ML020250242

From kanterella
Jump to navigation Jump to search
Revised Technical Specification Pages for Watts Bar, Unit 1
ML020250242
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 01/25/2002
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML020250242 (2)


Text

7OP DG Start instrumentation 3.3.5 Table 3.3.5-1 (page 1 of 1)

LOP DG Start Instrumentation FUNCTION REQUIRED SURVEILLANCE TRIP ALLOWABLE CHANNELS REQUIREMENTS SETPOINT VALUE PER BUS 6.9 kV Emergency Bus Undervoltage (Loss of Voltage)

a. Bus Undervoltage
b. Time Delay
2.

6.9 kV Emergency Bus Undervoltage (Degraded Voltage)

a. Bus Undervoltage 3

2 3

2

b. Time Delay SR 3.3.5.1 SR 3.3.5.2 SR 3.3.5.3 SR 3.3.5.1 SR 3.3.5.2 SR 3.3.5.3

_> 5994 V and

<_ 6006 V

> 0.73 see and

< 0.77 sec

> 6593.4 V and 6606.6 V

>9.73 see and 5 10.27 see

> 5967.6 V

> 0.58 see and

< 0.94 see

>_ 6570 V

Ž9.42 see and

< 10.49 see 2

3.

Diesel Generator Start 4

4.

Load Shed SR 3.3.5.1 SR 3.3.5.2 SR 3.3.5.1 SR 3.3.5.2

> 4733.4 V and

< 4926.6 V with an internal time delay of

_> 0.46 see and

  • - 0 54 see

>4733.4 V and

< 4926.6 V with an internal time delay of

> 2.79 see and

  • 3.21 see

>_ 2295.6 V with an internal time delay of 0 56 see at zero volts.

> 2295.6 V with an internal time delay of< 3.3 see at zero volts.

Watts Bar-Unit 1 I

3.3-51 Amendment%3

LOP DG Start ins:rumentation B 3.3.5 B 3.3 INSTRUMENTATION B 3.3.5 Loss of Power (LOP) Diesel Generator (DG)

Start Instrumentation BASES BACKGROUND The DGs provide a source of emergency power when offsite power is either unavailable or is insufficiently stable to allow safe unit operation.

Undervoltage protection will generate an LOP start if a loss of voltage or degraded voltage condition occurs in the switchyard.

There are four LOP start signals, one for each 6.9 kV shutdown board.

Three degraded voltage relays (one per phase) are provided on each 6.9 kV Shutdown Board for detecting a sustained undervoltage condition.

The relays are combined in a two-out-of-three logic configuration to generate a supply breaker trip signal if the voltage is below 96% for 10 seconds (nominal).

Additionally, three undervoltage relays (one per phase) are provided on each 6.9 kV Shutdown Board for the purpose of detecting a loss of voltage condition.

These relays are combined in a two-out-of-three logic to generate a supply breaker trip signal if the voltage is below 87% for 0.75 seconds (nominal).

Once the supply breakers have been opened, either one of two induction disk type relays, which have a voltage setpoint of 70% of 6.9 kV (nominal, decreasing) and an internal time delay of 0.5 seconds (nominal) at zero volts, will start the diesel generators.

Four additional induction disk type relays, in a logic configuration of one-of-two taken twice which have a voltage setpoint of 70% of 6.9 kV (nominal, decreasing) and an internal time delay of 3 seconds (nominal), at zero volts, will initiate load shedding of the 6.9 kV Shutdown Board loads and selected loads on the 480 V shutdown boards and close the 480 V shutdown boards' current limiting reactor bypass breaker.

The LOP start actuation is described in FSAR Section 8.3, "Onsite (Standby) Power System" (Ref.

1).

Trip Setpoints and Allowable Values The Trip Setpoints used in the relays and timers are based on the analytical limits presented in TVA calculations, References 3, 5, and 6.

The selection of these Trip Setpoints is such that adequate protection is provided when all sensor and time delays are taken into account.

(continued)

Amendment 36 Watts Bar-Unit 1 B 3.3-147