Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of Tennessee Valley Authority WATTS BAR NUCLEAR PLANT (WBN)
DECEMBER OPERATING REPORT Docket Nos.
50-390 2001 MONTHLY Enclosed is the December 2001 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4.
If you have any questions concerning this matter, please call me at (423) 365-1824.
Sincerely, P.'-L. Pace Manager, Licensing and Industry Affairs Enclosure cc:
See page 2
/2 Printed on recycled paper JAN 1 5 2002
) )
U.S. Nuclear Regulatory Commission Page 2
'iAN 15 2002 cc (Enclosure)
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr.
L.
Mark Padovan, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85 Atlanta, Georgia 30303
ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)
MONTHLY OPERATING REPORT DECEMBER 2001 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1
OPERATING DATA REPORT Docket No.
50-390 Unit Name:
WBN Unit 1 Date:
January 4, 2002 Completed By:
D. K. Flournoy Telephone:
(423) 365-3803 Reporting Period:
December 2001
- 1.
Design Electrical Rating (MWe-Net):
1155 (see note below)
- 2.
Maximum Dependable Capacity (MWe-Net):
1125 Month Year-to-Date Cumulative
- 3.
Number of Hours Reactor was Critical 715.9 8450.3 45099.0
- 4.
Hours Generator On-Line 710.4 8421.3 44900.4
- 5.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 6.
Net Electrical Energy Generated (MWh) 816161 9626575 49386716 Note:
The Design Electrical Rating (MWe-Net) has been adjusted from 1168 Mwe to 1155 Mwe to reallocate dual unit common loads to Unit 1 only.
E-2
UNIT SHUTDOWNS DOCKET NO:
50-390 UNIT NAME:
WBN-1 DATE:
January 4, 2002 COMPLETED BY:
D. K. Flournoy TELEPHONE:
(423) 365-3803 REPORT PERIOD: December 2001 03 011219 F
33.6 G
32001-04 JJ BKR Unitl1experienced an automatic turbine/reactor trip at approximately 2319 EST on December 19, 2001. The unit trip resulted from an invalid AMSAC signal.
The AMSAC signal was generated during the placement of a hold order for maintenance of the turbine driven auxiliary feedwater (TDAFW) pump. This activity included the opening of breakers which supply power to the instrument loops for the TDAFW level control valves. The loss of power to the instruments generated an invalid steam generator lo lo level signal which resulted in
_____th_
_initiation te intiatinAofanCAMACgsgnal
'F: Forced 2 Reason:
3 Method 4 Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Trip/Scram Event Report (LER)
C-Refueling 3-Automatic Trip/Scram (NUREG - 1022)
D-Regulatory Restriction 4-Continuation Outage E-Operator Training / License Examination 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Summary:
Following the reactor trip, WBN Unit 1 returned to power production at 08:55 EST on December 21, 2001. Once returned to service, the unit operated at or near 100% power for the balance of the month. No additional significant power reductions or shutdowns occurred during December 2001. There were no challenges to the pressurizer power operated relief valves or pressurizer safety valves during the month of December 2001.