ML020170261
| ML020170261 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 01/16/2002 |
| From: | NRC/NRR/DLPM |
| To: | |
| References | |
| TAC MB3420, TAC MB3421 | |
| Download: ML020170261 (2) | |
Text
6.0 ADMINISTRATIVE CONTROLS 6.8 PROCEDURES AND PROGRAMS 6.8.1 Written below:
procedures shall be established, implemented and maintained covering the activities referenced
- a.
The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Rev. 2, February 1978.
- b.
Deleted.
- c.
Deleted.
- d.
PROCESS CONTROL PROGRAM implementation.
- e.
OFFSITE DOSE CALCULATION MANUAL implementation.
- f.
Quality Assurance Program for effluent and environmental monitoring using the guidance in Regulatory Guide 1.21, Rev. 1, June 1974, and Regulatory Guide 4.1, Rev. 1, April 1975.
- g.
Component Cyclic or Transient Limits program, which provides controls to track the UFSAR, Section 4.1, cyclic and transient occurrences to ensure that components are maintained within the limits.
- h.
Fire Protection Program implementation.
6.8.2 Each procedure and administrative policy of Specification 6.8.1 above, and changes thereto, including temporary changes, shall be reviewed prior to implementation as set forth in Quality Assurance Program Description, Appendix C, Section 6.5.
6.8.3 Deleted.
COOK NUCLEAR PLANT-UNIT 1 Page 6-6 AMENDMENT 7-2, 154, 189,192,
--4, 248, -6, 261
6.0 ADMINISTRATIVE CONTROLS 6.8 PROCEDURES AND PROGRAMS 6.8.1 Written procedures shall be established, implemented and maintained covering the activities referenced below:
- a.
The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Rev. 2, February 1978.
- b.
Deleted.
- c.
Deleted.
- d.
PROCESS CONTROL PROGRAM implementation.
- e.
OFFSITE DOSE CALCULATION MANUAL implementation.
- f.
Quality Assurance Program for effluent and environmental monitoring using the guidance in Regulatory Guide 1.21, Rev. 1, June 1974, and Regulatory Guide 4.1, Rev. 1, April 1975.
- g.
Component Cyclic or Transient Limits program, which provides controls to track the UFSAR, Section 4.1, cyclic and transient occurrences to ensure that components are maintained within the limits.
- h.
Fire Protection Program implementation.
6.8.2 Each procedure and administrative policy of Specification 6.8.1 above, and changes thereto, including temporary changes, shall be reviewed prior to implementation as set forth in Qualification Assurance Program Description, Appendix C, Section 6.5.
6.8.3 Deleted.
COOK NUCLEAR PLANT-UNIT 2 Page 6-6 AMENDMENT 64, +-38, 4-75, -8, 486, 49-2, 0, 244