ML020250315
| ML020250315 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry, Watts Bar, Sequoyah |
| Issue date: | 01/22/2002 |
| From: | Burzynski M Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Security and Incident Response |
| References | |
| Download: ML020250315 (8) | |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402-2801 January 22, 2002 10 CFR 50, Appendix E Section V U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555-0001 Gentlemen:
In the Matter of
)
Docket Nos.
50-259 50-390 Tennessee Valley Authority
)
50-260 50-391 50-296 50-327 50-328 TVA CENTRAL EMERGENCY CONTROL CENTER (CECC)
EMERGENCY PLAN IMPLEMENTING PROCEDURE (EPIP) REVISIONS This letter references our letter to you dated December 14, 2001 on the above subject.
The enclosed information is being submitted for editorial purposes.
If you have any questions, please contact Terry Knuettel at (423) 751-6673.
Sincerely, Mark J.f Burzynski Manager Nuclear Licensing Enclosures cc:
See page 2 Pnled on recycled paper
U.S. Nuclear Regulatory Commission Page 2 January 22, 2002 cc (Enclosures):
U.S. Nuclear Regulatory Commission (Enclosures 2)
Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Senior Resident Inspector
[Enclosures provided Browns Ferry Nuclear Plant by site DCRM]
P.O.
Box 149 Athens, Alabama 35611 NRC Senior Resident Inspector
[Enclosures provided Sequoyah Nuclear Plant by site DCRM]
2600 Igou Ferry Road Soddy Daisy, Tennessee 37379-3624 NRC Senior Resident Inspector
[No enclosures, by request Watts Bar Nuclear Plant of site resident]
1260 Nuclear Plant Road Spring City, Tennessee 37381
FILING INSTRUCTIONS Date:." '/5Lo2 Pages to be Removed New Pages to be Inserted Page Page Part Number Revision Part Number Revision z/c-RI-24-32rpri 2132 LEVEL IA) 57-1-L, 2
7N 15-V 4 H44 Ce-7 77f~F
/
4" b~6~E 775 T-HE- &vA)oE/JF OF 77h-E-r7ofZ-DOPLEXIOG-
Emergency Environmental Radiological Monitoring Procedures CECC EPIP-9 AIR SAMPLE DATA Date:
Na I Scaler #
GM Scaler #:
Grab Air Sampler #
Na I Correction Factor:
GM Efficiency:
Cont. Run Sampler #
131 Iodine MDA = 2.0 E -9 (if bkg. < 255)
Particulate MDA = 2.0 E -9 (if bkg < 276)
Team
'3' Iodine jtCi/cc = (CPM) (Correction Factor)
Particulate p.Ci/cc =
(CPM) (4.505 E -10)
Members volume in liters (efficiency) (volume in liters)
(1 (2)
(3)
(4)
(16)
(12)
(13)
TEAM LOCATION degrees Start Run Flow Sample Plume Sample Counts Rates in CPM 131 Iodine Particulate Distance Bearing From Stop Time LPM Vol. -L E C ?
ID Bkg.
Gross.
Net
[Ci/cc ptCi/cc TVA PROTECTIVE ACTION LEVELS 3 A.
Radioiodine (1-131) air activity > 8.0 E-7 ltCi/cc (40 DAC)
Potassium Iodide (KI) recommended, notify Field Control.
4 A.
Particulate air activity > 1.2 E-7 RCi/cc (40 DAC)
Respiratory protection recommended, notify Field Control.
4 B.
Particulate air activity > 6.0 E-7 RCi/cc (200 DAC)
Respiratory protection mandatory, notify Field Control.
4 C.
Particulate air activity > 6.0 E-6 laCi/cc (2000 DAC)
Evacuation mandatory, notify Field Control.
[
One radioiodine DAC = 2.0 E -8 ýtCi/cc One particulate DAC = 3.0 E -9 4Ci/cc Line denotes revision Appendix G Page 29 1
Revision 24]
pond/EPIP9r24.doc
11il III 11111111111111!1I lll 2240827105 CHAT CECC EPIP CECC-EPIP-9 113001 24 CORR.
PG 29-31 REV.24
lEmergency Environmental Radiological Monitoring Procedures CECC EIPIP-9 TERRESTRIAL & FIXED-MONITOR SAMPLES Appendix H DATE:
TEAM MEMBERS:
(1)
(2)
(3)
(16)
TEAM LOCATION TIME SAMPLE REMARKS or SAMPLE DISTANCE DEGREES COLLECTED IDENTIFICATON Where SAMPLE was TRANSFERRED to POINT MILES BEARING FROM SAMPLE IDENTIFICATION ABBREVIATIONS P
Particulate (paper filter)
S Soil
} M Milk I
Radioiodine (charcoal filter)
V Vegetation WW Well Water TLD Environmental TLD SN Snow DWSS Drinking Water Surface Source /River RW Rainwater ICE Ice Line denotes revision Page 30 of 46 Revision 24 pond/EPIP9r24.doc
(
lEmergency Environmental Radiological Monitoring
(
CECC EPIP-9 TVA ENVIRONS MONITORING RECORD Appendix I Page I of 2 Page 31 of 46 Revision 2 4 11 Similar to form TVA 7918A Line denotes revision See next page for TVA PROTECTIVE ACTION LEVELS pond/EPIP9r24.doc IrroceuuresI ORIGIN CECC C3 RECORDED DATE:
TIME:
CECC USE ONLY RMCC 0 By:
JWBN RAC SITE C3 REVIEW:
APPENDIX F DATA TEAM SAMPLE DISTANCE DIRECTION TIME PLUME GM 1 METER mrem/hr GM CONTACT mrern/hr POINT MILES BEARING FROM TAKEN E C ?
ISM W / CLOSED W / OPEN ISM W / CLOSED W / OPEN APPENDIX G DATA
(_
(_)
)
()
(16)
(12)
(13)
TEAM SAMPLE DISTANCE DIRECTION TIME PLUME SAMPLE 131 IODINE AIR PARTICULATE AIR POINT MILES BEARING FROM TAKEN E C
'?
IDENTIFICATION l.Ci/cc jiCi/cc APPENDIX D DATA (17)
(3)
(18)
(19)
ALL DOSE UNITS IN MILLIREM INDIVIDUAL TIME DRD TOTAL DRD CORREC.
TEDE ESTIMATE TEDE LIMIT KI TAKEN'?
"AS READ" "AS READ" FACTOR "AS CORRECTED Yes/No Time
Emergency Environmental CECC EPIP-9.
Appendix I Page 32 of 46 Procedures TVA ENVIRONS MONITORING RECORD ea 2 of 2 Revision 24 TVA PROTECTIVE ACTION LEVELS IF THEN 1 A.
Any exposure rate > 25 mrem/hr and radiojodine (l-131)
Potassium Iodide (KI) recommended, notify Field air activity is not known.
Control.
I B. Any measured dose rate > 200 mrem/hr.
Evacuation recommended, notify Field Control.
1 C.
Any measured dose rate > 10 rem/hr.
Evacuation mandatory, notify Field Control.
2 A.
2 B.
TEDE dose of 25 rad.
Evacuate unless higher dose is authorized, notify Field Control.
Evacuation mandatory, notify Field Control.
One radioiodine DAC = 2.0 E -8 jiCi/cc One particulate DAC = 3.0 E -9 piCi/cc Line denotes revision
'nd/EPIPgr24.doc
(