ML020230325

From kanterella
Jump to navigation Jump to search
Transmittal of Emergency Plan Implementing Procedure EPIP-APPX-A-06, Revision AA, for Kewaunee Nuclear Power Plant
ML020230325
Person / Time
Site: Kewaunee 
(DPR-043)
Issue date: 01/02/2002
From: Webb T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
NRC-02-001-010
Download: ML020230325 (17)


Text

NRC-02-001 Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, Wl 54241 NM C 920.388.2560 920.755.2321 Committed to Nuclear Excellence Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC January 2, 2002 10 CFR 50, App. E U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant RADIOLOGICAL EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURES Pursuant to 10 CFR 50 Appendix E, attached is the latest revisions to the Kewaunee Nuclear Power Plant Radiological Emergency Response Plan Implementing Procedures (EPIPs). These revised procedures supersede the previously submitted procedures.

Pursuant to 10 CFR 50.4, two additional copies of this letter and attachment are hereby submitted to the Regional Administrator, U. S. Nuclear Regulatory Commission, Region III, Lisle, Illinois. As required, one copy of this letter and attachment is also submitted to the Kewaunee Nuclear Power Plant NRC Senior Resident Inspector.

Sincerely, Thomas J. Webb Site Licensing Director SLC Attachment cc -

US NRC Senior Resident Inspector, w/attach.

US NRC, Region III (2 copies), w/attach.

Electric Division, PSCW, w/o attach.

QA Vault, w/attach.

KEWAUNEE NUCLEAR POWER PLANT December 21, 2001 EMERGENCY PLAN IMPLEMENTING PROCEDURES TRANSMITTAL FORM RETURN TO DIANE FENCL - KNPP OUTSIDE AGENCY COPIES (1-20)

T. Webb - NRC Document Control Desk (1)*

Krista Kappelman - PBNP - EP (10)*

T. Webb - NRC Region HI (2 & 3)*

Craig Weiss - Wisconsin Power & Light (11)*

T. Webb - NRC Resident Inspector (4) (receives Appx. A phone numbers)*

T. Webb - State of Wisconsin (5)*

Jim Holthaus - Nuclear Management Company (12)*

T. Webb - KNPP QA Vault w/NRC Letter (15)*

PERSONAL COPIES (21-40) These copies are for the personal use of the listed individuals for reference or emergency response.

J. Bennett (33)

D. Masarik (32)

D. Mielke (35)

D. Seebart (24)

H. Kocourek (13)

B. Bartelme (34)

T. Coutu (28)

REFERENCE COPIES - CUSTODIAN (41-100) These copies are for general reference by anyone. They are distributed throughout the plant and corporate offices. The named individual is the responsible custodian for the procedures and shall insure they are properly maintained.

STF (86, 87, 88)

L. Welch - Fuel Services (65)

NO Library - KNPP (59)

C. Sternitzky - ATF-2 (44)

D. Braun - ATF-3 (45)

P. Ehlen - I&C Office (42)

M. Daron - Security Building (46)

P&FS Adm - GB D2-3 (EOF) (81)

H. Kocourek - OSF (52)

C. Hutter - ATF-1 (64)

LOREB - STF (62, 66, 67, 68, 70, 72, 73, 74)

STF Library (43)

Resource Center (82, 89, 94, 131)

D. Schrank - Maintenance Off. (41)

D. Krall - CR/SS Office (51, 56)

P&FS Adm - GB-D2 (Nuclear Library) (84)

H. Kocourek - TSC (50)

W. Galarneau - RAF (53)

W. Galarneau - SBF/EMT (54)

W. Galarneau - RPO (55)

WORKING COPIES (101-199) These copies of procedures are kept in the areas designated for use in response to an emergency. These are not complete sets, but contain only those procedures that are used to implement activities in the location where they are kept. Please dispose of any sections distributed that are not tabbed in the indicated copy.

W. Galarneau - RAF/RPO (106, 107)

W. Galarneau - SBF/ENV (108, 109)

W. Galarneau - SBF/EM Team (110, 111, lllA)

W. Galarneau - Aurora Medical Center (118, 119)

W. Flint - Cold Chem/HR Sample Room (113)

N. Deda - SBF/SEC (114)

D. Krall - CR/Communicator (116)(Partial Distribution)

Simulator/Communicator (117)

M. Fencl - Security (121)

N. Deda - Security Building (120)

S. VanderBloomen (125)

J. Stoeger (126)

Originals to KNPP QA Vault Please follow the directions when updating your EPIP Manual. WATCH FOR DELETIONS!!! These are controlled procedures and random checks may be made to ensure the manuals are kept up-to-date.

  • THIS IS NOT A CONTROLLED COPY. ITIS A COPYFOR INFORMATION ONLY.

I

KEWAUNEE NUCLEAR POWER PLANT REVISION OF EMERGENCY PLAN IMPLEMENTING PROCEDURES December 21, 2001 Please follow the directions listed below. If you have any questions regarding changes made to the EPIPs, please contact Dave Seebart at ext. 8719. If you are a controlled copy holder (see cover page), return this page to Diane Fencd by January 21, 2002, SIGNED AND DATED to serve as a record of revision.

EPIP Index, dated 12-21-2001.

Diane Fendl Enclosure 2

I CERTIFY Copy No._____ (WPSC No.) of the Kewaunee Nuclear Power Plant's EPIPs has been updated.

SIGNATURE DATE Please return this sheet to DIANE FENCL.

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 12-21-2001 PROC. NO.

TITLE REV.

DATE EPIP-AD-01 EPIP-AD-02 EPIP-AD-03 EPIP-AD-04 EP-AD-5 EPIP-AD-05 EP-AD-6 EPIP-AD-07 EP-AD-8 EP-AD-9 EP-AD-10 EPIP-AD-11 EP-AD-12 EP-AD-13 EP-AD-13A EP-AD-13B EP-AD-13C EP-AD-14 EPIP-AD-15 EP-AD-16 EP-AD-17 EPIP-AD-18 EPIP-AD-19 EP-AD Personnel Response to the Plant Emergency I

Siren Emergency Class Determination AC KNPP Response to an Unusual Event AD KNPP Response to Alert or Higher AF Deleted C

Deleted AN Deleted Deleted Deleted Q

Deleted Deleted Deleted Deleted Deleted Deleted 0

Site Emergency Emergency Response Organization Shift Relief SGuideline General Emergency Initial Emergency Notifications Notification of Alert or Higher Notification of Site Emergency Notification of General Emergency Emergency Radiation Controls Personnel Assembly and Accountability Personnel Evacuation Limited Area Evacuation Emergency Assembly/Evacuation Site Evacuation Search and Rescue Recovery Planning and Termination Occupational Injuries or Vehicle Accidents During Emergencies Communications Potassium Iodide Distribution Protective Action Guidelines 03-05-84 06-05-2001 11-27-2001 PAGE 1 OF 11 Deleted 03-14-97 Deleted 0

Q 1-12-14-2001 11-15-2001 12-14-2001 12-14-2001 04-27-87 06-05-2001 04-24-87 11-15-2001 02-26-96 04-27-87 04-27-87 09-27-2001 03-26-94 04-25-94 03-01-83 03-01-83 03-01-83 05-25-94 10-30-2001

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 12-21-2001 PROC. NO.

TITLE REV.

DATE EPIP-AD-20 KNPP Response to a Security Threat A

11-15-2001 EP-ENV EPIP-ENV-01 Environmental Monitoring Group Organization V

10-02-2001 and Responsibilities EPIP-ENV-02 Environmental Monitoring Team Activation X

10-02-2001 EP-ENV-3A Environmental Protection Director Actions and Deleted 09-26-84 Directives EP-ENV-3B EM Team Actions Deleted 09-26-84 EPIP-ENV-03C Dose Projection Using RASCAL Version 2.2 V

10-09-2001 Software EP-ENV-3D Revision and Control of ISODOSE 11 Deleted 02-14-95 EP-ENV-3E Manual Determination of X/Q Deleted 04-24-87 EP-ENV-3F Manual Determination of X/Q (Green Bay Deleted 05-30-86 Meteorological Data)

EP-ENV-3G Manual Dose Projection Calculation Deleted 06-02-89 EP-ENV-3H Protective Action Recommendations Deleted 04-13-90 EPIP-ENV-04A Portable Survey Instrument Use S

06-15-2000 EPIP-ENV-04B Air Sampling and Analysis W

10-09-2001 EP-ENV-4C Environmental Monitoring Teams Deleted 04-13-90 EPIP-ENV-04C Ground Deposition Sampling and Analysis W

10-09-2001 EPIP-ENV-04D Plume Tracking for Environmental Monitoring N

10-02-2001 Teams EP-ENV-5A LCS-1 Operation Deleted 04-14-86 EP-ENV-5B MS-3 Operation Deleted 04-14-86 EP-ENV-5C SAM II Operation Deleted 04-14-86 EP-ENV-5D PAC-4G (Alpha Counter) Operation Deleted 04-14-86 EP-ENV-5E Reuter-Stokes Operation Deleted 08-27-85 PAGE 2 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES DATE: 12-21-2001 PROC. NO.

TITLE EP-ENV-6 Data Analysis, Dose Projections and Protective Action Recommendations EP-ENV-6 Alternate Sample Analysis and Relocation of EM Team EP-ENV-6A Relocation of Site Access Facility (Habitability)

EP-ENV-6B SAF Environmental Sample Analysis Relocation EP-ENV-7 Site Access Facility Communications EP-ENV-8 Total Population Dose Estimate Calculations EP-EOF EP-EOF-1 Corporate Emergency Response Organization EPIP-EOF-02 Emergency Operations Facility (EOF) Activation EPIP-EOF-03 EOF Staff Action for Unusual Event EPIP-EOF-04 EOF Staff Action for Alert or Higher EP-EOF-5 Corporate Staff Action for Site Emergency EP-EOF-6 Corporate Staff Action for General Emergency EP-EOF-7 Notification of Unusual Event EP-EOF-8 Relocation of EOF EPIP-EOF-08 Continuing Emergency Notifications EP-EOF-9 Interface with Support Organizations EP-EOF-9 Notification of Site Emergency EP-EOF-10 Notification of General Emergency EPIP-EOF-I1 Internal Communication and Documentation Flow EPIP-EOF-12 Media Center/Emergency Operation Facility/Joint Public Information Center Security REV.

DATE Deleted 04-14-86 Deleted 03-23-84 Deleted 03-23-84 Deleted 09-26-84 Deleted 04-14-86 Deleted Z

AB AH Deleted Deleted Deleted Deleted T

Deleted Deleted Deleted U

P 03-11-94 11-29-2001 12-14-2001 12-14-2001 04-24-87 04-24-87 04-06-94 03-01-83 11-27-2001 03-05-84 04-24-87 04-24-87 11-15-2001 07-19-200 1 PAGE 3 OF 11 INDEX 12-21-81 Deleted

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 12-21-2001 PROC. NO.

TITLE REV.

DATE 11 PAGE 4 OF 11 EP-OP EP-OP-1 Control Room Emergency Organization Deleted 04-24-87 EP-OP-2 Emergency Control Room Activation for Deleted 04-24-87 Emergency Response EP-OP-3 Control Room Communications Deleted 04-24-87 EP-OSF EP-OSF-1 Operation Support Facility Emergency Deleted 04-24-87 Organization EPIP-OSF-02 Operational Support Facility Operations T

11-29-2001 EPIP-OSF-03 Work Requests During an Emergency 0

09-27-2001 EP-OSF-4 Operational Support Facility Communications Deleted 04-24-87 EPIP-OSF-04 Search and Rescue D

09-12-2000 EP-RET EP-RET-1 Radiation Emergency Team Organization Deleted 04-16-96 EPIP-RET-02 In-Plant Radiation Emergency Team U

11-27-2001 EPIP-RET-02A Radiation Protection Office/Radiological T

11-29-2001 Analysis Facility (RPO/RAF) Activation EP-RET-2B Gaseous Effluent Sample and Analysis Q

03-03-98 EP-RET-2C Containment Air Sampling and Analysis Deleted 03-01-83 EPIP-RET-02D Emergency Radiation Entry Controls and M

06-12-2001 Implementation EP-RET-2E Handling of Injured Personnel Deleted 04-16-96 EP-RET-2F Personnel Decontamination Deleted 04-13-90 EPIP-RET-03 Chemistry Emergency Team 0

C2-01-2000 EPIP-RET-03A Liquid Effluent Release Paths L

11-29-2001 EP-RET-3B Post-Accident Reactor Coolant Alternate Deleted 01-25-88 Sampling Procedure

EMERGENCY PLAN IMPLEMENTING PROCEDURES DATE: 12-21-2001 PROC. NO.

TITLE REV.

DATE EP-RET-3C EP-RET-3D EP-RET-3E EPIP-RET-04 EP-RET-4A EPIP-RET-04A EP-RET-4B3 EP-RET-4C EP-RET-4D EP-RET-5 EPIP-RET-05 EEP-RET-5AA05 PEP-RET-6 IE PP-RET-7 EPIP-PRET-08 EPIP-RET-09 Post Accident Operation of the High Radiation Sample Room Containment Air Sampling Analysis Using CASP Post Accident Operation of High Rad Sample Room Inline Multiported Count Cave SBF Activation EOF Radiological Monitoring SBF Operation/Relocation Radiological Controls at Site Access Facility Site Radiological Monitoring SAM-fl Operation Plume Projection Site Boundary Dose Rates During Controlled Plant Cooldown Plume Projection Dose Projection Radiological Analysis Facility/Radiation Protection Office Communications M

01-18-2000 Deleted 08-27-85 R

Deleted Deleted Deleted Deleted Deleted Deleted H

Deleted Deleted Deleted Contamination Control of the Aurora Medical P

Center Post-Accident Population Dose K

EP-SEC Security Organization Deleted Security Force Response to Emergencies W

Manual Activation of Emergency Sirens Deleted Personnel Assembly and Accountability AC Security Force Actions for Dosimetry Issue P

PAGE 5 OF 11 INDEX 01-18-2U000 0

10-02-2001 03-10-83 10-02-2001 07-12-94 07-12-94 07-12-94 09-26-84 10-09-2001 04-27-87 04-24-87 04-24-87 10-30-2001 08-29-2000 04-24-87 08-28-2001 04-16-82 12-14-2001 10-02-2001

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 12-21-2001 EP-TSC-6 EPIP-TSC-07 EPIP-TSC-08A Assessment of Reactor Core Damage RV Head Venting Time Calculation Calculations for Steam Release from Steam Generators Deleted I

N V2 09-30-86 10-19-2001 12-14-2001 I nrnY-90l EPIP-TSC-08B*

STMRLS Computer Program 10-02.....

EP-TSC-8C*

See EP-TSC-8B Deleted 04-16-92

Core Damage Assessment I

02-23-99 EPIP-TSC-09B*

CORE Computer Program J

10-02-2001 EP-TSC-9C*

See EP-TSC-9B Deleted 04-16-92

EPTP-TSC-10 I Technical Support for IPEOPs I

03-20-2001 PAGE 6 OF 11 PROC. NO.

TITLE REV.

DAI h 1

EP-SEC-5 Security Force Response to the EOF Deleted 07-28-88 EPIP-SEC-05 Personnel Evacuation F

07-05-2001 EP-TSC EPIP-TSC-01 Technical Support Center Organization and P

10-02-2001 Responsibilities EPIP-TSC-02 Technical Support Center Activation S

11-29-2001 EPIP-TSC-03 Plant Status Procedure V

10-09-2001 EPIP-TSC-04 Emergency Physical Changes, Major Equipment M

10-02-2001 Repair EP-TSC-5 Technical Support Center Communications Deleted 04-24-87 Equipment

EMERGENCY PLAN IMPLEMENTING PROCEDURES DATE: 12-21-2001 FIGURES EPIP FIG #

Figure EPIPFG DESCRIPTION REV.

DATE BI61220 EP-SEC-5 EPIP-APPX-A-06 EP-FIG-003 EPIP-APPX-A-06+/-

EP-FFIG-O05 PIP-APPX-A-06 PIP-EOF-12 orm EPIPF-EOF-02-01 Technical Support APPX-A-06-03 Center - KNP Floor Plan Site Boundary Facility APPX-A-06-02 KNP Floor Plan EP-FIG-00o APPX-A-06-01 EP-F;IG-009 EEOF-12-01 SpIP-APPX-A-06 EP-FIG-012 APPX-A-06-08

pIP-APPX-A-06 EP-FIG-013 APPX-A-06-09 gPIP-AD-19 EP-FIG-014 AD-19-01 PIP-APPX-A-06 EP-FIG-022 APPX-A-06-04 E

FF E

E E

EOF-12-02 SEC-05-01 APPX-A-6 EP-FIG-034 EPIP-EOF-12 EPIP-APPX-A-06 APPX-A-6 APPX-A-6 EPIP-OSF-02 EPIP-OSF-02 EP-FIG-035 APPX-A-06-06 EP-FIG-037 EP-FIG-038 EP-FIG-039 EP-FIG-039A EPIP-APPX-A-06 EP-FIG-043 EPIP-APPX-A-06 EP-rIG-o44 EPIP-APPX-A-06 EP-FIG-045 RET-08 EP-FIG-046 EPIP-APPX-A-02 11 OSF-02-01 High Priority Work OSF-02-02 Lower Priority Work JPIC - Federal Work APPX-A-06-10 Area - WPSC D2-9 JPIC - State and County Work Area APPX-A-06-07 WPSC D2-8 JPIC - Utility Work A.PPX-A-06-05 Area - WPSC D2-7 Aurora Medical Center RET-08-01 Location A-PPX-A-02-01 ERO Call Tree A

10-31-2000 A

10-31-2000 B

10-24-2000 C

10-31-2000 A

10-31-2000 A

10-31-2000 C

10-30-2001 Radiological Analysis Facility - KNP Floor Plan Division Office Building (2nd Floor) Floor Plan State/County Work Area - WPSC D2-1 Floor Plan NRC Work Area WPSC D2-4 Floor Plan Population Distribution by Geographical Sub Areas (with sectors)

EOF - WPSC D2-3 Floor Plan Map - Location of JPIC, MBC, GOB, DOB, etc.

Site Map Floor Plan - Media Briefing Center General Office Building - WPSC (1st Floor) Floor Plan Floor Plan - Corporate Response Center Floor Plan - JPIC 09-27-2001 09-27-2001 Deleted 08-04-98 C

10-24-2000 Deleted Aleted A

A 08-04-98 08-04-98 10-02-200 10-02-200 B

12-21-200 C

12-21-200 C

12-21-200 A

Deleted 00 200

-FIGU-ES PAGE 7 OF 11 INDEX EPIP-EOF-12 EP-SEC-5 EP-FIG-024 EP-FIG-026 I

B B

B 06-12-2001 1

1 1

0 1

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX I

----

I 1CL V ILJi

NUMBER TITLE APPENDIX A APPX-A-1 Communication System Description EPIP-APPX-A-02 Response Personnel Call List EPIP-APPX-A-03 Off-Site Telephone Numbers EPIP-APPX-A-06 KNPP Emergency Response Facility Telephone Numbers PAGE 8 OF 11 DATE: 12-21-2001 AF BM BO AA 08-04-98 12-04-2001 12-04-2001 12-21-2001 km V 131"IN I

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 12-21-2001 PAGE 9 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 12-21-2001 FORM EPIPF TITLE REV.

DATE EP-RET RET-02A-02 Emergency Sample Worksheet E

06-05-2001 RET 2B. 1 Containment Stack Release (Grab Sample)

C 04-16-96 RET 2B.2 Auxiliary Building Stack (Grab Sample)

C 04-16-96 RET 2B.3 Auxiliary Building Stack (Sping Reading)

C 04-16-96 RET 2B.4 Containment Stack (Sping Reading)

B 04-16-96 RET 2B.5 Steam Release C

04-16-96 RET 2B.6 Field Reading (Grab Sample)

A 04-16-96 RET-04-01 SAM-2 Counting Equipment Worksheet E

06-12-2001 RET 8.3 Hospital Survey 1 Deleted 06-05-2001 RET 8.4 Hospital Survey 2 Deleted 07-25-97 RET 8.5 Hospital Survey 3 Deleted 07-25-97 RET-08-06 Hospital Survey 4 F

06-15-2000 RET 9 Environmental TLD Record Sheet C

02-14-95 EP-SEC SEC-03.01 Emergency Accountability Log A

03-28-2000 SEC 4.1 Emergency Dosimeter Log F

02-16-2000 EP-TSC TSC 1.1 Plant Status Summary for SAM Implementation A

04-01-99 TSC 1.2 Severe Accident Management Summary and Strategy A

04-01-99 Recommendation TSC 1.3 Severe Accident Management-Status A

04-01-99 TSC-02-01 TSC and OSF Activation Checklist 0

09-27-2001 TSC 2.2 TSC Ventilation Checklist H

04-01-99 TSC-02-03 Emergency Response Data System (ERDS) Link Initiation G

05-04-2001 Checklist PAGE 10 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 12-21-2001 FORM EPIPF TITLE REV.

DATE TSC-02-04 TSC Chart Recorder Operation Checklist D

01-30-2001 TSC-02-05 TSC and OSF De-activation Checklist A

10-09-2001 TSC-03-01 Plant System Status L

06-12-2001 TSC-03-02 Plant Equipment Status L

06-12-2001 TSC-03-03 Environmental Status Board J

06-12-2001 TSC-03-04 Radiation Monitors H

06-12-2001 TSC-04-01 Emergency Physical Change Request F

08-29-2000 TSC-04-02 Emergency Physical Change Safety Review F

08-29-2000 TSC-04-03 Emergency Physical Change Index F

08-29-2000 TSC-07-01 Head Venting Calculation F

10-31-2000 TSC-08A-01 Steam Release Data Sheet (Energy Balance)

H 12-14-2001 TSC-08A-02 Steam Release Calculation Sheet (Energy Balance)

G 12-14-2001 TSC-08A-03 Steam Release Data/Calculation Sheet (Open Valve)

E 12-14-2001 TSC-08A-04 Steam Release Data/Calculation Sheet (STMRLS D

12-14-2001 Program)

TSC 9A. 1 Core Damage Based on Reactor Vessel Level & Fuel Rod C

02-14-95 Temp.

TSC 9A.2 Core Damage Based on Radiation Monitors C

02-14-95 TSC 9A.3 Cs-134 and Cs-137 PCF Determination D

04-16-96 TSC 9A.4 Core Damage Based on Activity Ratios C

02-14-95 TSC 9A.5 Core Damage Assessment (Monitoring Data)

D 04-16-96 TSC 9A.6 Core Damage Summary C

02-14-95 PAGE 11 OF 11

WISCONSIN PUBLIC SERVICE CORP.

No.

EPIP-APPX-A-06 Rev.

AA Title KINPP Emergency Response Facility Kewaunee Nuclear Power Plant Telephone Numbers Emergency Plan Implementing Procedure Date DEC 2 12001 Page 1 of 1 Reviewed By (Z 0211L-,

/Vs Approved By (2

Nuclear 0 Yes PORC 0 Yes SRO Approval Of 0 Yes Safety Review Temporary Related 0 No Required i] No Changes Required

] No 1.0 Purpose 1.1 This procedure provides instruction for detailed listings of telephone numbers by facility(s) and facility work group(s). The floor plans of these facilities, which indicates the location of each telephone station, are attached to this procedure.

2.0 General Notes 2.1 This Appendix may be used as a reference document for any declared emergency, as defined in EPIP-AD-02, "Emergency Classification."

3.0 Precautions and Limitations 3.1 None 4.0 Initial Conditions 4.1 None 5.0 Procedure 5.1 Changes in data which have occurred in the current quarter will not be reflected in this Appendix.

6.0 Final Conditions 6.1 Plant Emergency has been Terminated or Recovery actions have begun and the Emergency Response Manager has suspended the use of EPIPs.

7.0 References 7.1 EPMP-05.03, Telephone Number Quarterly Review 7.2 Figure EPIPFG-APPX-A-06-01, Radiological Analysis Facility - KNP Floor Plan 7.3 Figure EPIPFG-APPX-A-06-02, Site Boundary Facility - KNP Floor Plan 7.4 Figure EPIPFG-APPX-A-06-03, Technical Support Center - KNP Floor Plan 7.5 Figure EPIPFG-APPX-A-06-04, EOF - WPSC D2-3 Floor Plan n-\\nucdoc\\procedures\\draft\\epip\\eappxa06.doc-Diane Fend/Diane Fend-Jeanne Ferris

7.6 Figure EPIPFG-APPX-A-06-05, JPIC - Utility Work Area - WPSC D2-7 7.7 Figure EPIPFG-APPX-A-06-0 6, General Office Building - WPSC (1st Floor) Floor Plan 7.8 Figure EPIPFG-APPX-A-06-07, JPIC - State and County Work Area - WPSC D2-8 7.9 Figure EPIPFG-APPX-A-06-08, State/County Work Area - WPSC D2-1 Floor Plan 7.10 Figure EPIPFG-APPX-A-06-09, NRC Work Area - WPSC D2-4 Floor Plan 7.11 Figure EPIPFG-APPX-A-06-10, JPIC - Federal Work Area - WPSC D2-9 7.12 64.1, Prairie Systems Fax Broadcasting (WPS Public Affairs Department Procedure) 7.13 EPIP-AD-02, Emergency Class Determination 8.0 Records 8.1 The following QA records and non-QA records are identified in this directive/procedure and are listed on the KNPP Records Retention Schedule. These records shall be maintained according to the KNPP Records Management Program.

8.1.1 QA Records None 8.1.2 Non-GA Records None

EMERGENCY RESPONSE FACILITY TELEPHONE NUMBERS EPIP-APPX-A-6 The data contained on these pages has been intentionally omitted from external copies of this document.

This data is withheld to ensure the privacy of the employees of Wisconsin Public Service Corporation and off-site support groups which have supplied personal information for internal use by Wisconsin Public Service Corporation. It has also been done to ensure the security of the Kewaunee Nuclear Power Plant Emergency Communications Systems.

All company-held copies of this appendix do contain the telephone numbers and other communications data needed to ensure a prompt response of on-site and off-site support groups over the established communications systems.

S.

~an3 of 16 Appendix A-6 EPIP-APPX-A-06 Rev. AA uate:

DEC 2 1 2001 Pane 3 of 16