VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 January 23, 2002 U.S. Nuclear Regulatory Commission Serial No.
01-490D Attention: Document Control Desk NL&OS/ETS R1 Washington, D.C. 20555 Docket Nos. 50-338/339 50-280/281 License Nos. NPF-4/7 DPR-32/37 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1 AND 2 SUPPLEMENTAL RESPONSE TO NRC BULLETIN 2001-01 CIRCUMFERENTIAL CRACKING OF REACTOR VESSEL HEAD PENETRATION NOZZLES QUALIFIED VISUAL INSPECTIONS On November 14, 2001, Virginia Electric and Power Company (Dominion) provided a supplemental response to NRC Bulletin 2001-01, "Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles." Our response provided information regarding the qualified visual inspections of the reactor pressure vessel head penetration nozzles and a revised schedule for the visual inspection of those penetration nozzles on North Anna Unit 2 and Surry Unit 2. During a December 6, 2001 telephone conference call with Mr.
William Bateman and other members of the NRC staff, the NRC requested additional information to support the qualification of the visual inspection activities.
The requested information contained in Attachment 1 for both Surry and North Anna demonstrates that all of the associated reactor vessel head penetrations have a sufficient leakage path to the reactor head surface to permit identification of a leaking penetration.
Westinghouse considers a portion of the requested information proprietary. In order to conform with the requirements of 10 CFR 2.790 concerning the protection of proprietary information, the proprietary information on the drawings in Attachment 1 is contained within brackets. Where the proprietary information has been deleted in the non-proprietary version, only the brackets remain (i.e., the information that was contained within the brackets in the proprietary version has been redacted). Attachment 2 has been redacted to provide a non proprietary version of this information. The types of information Westinghouse customarily holds in confidence is identified on pages 1 and 2 of the affidavit accompanying this transmittal pursuant to 10 CFR 2.790(b)(1).
01-490D Page 2 of 2 to this letter provides the Westinghouse "Application for Withholding Proprietary Information from Public Disclosure," affirming the proprietary nature of the document.
If you have any further questions or require additional information, please contact us.
Very truly yours, Eugene S. Grecheck Vice President - Nuclear Support Services Commitments made in this letter: None Attachments cc:
U.S. Nuclear Regulatory Commission (Atts. 2 & 3 only)
Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser (Atts. 2 & 3 only)
NRC Senior Resident Inspector Surry Power Station Mr. M. J. Morgan (Atts. 2 & 3 only)
NRC Senior Resident Inspector North Anna Power Station Mr. J. E. Reasor, Jr.
(Atts. 2 & 3 only)
Old Dominion Electric Cooperative Innsbrook Corporate Center, Suite 300 4201 Dominion Blvd.
Glen Allen, Virginia 23060 Mr. R. Smith (Atts. 2 & 3 only)
Authorized Nuclear Inspector Surry Power Station Mr. M. Grace (Atts. 2 & 3 only)
Authorized Nuclear Inspector North Anna Power Station
SN: 01-490D Docket Nos.: 50-338/339 50-280/281
Subject:
Supplemental Response to NRC Bulletin 2001-01 COMMONWEALTH OF VIRGINIA
) )
COUNTY OF HENRICO
)
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Eugene S. Grecheck, who is Vice President Nuclear Support Services, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this 23rd day of January, 2002.
My Commission Expires: March 31, 2004.
'-ýtNotary Public (SEAL)
Westinghouse Application for Withholding Proprietary Information from Public Disclosure Virginia Electric and Power Company (Dominion)
North Anna Units 1 and 2 Surry Units 1 and 2
I, Philip W. Richardson, depose and say that I am the Licensing Project Manager, Windsor Nuclear Licensing, of Westinghouse Electric Company LLC (WEC), duly authorized to make this affidavit, and have reviewed or caused to have reviewed the information which is identified as proprietary and referenced in the paragraph immediately below. I am submitting this affidavit in conformance with the provisions of 10 CFR 2.790 of the Commission's regulations and in conjunction with the application of Dominion Generation for withholding this information.
The information for which proprietary treatment is sought is contained in the following drawings:
Originating Organization Drawinq No.
Sh. Nos.
Title De Rotterdamsche Droogdok MIJ. N.V.
30660-1099 NA 157" PWR Vessel "Westinghouse" Control Rod Mechanism Housing De Rotterdamsche Droogdok MIJ. N.V.
30660-1103 1
157" PWR Vessel "Westinghouse" Closure Head Assembly, CRD Housing Assy.
De Rotterdamsche Droogdok MIJ. N.V.
30660-1154 1
157" PWR Vessel "Westinghouse" Closure Head Subassembly, Drilling of Adapter Holes and Stud Holes De Rotterdamsche Droogdok MIJ. N.V.
30678-1184 1
157" PWR Vessel "Westinghouse" Closure Head Subassembly, Drilling of Adapter Holes and Stud Holes De Rotterdamsche Droogdok MIJ. N.V.
30678-1185 1
157" PWR Vessel "Westinghouse" Closure Head Assembly, CRD Housing Assy.
De Rotterdamsche Droogdok MIJ. N.V.
30678-1188 NA 157" PWR Vessel "Westinghouse" Control Rod Mechanism Housing De Rotterdamsche Droogdok MIJ. N.V.
30679-1201 1
157" PWR Vessel "Westinghouse" Closure Head Subassembly, Drilling of Adapter Holes and Stud Holes De Rotterdamsche Droogdok MIJ. N.V.
30679-1202 1
157" PWR Vessel "Westinghouse" Closure Head Assembly, CRD Housing Assy.
De Rotterdamsche Droogdok MIJ. N.V.
30679-1216 NA 157" PWR Vessel "Westinghouse" Control Rod Mechanism Housing Westinghouse Electric Corporation 500B893 1
VPA As Built Coordinate Locations of Vessel Closure Head Penetrations as per Figure No. 8 Westinghouse Electric Corporation 500B893 3
VPA As Built Coordinate Locations of Vessel Closure Head Penetrations as per Figure No. 8 Westinghouse Electric Corporation 500B893 4
VPA As Built Coordinate Locations of Vessel Closure Head Penetrations as per Figure No. 8 Westinghouse Electric Corporation 500B893 1
VPA As Built Coordinate Locations of Vessel Closure Head Penetrations as per Figure No. 8 Westinghouse Electric Corporation 500B895 2
VPA Reactor Vessel-As Built Drawings-Control Rod Housing Measurements Westinghouse Electric Corporation 500B895 2
VIA Reactor Vessel-As Built Drawings-Control Rod Housing Measurements Westinghouse Electric Corporation 500B896 1
VIR Reactor Vessel-As Built Drawings-Control Rod Housing Measurements Page 1 of 3 GProprietary Affidavit pursuant to 10 CFR 2.790
Originating Organization Drawing No.
Sh. Nos.
Title Westinghouse Electric Corporation 500B896 2
VIR Reactor Vessel-As Built Drawings-Control Rod Housing Measurements Westinghouse Electric Corporation 500B897 1
VIR As Built Coordinate Locations of Vessel Closure Head Penetrations as per Figure No. 8 Westinghouse Electric Corporation 500B897 2
VIR As Built Coordinate Locations of Vessel Closure Head Penetrations as per Figure No. 8 Westinghouse Electric Corporation 500B897 3
VIR As Built Coordinate Locations of Vessel Closure Head Penetrations as per Figure No. 8 Westinghouse Electric Corporation 500B897 4
VIR As Built Coordinate Locations of Vessel Closure Head Penetrations as per Figure No. 8 Westinghouse Electric Corporation 5655D14 8
VRA, Coordinates & Elevation of Closure Head Penetrations Westinghouse Electric Corporation 5655D14 9
VRA, Record Data Sheet Westinghouse Electric Corporation 5655D15 8
VGB (As-Built) Coordinates &
Elevation of Closure Head Penetrations Westinghouse Electric Corporation 5655D15 9
VGB (As-Built) Record Data Sheet The drawings have been appropriately designated as proprietary.
I have personal knowledge of the criteria and procedures used by WEC in designating information as a trade secret, privileged, or as confidential commercial or financial information.
Pursuant to the provisions of Section 2.790(b)(4) of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information included in the documents listed above should be withheld from public disclosure.
- 1. The information sought to be withheld from public disclosure is owned and has been held in confidence by WEC. It consists of details of the Control Rod Drive Mechanism (CRDM) nozzles and vessel head penetrations for Surry Units 1 and 2 and vessel head penetrations for North Anna Units 1 and 2, including as-built data and tolerances.
- 2.
The information consists of test data or other similar data concerning a process, method or component, the application of which results in substantial competitive advantage to WEC.
- 3.
The information is of a type customarily held in confidence by WEC and not customarily disclosed to the public.
- 4. The information is being transmitted to the Commission in confidence under the provisions of 10 CFR 2.790 with the understanding that it is to be received in confidence by the Commission.
- 5.
The information, to the best of my knowledge and belief, is not available in public sources, and any disclosure to third parties has been made pursuant to regulatory provisions or proprietary agreements that provide for maintenance of the information in confidence.
- 6.
Public disclosure of the information is likely to cause substantial harm to the competitive position of WEC because:
Page 2 of 3 0
Proprietary Affidavit pursuant to 10 CFR 2.790
) Proprietary Affidavit pursuant to 10 CFR 2.790 Page 3 of 3
- a.
A similar product or service is provided and sold by major competitors of WEC.
- b.
WEC invested substantial funds and engineering resources to develop this information. Access to this information would enhance a competitor's ability to provide engineering services in competition with WEC.
- c.
The information consists of details of the CRDM nozzles and vessel head penetrations for Surry Units 1 and 2 and vessel head penetrations for North Anna Units 1 and 2, including as-built data and tolerances, the application of which provides WEC a competitive economic advantage. The availability of such information to competitors would enable them to design their product to better compete with WEC, take marketing or other actions to improve their product's position or impair the position of WEC's product, and avoid developing similar information in support of their processes, methods or apparatus.
- d.
In pricing WEC's products and services, significant research, development, engineering, analytical, manufacturing, licensing, quality assurance and other costs and expenses must be included. The ability of WEC's competitors to utilize such information without similar expenditure of resources may enable them to sell at prices reflecting significantly lower costs.
- e. Use of the information by competitors in the international marketplace would increase their ability to market comparable engineering services by reducing the costs associated with their technology development. In addition, disclosure would have an adverse economic impact on WEC's potential for obtaining or maintaining foreign licenses.
Further the deponent sayeth not.
Licensing Project Manager Windsor Nuclear Licensing Sworn to before me this IQ day of lee g
&y..
,2001 My Commission expires:
Evaluation to Support Qualified Visual Inspections of the Reactor Vessel Heads (Non-Proprietary)
Virginia Electric and Power Company (Dominion)
North Anna Units 1 and 2 Surry Units 1 and 2
REQUEST FOR ADDITIONAL INFORMATION ON THE NORTH ANNA UNITS 1 AND 2 & SURRY UNITS 1 AND 2 SUPPLEMENTAL RESPONSE TO NRC BULLETIN 2001 -01 PLANT-SPECIFIC ANALYSIS IN SUPPORT OF A QUALIFIED VISUAL EXAMINATION TAC NUMBERS MB2641, MB2642, MB2886 & MB2668 NRC Summary of Issue:
"Bulletin 2001-01 stated that plant-specific as-built geometries, such as measured dimensions on CRDM nozzles and RPV penetrations, are needed to characterize the interference fit population for a particular RPV head, and therefore determine the detectibility of nozzle leaks. The licensee was able to locate as-built dimensions of the reactor vessel head penetration holes and the control rod drive mechanism (CRDM) nozzles for Surry Units 1 and 2, but only dimensions of the reactor vessel head penetration holes for North Anna Units 1 and 2. The actual "as-built" diameter measurements produced an average interference fit of 1.9 mils for Surry Unit 1 and 1.2 mils for Surry Unit
- 2. However, the maximum interference fit for all of the North Anna and Surry units was assumed to be 1.2 mils using fabrication drawings."
NRC Question 1 Provide the justification for using design information (i.e., fabrication drawings) instead of the available "as-built" dimensions.
Response
As stated above, only the diameter of the penetration holes in the vessel head is available for the North Anna units as as-built information. Likewise for the Surry units, the only actual as-built information available is for the vessel head penetration holes. For Surry Unit 1, the "as-built" information that is available for the penetration tubes appears to document dimensions which were recorded prior to final assembly of the penetration tubes into their mating reactor vessel holes. This conclusion is based on the fact that evaluation of the data yields average interference fits that exceed the maximum permissible design value.
For Surry Unit 2, it appears the data more likely represents actual (i.e., final) as-built information because the average interference (in every case) is equal to the design maximum. However, the closure head assembly drawings for each of the four units states, "The O.D. of each control rod mechanism housing shall be ground for this length at assembly to give 0.01 mm to 0.03 mm diametrical interference fit with the mating head penetration."
It should also be noted that on the control rod mechanism housing drawing, the outside diameter (102.2 mm = 4.024 inch) shows no tolerances and a note on the drawing states to "grind per note on fabrication drawing." Because this diameter significantly exceeds the reactor vessel penetration hole diameter, it makes it impossible to install the housing into the vessel penetration without additional machining.
Clearly it was intended that the assembly drawings control the process that produced the design interference fit.
Therefore, the maximum design interference was used for analysis purposes.
Page 1 of 6
NRC Question 2 Provide all available as-built data for the CRDM nozzles and the vessel head penetrations of Surry Units 1 and 2 and the vessel head penetrations of North Anna Units 1 and 2.
Provide a comparison of the available data to the appropriate design drawing tolerances for both the nozzles and the penetrations.
Response
The enclosed drawings listed below, including those noted in response to Question 4, provide as-built documentation relative to the dimensions of the reactor vessel head penetration holes:
North Anna Unit 1: Drawing 5655D14 sheets 8 and 9 of 9 North Anna Unit 2: Drawing 5655D15 sheets 8 and 9 of 9 Surry Unit 1:
Surry Unit 2:
Drawing 500B893 sheets 1, 2, 3, & 4 of 4 Drawing 500B897 sheets 1, 2, 3, & 4 of 4 Design details for the control rod drive mechanism (CRDM) penetration holes in the vessel head and the penetration housing (tubes) themselves are shown on the following drawings:
Surry Unit 1:
Control Rod Mechanism Housing Closure Head Assembly - CRD Housing Assy.
Closure Head Sub Assembly - Drilling of Adapter Holes and Stud Holes Surry Unit 2:
Control Rod Mechanism Housing Closure Head Assembly - CRD Housing Assy.
Closure Head Sub Assembly - Drilling of Adapter Holes and Stud Holes North Anna Units 1 and 2:
Control Rod Mechanism Housing Closure Head Assembly - CRD Housing Assy.
Closure Head Sub Assembly - Drilling of Adapter Holes and Stud Holes Drawing 30678-1188 Drawing 30678-1185 Drawing 30678-1184 Drawing 30679-1216 Drawing 30679-1202 Drawing 30679-1201 Drawing 30660-1099 Drawing 30660-1103 Drawing 30660-1154 From these drawings, it can be seen for both of the North Anna Units and both of the Surry Units the CRDM hole diameter in the reactor vessel was designed at 101.6 +0.05 - 0 mm (4 +0.002 - 0 in.). The fabrication drawings for the CRDM housings (tubes) for all four units show a dimension for the part of the penetration to be inserted in the head of 102.2 mm (4.0236 in.) with no tolerance. As mentioned above, these dimensions would prevent insertion of the penetration in the holes no matter how much they were cooled. It is only after the appropriate length of each penetration was ground in accordance with the Closure Head Assembly drawing that the penetrations (tubes) could be shrunk fit for insertion in the Page 2 of 6
CRDM holes in the vessel head with the requisite 0.01 to 0.03 mm (0.0004 to 0.0012 in.)
interference fit.
NRC Question 3 Provide the design drawings and other documentation that provides tolerances for the CRDM nozzles and the vessel head penetrations, and that describes the design match of the nozzle to the penetration.
Response
See response to Question 2 and the enclosed drawings.
NRC Question 4 Provide references 6.4 and 6.5 for both North Anna and Surry.
Response
The enclosed drawings listed below comprise references 6.4 and 6.5:
"* North Anna Unit #1 Manufacturing Data for the Vessel Closure Head Penetrations, Drawing No. 5655D14, sheets 8 and 9.
"* North Anna Unit #2 Manufacturing Data for the Vessel Closure Head Penetrations, Drawing No. 5655D15, sheets 8 and 9.
"* Surry Unit #1 Manufacturing Data; Westinghouse Drawing Nos.
500B893, "VPA As Built Coordinate Location of Vessel Closure Head Penetrations As per Figure No. 8" 500B895, "VPA Reactor Vessel -
As Built Drawings -
Control Rod Housing Measurements"
"* Surry Unit #2 Manufacturing Data; Westinghouse Drawing Nos.
500B897, "VIR As Built Coordinate Location of Vessel Closure Head Penetrations As per Figure No. 8" 500B896, "VIR Reactor Vessel - As Built Drawings - Control Rod Housing" NRC Question 5 The conclusion for both North Anna and Surry is that there is a 100% probability that an external visual inspection will identify leakage from CRDMs. Provide the statistical basis for this statement.
Response
In References 3 and 4, the condition of the interference fit at normal operating conditions is determined for the North Anna and Surry units, respectively.
Two-dimensional, Page 3 of 6
axisymmetric finite element analyses were also performed in References 1 and 2. The analyses for both Surry and North Anna indicate that for the maximum specified interference fit, a positive radial gap exists between the control rod drive mechanism (CRDM) housing and the vessel head penetration in the normal operating condition.
Consequently, the deterministic analyses show that a leakage path exists if there is a through-wall crack in the cylindrical wall of the housing or the J-groove weld. No statistical analysis is necessary or was performed to establish the 100% probability that an external visual inspection will identify leakage from CRDM head penetrations. The basis of the conclusion is entirely deterministic.
NRC Question 6 The two-dimensional model used to predict the final interference fit may not be adequate because the CRDM penetration was attached to the vessel head by the J-groove weld at the bottom of the interface only, and effects from this constraint are not modeled in the analysis. Provide results using an approach, which could estimate the variation of the interference fit along the length (axial) of the interface (e.g., using finite element method).
Response
In References 3 and 4, the condition of the interference fit at normal operating conditions is determined for the North Anna and Surry units, respectively. The calculational approach used in these references consists of classical formulations for the effect of pressure and temperature on cylindrical (CRDM housing) and spherical (RV head) vessels.
The conclusion of these evaluations is that for even the maximum specified diametrical interference fit, the interference would be relieved at normal operating conditions and a positive radial gap will exist.
In the original ASME design report for the reactor vessel for the Surry and North Anna units (References 1 and 2), the displacements and stresses at the CRDM vessel head penetration were evaluated using an axisymmetric finite element model. The J-groove weld is included in this model. The outline of the finite element model is provided in the attached Figure 9.4-5 from the North Anna stress report. A figure of the finite element mesh is provided in the attached Figure 9.4-3 from the Surry stress report. Additional figures of the finite element model are provided in the attached Figures F.9.4-8 and F.9.4-9 from the Surry stress report. For the purposes of this discussion, the structural models for both North Anna and Surry are identical.
As part of the analysis in the design report, the condition of the shrink fit is evaluated for the purpose of applying appropriate boundary conditions for the structural finite element model. The evaluation of the shrink fit is performed by determining the relative radial displacements of node pairs located on the CRDM housing and the ID of the vessel head penetration. The attached pages 9.4-36 through 9.4-39 from the Surry stress report (which includes Tables T.9.4-5 through T.9.4-8) provide a discussion and the results of the shrink fit evaluation. The locations of the node pairs used to assess the condition of the shrink fit are shown on the attached Figure 9.4-3. In assessing the condition of the shrink fit, the maximum specified shrink fit is evaluated (diametrical interference of 0.03 mm, 0.015 mm radially). For the normal steady state condition, it is determined that a positive radial Page 4 of 6
clearance exists for both Surry and North Anna along the length of the head penetration above the J-groove weld (Refer to attached Table T.9.4-7). Since the J-groove weld is modeled in the analysis, the radial clearance at the top of the weld will always equal zero.
An additional, handwritten column has been added to Table T.9.4-7 to indicate the approximate distance from the top of the weld to the node pair locations. As shown in this table, the calculated radial gap reaches its maximum value approximately 49 mm above the J-groove weld, and maintains this approximate value to the outside of the vessel head penetration. The condition of the radial gap over the length of the vessel head penetration for normal operating conditions is shown graphically in Figure 1 below.
Based on the results of 1) manual calculations utilizing classical formulations for deflection of cylinders and spheres under internal pressure and temperature, and 2) detailed finite element analyses of the components, it is concluded that a radial gap will exist between the CRDM housing and the vessel upper head penetration. This gap will exist over the full length of the penetration above the J-groove weld. Based on the existence of this gap, leakage from CRDM penetrations (either through J-groove weld or the CRDM housing) can be identified by an external visual inspection of the reactor vessel upper head.
Page 5 of 6 Figure 1. Variation of Radial Gap Over CRDM Housing Upper Head Penetration - Normal Operating Conditions 140 Exterior of Vessel Head 131 mm 120.
"o0 a 100 0
0 c~80 0
- o.
60 0
>040 S20
- 0.
0.000 0.005 0.010 0.015 0.020 0.025 0.030 0.035 0.040 Radial Gap (mm)
References
- 1. Calculation 30678-1130, "Reactor Vessel - Final Stress Report (Parts I & II)," Surry Power Station Units 1 and 2, Rotterdam Dockyard Company.
- 2. Calculation 30660-1130, "Reactor Vessel - Final Stress Report (Parts I & II)," North Anna Power Station Units 1 and 2, Rotterdam Dockyard Company.
- 3. Westinghouse Letter No VRA-01-179, from M. P. Osborne to Gary Modzelewski "Detectability of Leakage in North Anna 1 and 2 Reactor Vessel Heads," dated September 28, 2001.
- 4. Westinghouse Letter No VPA-01-010, from M. P. Osborne to Gary Modzelewski "Detectability of Leakage in Surry 1 and 2 Reactor Vessel Heads," dated October 11, 2001.
Page 6 of 6
De Rotterdamsche Droogdok MaotschappiI B.V.
(Th.
Roittcdi-0!3c~ynid Ct'-t.3ny)
Fig.
KI I
I 1..
4'
).4-um-',b'rifl of' the plotted par'ts of the VINEL.
Lcometry.
C-
Document No.
30678-1130 Rev.
1 Page 9.4-4
- 56. i9 Dimensions in mm.
-5hrjek
-ýl +- 61exranvces cý,re* Ccoloujea veze4 Uppelr i4eo~a CRzDM 4vA I
I 10(1.9 144.9 R
F(.9.4-3 FINEL network' C.R. D. -iiOUS 14 z
418.0-.
T~74.0..
330.0.
2ý ";ý 154.0..-
110.0..
66.0 -
.22.0 -
-22.04..
12.9 IDo Rotterdamsche Droogdok Maatsichapptj B.V.
- m. ROttrdam Doc&dr"Cmo)
I D"
7,)
T ý e-I/ "
Da Rotterdamsche Droogdok M'a~tschapOIJ B.V.
(The Ratleridam Dockyard Companty)
Document No.
30678-1130 Rev.
I Page 9.4-40 Fig.F.9.4-3 iNumberir.g off th.e plctted parts. of the rlx'-EL gcornati ie-3/c I -
z 374.0 330.0 285.-0, 2'12.0.
ipji F
154.0 r-.;
1*
P].0.
6r.0
-~22.0 I.
WS fiddg4zslgv.W )OP500ja o4:;sujepj2jjoýj pa P -6 059d T *AO8, OETT-9 L90C
- oN )uvtunoo(3 Tdý it-Ili 1111H silisnoli-oltI13
'Z 4.11ed 'AZ49=95 larila P-6-a'UIJ bG, 0i tls* ss 93* 35 CS Lip LS* lzý G;* lis 08, ýG LCZ-SOC-2Zý'-
VO-.-
Cal-73'.- JaC 0
C C-0 c-6 C-0 b Ib -
S-9 SCC sm 4cc",
s 2 r.
r.., s.
s r. -
c r - Or.- GVG-I.VS-OV9-SVC scr.,
S\\
\\a r.
9SC 0
kLC-CLC-U.C-IL IVC
'C 6 tc csc 099."
ý,\\
Gs.
cur.-
VGC_ r.GS-zccý._ ZGC-oGr.- sac-99C_ t9c
.9c c2c LGC GIV_ Giv-Llý_ gii-siv-kIV_ CIV_ zlý_ I it, o2v r.3V-
ý3k-rzý- IZV-1;9ý 0
4,tl, -
scir -
S'.ý -
Vrk -
COP-zcý -
V 90- SOV-
ý95-r.9V-z9v-19'r-GOV-GO-GO CLV-L&V-91.1p-Stk-kO - C0- ZLV-10- DO sp*- iov-coi, zov-iok-ooý COS-var.- Cos-US-los-car.- GuV_ 9GV_ LGV ZIS-Its-OIS-
)s C3.
Li 4:n GO I
ca as
Do Rotterdamnsche Droogdok Maatschappij B.V. cM.
Ron.tkyfa oked Cofmpany)
Document NO. 30678-1130 Rev.
1 Rage 9.4.- 42 I
'.4 I
SSE -593 0S
-525
-EUYTI/
360 -561 -3512 -569-31t's~
C-4 C?
1*)
C4d ii
- a.
- 4 I?
0.'
C.'
.0 0
C.,
F),
C" C11 C)
.1 3,
In 0
C" P,
3' 04.30 IS.2S 3 is 00.07 c,."0 FICl.F.9.4- 0 FINEL geometry, part 5.
Cr.
le
9 iavd 'Az:ýwa=95~ i 6
A
- o
)9 -902 f
09-CC9 "9-109- 009-669 L:9
- 9-t. l bg 2199 ZO9*
1g9.
0:9.
GZ9. on-L~
.9~- bia.c1g-3..S-Lg. 1 g
)9g.'g 0 99 Sag S9-169- 0s-39g-6C9-909-L0g-999 CaL
.A&.got.- Sol.-
mo.. car.-,o&- lot.. 00t.- GG9 5i14. Lit4. OIL-gIt.- 'D IL-914-;t.
Zlt..II olt Lt-9Nt.-
Ma.-
zf,_ruL-zu-M.L- 021~.- 6 1.
9U L c.-
CU CLVU
-r act3r.. Ir.4. Oct.. szf.
ýt.- ct ct.-
ZICL.-
oct.- GVL* Ott-LVL. 901.
Do Rotterdamsche Droogdok Maatschappij B.V.
M.
Rotte*dam Dockyard Compaey)
Document No. 30678-1130 Rev.
1 Page 9.4-16 r
ye 9.4.5.4. Calculation model in ccnnection with the shrink fit Three calculation models of the C.R.D.-housing are possible:
- 1. The clearance between the C.R.D.-housing and the vessel wall is positive under all conditions, so except for the welding no interaction between C.R.D.-housing and vessel wall is possible.
- 2. The clearance is always negative, thus the motion of the tube is forced by the motion of the inside of the hole in the vessel wall.
- 3. The value of the clearance varies with time and with the axial coordinate of the housing.
rrom ref. 4 it can be seen that the shrink fit over the diameter can be 0.01 t 0.03 mm.
The clearances that will be calculated are based upon the maximum shrink fit 0.03 mm = 0.015 mm over the radius.
The dimension reports of the C.R.D.-housing and the holes in the vessel wall show a shrink fit equal to 0.03 mim over the diameter.
At begin of heat up, the clearance between the C.R.D.
housing and the hole between the C.R.D.-housing and the vessel wall due to the shrink fit will be 0.015 mm.
The clearance due to internal pressure will be less than the clearance due to shrink fit. (see T.9,4-5)
In this case there is no slit at begin heat up, and the calculations for this condition are based upon the geometry without a slit.
At end of heat up the cldarance due to internal pressure 2235 psi are higher than the negative clearance.
~-
De Rotterdamsche Droogdok MaatschappiJ B.V.
(The Po*s.toa odryaid Comp.an)
Document No.
30678-1130 Rev.
1 Page 9.4-37 i..
F'-,
L
.1 I..
4' F
I due to shrink fit and the negative clearance due to the expansion of the materials at end of heat up (see T.9.4-6)
For this condition the stresses are calculated by using the geometry with a slit.
The clearance at normal steady state is always positive (see T.9.4-7)
In this case the stresses are calculated by using the geometry with a slit.
At end of cool down the negative clearance due to the shrink fit are higher than the positive clearance due to internal pressure 385 psi and the positive clearance due to the expansion of the materials at end cool down (see T.9.4-8)
The stresses for this condition are calculated by using the geometry without a slit.
At design pressure the clearance diverted from the calculations of the geometry with slit and is always positive (see table T.9.4-5)
The shrink fit has been simulated by raising the temperature of the C.R.D.-housing with respect to the ves sel wall in the geometry without slit For the stress analysis, a mean shrink fit of 0.03 mm.
has been chcsen, or 0.015 mm over the radius.
The radius of the housing is 50.8 mm,
'he thermal expansion at 700F is 10.44 x 10"
-.m/0C, thus:
temp.diff.C.R.D.
0.015 28.39 0 C.
10.44xlO-xS0.8 The stresses for this condition are calculated by using the geometry without a slit.
De Rotterdhmiche Droogdok Maamschapplj B.V.
Me Rott.eam o)+.yard Company,)]
Document No. 30678-1130 Rev.
1 Page 9.4-38 T.9.4-5 Clearance due' to internal pressure Displacements of the nodal points are derived from pressure 1000Gpsi ; geometry with slit.
internai I.,
Clearance 'at *end' heat up
-0.015,
+0.02-6
- 0. OiS
+O0. 0 2N 5
-0.015
+0.0218 I
-0.015 40.0125
-0.015
-0.0002 N?,
01),
nodal pressure 1000 psi 2235 psi 385 psi sf*rnk fiin points 10d0 psi "clearance clearance clearance clra;,ci:
displace-Ilaac la mcnts "
707 0.00250 708
.0.02178 0.019.28 0.04309 0.007'42
-0.015 583 0.00230 584 0.02196 0.019&66 0.04394 0.0'0751
-0.C15 538 0. 00222' 539
- 0. 022'05 0 : 01983 0.041132 0.00713
-0.015 505 0.00579 506 0.02141 0.01562 0.03491 0.00601
-0.015
'il 8
0.01169 4,19 0.01992-0.00823 0.01839 0.00317
-0.01$
T.9.4--6
- 2
,,t
" Clearance
De Rotterdamsche Droogqok Maelschapplj B.V.
me. R.ttrda,,
Dockyardor,.,a,.)
Document No.
30678-1130 Rev.
1 Page 9.4-39 T.9.4 Clearance at normal' stecad! state
: AsMA*e
- -CoD/e blA
n6dal points normal steal dy state, displace-
"c ments with e
s1I pressure 2235 psi clearance
'rin1 f it clcarancc cieal c tearzAr1.CC 0.17917 0.17629
-0.00288 0.04309
-0.015
+0.b25.
0.17922 0.17630
-0;'00292 0.04394
-0.015
+0.026'C 0 1794I1 I 0.17644
-0.00297 0404432
,-0.015
+0.0264 0.17858 0.17610
-0.00218 0.03491
-0.015
+0.0!7,7 0.17642 0.17597
-0.00045 0.01839
-0.015
+0.002.9 T.9.4-8 Clearance at end cool down end cool nodal down,displa points cements without sli:
707
-U.00022 708
-0.00088 583 0.00114 584 0.001111 538 0.00194 539 0.00218 505 0.00255 506 0.00275 4118 0.00289 449 0.00300 I
r clearance
- 0. 00014 0.00027 0.00024 0.00020 0.00017 pressure 385 psi shrink fit.
clearance total ciearrtc'
+
1
.t _______________
0.00742 0.00756 0.00763 0.00601 0.00317
-0.015
-0.015
-0.015
-0.015
-0.015
-0. 007:;
-0.
0072
.- 0. 0071
- 0.
-0.0 00 1'*
. i r.'Lci 1
m I
t f totAIl
DE RO1TERDAMSCHE DROOGDOK MIJ. wNv.
AID.
457' P. V.R.
VESSEL
..WESTINGHOUSE" CONTROL ROO-MECHAN4ISM MOUSING u;;NpBO76-1186 MAD I
I.
i I WUVGNG MOEN 2!;718.97 FTT I F 70-I I
I
d TEX. HR.
mama 30679-.1?.16 w'a-DE IROTTERDAMSCHE DRGOGDOK 40" P.W.R.,.90ML r,.ONTROI WISM koublýi VZO-',ft.#CfV-4P/ AKM AM
ooý.
DE ROTIERDAMSCHE DROOGDOK MIJ. N.V.
AFD.
Scif-MbLY
>.. CLOSME HERD suB A DRILLIW& OFAVAPI-EiRt fam sTuD "cLES.
GETI
"'CAG. AJAC,ý DAM" GEDEN
,j IEL F*
WIJZPG!ý A-3 JAU.
,1115o(o78-IJ84 a.
a vnn u-
DE ROTTERDAMSCHE DROOGDOK MU. N.V.
CLOSPRE HE1RD 9~55t4BLY CAlD. "DUCAING VeSbY.
cIMK~
AU NR.M WWANG GEM 3o~'78-1ia 3
A rDEC,.
3067-118 i.K
At I I I q ý t w.
Ecu- 099M iuva
'IN
-A w*v Jgbm WVHM WUVQ ON3M&.
ASSV 9NP9W W Mh3SSVOV3H 38nsm-,
.39-OMMS3K 13SS3A IdM8.1%
3M3N3N83)1 WY WN TM MOODOOM 3H3SWON
- . -'I' li,
.U tun..r:
oI V
j L.F
rG i
a I I, uv Il" AkVj NMVO amwL29 wv 3unsoio FWN."(1W )1009008(1 3H:)SWV(lH3UOH 3(l
I i
I
Westinghouse Electric Cor-poration SUCIA BSBO SlYS.
PA. U.SAI COORDINATESf E'.EVATION OF CLOSURE HEAD Pc NETRATIONS SPIN ECPC Rv -----
Ucaus NTS
_5Q5!5D1 I
~ SHEETtr80F9 6
5 4
2 1OaSAE BX
We~iMgtiouse Elect-ric Corporation RECORD DATA SHEET
~N.T.$
1 5655DI 4
(*(E*5SHET 9OF9 DO NOT UALE CA I
¶ 3
6 5
4
Westingbouse Electric Corporation M Vc,8 (AS-BUILT)
COORDINATESt ELFVATION OF CLOSURE HEAD PENETRATIONS SPIN&RCPCRV
- -5f3-N T 5-----------
~~ SHEET 80F9 0fNT~kl SFAII S.By>
6 5
2 4
3 I
9 9
13i 6.3HS S VIVO (OUI (oirng-sy) SS)A g~i'-
nou~ 31.S l
oleodo ip1aI isriol~tUisM I
I I
Wesvinghouse Electric Corporation ATOMIC POWER DIV. PITTSBURGH. PA.. U.S.A.@
TITLE VPA AS BUILT COORDINATE LOCATIONS OF VESSEL CLOSURE HEAD PENETRATIONS AS PER FIGURE NO.8 "SCALE *d I -HEET 0
DIMENSIONS IN INCH ES I CR4 DO NOT SCALE I
I
- 6.
w I
Westinghouse Electric Corporation ATOMIC POWER DIV. PITTSBURGH. PA.. U.S.A.@
T ITLE:VpA AS BUILT COORDINATE LOCATIONS OF VESSEL CLOSURE HEAD PENETRATIONS AS PER FIGURE NO. 8
,,SCALE.HT DIMENSIONS SN INCH ES' SHEET2OF4 DO NOT SCALE IS
'-Z I ______________________________________
I I&'I 3
We"stinghouse Electric Corporation ATOMIC POWER DIV. PITTSBURGH: PA., U.S.A.*J R
TEVA AS BUILTr COORDINATE LOCATIONS OF VESSEL CLOSURE HEAD PENETRATIIONS AS PER FIGURE NO. 8 ISCALE DIMENSIONS IN INCHES SHEET 3 0F4 00 NOT SCALE A-Z
'.j 0
Westinghouse Electric Corporation
(
ATOMIC POWER DIV. PITTSBURGH. PA.. U.S.A.
TITLE: VPA AS BUILT COORDINATE LOCATIONS OF VESSEL CLOSURE HEAC PENETRATIQNS AS PER FIGURE NO.6 Nf,5C;0 BP9 DIMENSIONS IN NCHES.SHEET4 OF4 IDO NOT SCALE
_________________________DO_
NOT-SC L
SUB -...
Westinghouse Electfic Co0poration ATOMIC POWER DIV. PITTSBURGH. PA.. U.S.A.9 TITLE VPA REACTOR VESSEL-AS BUILT DRAWINGS-CONTROL ROD HOUSING MEASUREMENTS DIMENSIONS IN INCHES S H EET I 0 F 2
[DO NOT SCALE I
Westinghouse Electric Corporation ATOMIC POWER. Dly. PITTSBURGH. PA.. U.S.A.@
TITLE: VPA REACTOR VESSEL-AS BUILT DRAWINGS-CONTROL ROD HOUSING MEASUREMENTS SCALE DIMENSIONS IN INCHES SHEET2OF2 I
I 1'
DO NOT SCALE I
SUMIZ
-*....L.
I
WeSlinghouse ElectrIc Corporation ATOMIC POWER DIV. PITTSBURGH. PA.. U.S.A.
T,,TjF VIR REACTOR VESSEL-AS BUILT DRAWINGS-CONTROL ROD HOUSING MEASUREMENTS SP IN-R CPC R~-
SCAE -RCPv 500B896 oCALI DO NOT SCALE
Weslinghouse Etecltc Corporation ATOMIC POWER DIV. PITTSBURGH. PA.. U.S.A.
"PTITLE VI REACTORVESSEL-AS BUILT DRAWINGS-CONTROL ROD HOUSING MEASUREMENTS
-PIN-RCPC RV 500B896 S C A L E T
,MENSONS,,a,,,MS 1
SHEE 2 OF 2 DO NOT SCALE
suB/Z I
DO NOT.SCALE i Sus 12
Wevinghouse Electric Corporalion ATOMIC POWER DIV: PITTSBURGH. PA.. U.S.A.
"TITLE VIR AS BUILT COORDINATE LOCATIONS OF VESSEL CLOSURE HEAD PENETRATIONS AS PER FIGURE NO. 8 SP,_-RCPcv 500B897 SCALE DIMENSIONS IN-,,4CES SHEE T I OF47 D)
NOT SCALE su 1/2
Westinghouse Electric Corporation ATOMIC POWER DIV. PITTSBURGH. PA.. U.S.A.
VIR AS BUILT COORDINATE LOCATIONS OF VESSEL CLOSURE HEAD PENETRATIONS AS PER FIGURE NO. 8 SPPN-RC CRV 500B897 SCALE DiMENSIONS M CHIES SHEET20F4 IDO NOT SCALE 15U 1/2
Westinghouse [lectric Corporation ATOMIC POWER DIV PITTSBURGH. PA.. U.S.A.
T,*=
V IR AS BULLI COORDINATE LOCATIONS OF VESSEL CLOSURE HEAD PENETRATIONS AS PER FIGURE NO, 8 sPIN-RcPcRV _50OBB97 SC ALE IMENSIONS N
INCHES
-S HEET 3 OF4 DO NOT SCALE SLME X2 i
Wesnghouse Electric Corporation ATOMIC POWER DIV. PITTSBURGH. PA.. U S.A.(_.
"TITLE vIR AS BUILT COORDINATE LOCATIONS OF VESSEL CLOSURE HEAC PENETRATIQNS AS PER FIGURE NO.8 SPIN-RCPCRRv SrALE N-'.
DIMENSIONS IN 4NCHES DO NOT SCALE
-I-
.SHEET4 OF4 SUB/12 DONTICL