ML020180019

From kanterella
Jump to navigation Jump to search
December 2001 Monthly Operating Report for Vogtle
ML020180019
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/14/2002
From: Beasley J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LCV-1512-L
Download: ML020180019 (7)


Text

J. Barnie Beasley, Jr., P.E.

Southern Nuclear Vice President Operating Company, Inc.

Vogtle Project 40 Inverness Center Parkway P.O. Box 1295 Birmingham, Alabama 35201 Tel 205.992.7110 Fax 205.992.0403 January 14, 2002 Docket Nos.

50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - DECEMBER 2001 Enclosed are the December 2001 monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.

Sincerely, JBB/JLL Enclosures El-VEGP Unit 1 Monthly Operating Report - December 2001 E2-VEGP Unit 2 Monthly Operating Report - December 2001 cc:

Southem Nuclear Operating Company Mr. M. Sheibani SNC Document Management U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. R. R. Assa, Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle SOUTHERN COMPANY Energy to Serve Your Wo rldS LCV-1512-L

ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR DECEMBER 2001 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-i UNIT SHUTDOWNS and NARRATIVE REPORT Page E1-2

OPERATING DATA REPORT 50-424 VEGP UNIT 1 January 1, 2002 Andrew R. Cato III (706) 826-3823 Operating Status

1. Reporting Period:
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):

December -2001 1169 1148 This Month Number Of Hours Reactor Was Critical:

Hours Generator On Line:

Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWHe):

744.0 744.0 0.0 880,247 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Description N/A N/A N/A E1-1 Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

4.
5.
6.

7.

Year-To-Date 8734.1 8665.2 0.0 10,144,382 Cumulative 114,609.5 113,152.6 0.0 126,446,066

UNIT SHUTDOWNS Reporting Period:

Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-424 VEGP UNIT 1 January 1, 2002 Andrew R. Cato III (706) 826-3823 December - 2001 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS:

EVENT:

CAUSE:

CORRECTIVE ACTION:

CRITICAL PATH WAS:

NARRATIVE REPORT December 01, 2001 00:00 Unit 1 at 100% power with no significant operating problems.

December 31, 2001 23:59 Unit 1 at 100% power with no significant operating problems.

El -2

ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR DECEMBER 2001 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2

OPERATING DATA REPORT 50-425 VEGP UNIT 2 January 1, 2002 Andrew R. Cato III (706) 826-3823 Operating Status

1. Reporting Period:
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):
4. Number Of Hours Reactor Was Critical:
5. Hours Generator On Line:
6. Unit Reserve Shutdown Hours:
7. Net Electrical Energy Generated (MWHe):

December - 2001 1169 1149 This Month 744.0 744.0 0.0 883,691 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES E2-1 Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

Year-To-Date 8,126.6 8,112.7 0.0 9,456,679 Cumulative 101,053.8 100,240.7 0.0 112,792,466 Date Tag No.

Event Description N/A N/A N/A

UNIT SHUTDOWNS Reporting Period:

Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-425 VEGP UNIT 2 January 1, 2002 Andrew R. Cato III (706) 826-3823 December - 2001 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTIONICOMMENTS:

EVENT:

CAUSE:

CORRECTIVE ACTION:

CRITICAL PATH WAS:

NARRATIVE REPORT December 01, 2001 00:00 Unit 2 at 100% power with no significant operating problems.

December 31, 2001 23:59 Unit 2 at 100% power with no significant operating problems.

E2-2