UNIT 1 TS/3.6-21 Amendment 198

U U.-.

Sr s

SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE SR 3.6.1.6.2 SR 3.6.1.6.3 Perform a functional test nf each required vacuum breaker.

Verify,he openi',,a C-.iri required ',a.:.v&

cr s 75S FREQUENCY 31 days AND Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after discharge of steam to the suppression chamber from S/RV operation AND Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> following an operation that causes any of the vacuum breakers to open 24 months SUSQUEHANNA - UNIT 2 TS/3. 6-2i Amendment 173