MONTHYEARML15188A0292015-06-25025 June 2015 Notification of a Change in Level 1 Management for the University of Texas at Austin Nuclear Engineering Teaching Laboratory (NETL) ML13282A3722014-03-10010 March 2014 G20110579: Letter to Licensees for Petitioner Fettus Petition IR 05000369/20115012011-08-18018 August 2011 IR 05000369-11-501 and 05000370-11-501; August 8 - 12, 2011; William B. McGuire Nuclear Station, Units 1 and 2; Exercise Evaluation IR 05000062/20022022005-09-0202 September 2005 IR 05000062-02-202 Decommissioning Activities & Confirmatory Radiation Surveys Performed by Our Contractor Oak Ridge Institute for Science & Education (Orise), at the University of Virginia ML0618002392005-08-23023 August 2005 Revised Final Report - Confirmatory Survey of the University of VA Reactor, University of VA, Charlottesville, VA ML0518600812005-06-30030 June 2005 Official Response to Questions Received in E-mail Dated May 18, 2005 from Dan Hughes to Paul Benneche, Which Were Subsequently Discussed in a Conference Call on May 19, 2005 ML0509101282005-03-30030 March 2005 University of Virginia Reactor Facility 2004 Annual Report ML0435000172004-12-0909 December 2004 University of Virginia Response to Request for Additional Information Concerning the University of Virginia Final Status Survey Report, License No. R-66 ML0417604772004-06-30030 June 2004 Univ of VA Reactor Decommissioning Project, License R-66 Termination Request, Volume 1, Narrative ML0412006732004-04-19019 April 2004 Letter Forwarding Revised University of Virginia Reactor Facility Emergency Plan and Revision 6 to Emergency Plan Implementing Procedure ML0407702982004-03-31031 March 2004 Approval of Final Status Survey Plan Coverage Change for License No. R-66 - University of Virginia ML0409201152004-03-30030 March 2004 Univ. of Virginia Reactor & Cavalier Reactor Annual Report for Licenses R-66 & R-123 for Period January 1, 2003 Through December 31, 2003 ML0402602862004-01-22022 January 2004 University of Virginia - Master Final Status Survey Plan and Addenda 001-008 ML0400902592004-01-0707 January 2004 Notification of Need for Additional Time to Submit Response to NRC Letter (from Daniel Hughes) Regarding Questions on Master Final Status Survey Plan and Addenda 001-008 for License No. R-66 and R-123 ML0334601692003-12-0505 December 2003 Request for Approval of Final Status Survey Plan Coverage Consistent with Marssim Requirements for University of Virginia Reactor ML0321006482003-07-25025 July 2003 Transmittal of University of Virginia Reactor Decommissioning Project Continuing Characterization Summaries: Reactor Pool Soil Areas, Reactor Pool Interior, Plant Stack; Laboratory Rooms M008 & M005, Demineralizer Room; Hot Cell Room; Heat ML0317605942003-06-18018 June 2003 Transmittal of Univ of Virginia Reactor Decommissioning Project Groundwater Report & Final Survey Status Addenda: Underground Waste Tank Excavation; Reactor Facility Piping; Pond Sediments; Interior Structure Surfaces; Exterior Soil & Paved ML0315002832003-05-27027 May 2003 Special Report on Notification of Personnel Changes Re Management of University of Virginia Reactor (Uvar) & Cavalier Reactor Licenses IR 05000062/20022012003-05-22022 May 2003 IR 05000062-02-201 on 06/17-19, 08/13-15& 27-28/02, for Univ of Virginia Reactor Facility. No Violations Noted ML0314203992003-05-19019 May 2003 Transmittal of University of Virginia Reactor Decommissioning Project Continuing Characterization Summaries: Reactor Plant Stack Summary, Mezzanine Crawl Space Summary, Pond Sediment Summary ML0310001952003-04-0404 April 2003 Transmittal of Evaluation of Radiological Characterization Results Relative to Termination of NRC License R-123, March 2003 ML0309905752003-04-0404 April 2003 Transmittal of Master Final Status Survey Plan, UVA-FS-002, Revision 0, March 2003 ML0208503322002-04-29029 April 2002 Change of Facility Project Manager Research and Test Reactors ML0206306602002-03-26026 March 2002 University of Virginia Cavalier Research Reactor - Amendment Material Possession Limits and Physical Security Plan ML0205800902002-03-26026 March 2002 Univ. of Virginia Research Reactor, Amendment, Decreases Limits for Possession of Special Nuclear Material & Removes Requirement to Implement & Maintain Physical Security Plan ML0204501742002-03-26026 March 2002 University of Virginia Research Reactor - Amendment Decommissioning Plan Approval ML0207107482002-03-14014 March 2002 University of Virginia Research Reactor - Termination of Reactor Operator Requalification Program ML0205207142002-03-0404 March 2002 Summary of Meeting Between Uva and NRC Staffs Regarding Decommissioning of the Uvarr ML0205702422002-02-22022 February 2002 Request to Terminate Uvar & Cavalier Research Reactor Operator Requalification Program for University of Viginia Reactor ML0201502692002-01-0707 January 2002 Information on Changes to the Incumbents in Offices in the Organizational Chart for the University of Virginia Reactors 2015-06-25
[Table view] Category:Organization Chart
MONTHYEARML0201502692002-01-0707 January 2002 Information on Changes to the Incumbents in Offices in the Organizational Chart for the University of Virginia Reactors 2002-01-07
[Table view] |
Text
UNIVERSITY OF VIRGINIA NUCLEAR REACTOR FACILITY U.S. MAIL ADDRESS STREET ADDRESS P.O. Box 400322 675 Old Reservoir Road Charlottesville, VA Charlottesville, VA 22903 22904-4322 Telephone: 434-982-5440 Fax: 434-982-5473 January 7, 2002 Mr. Alexander Adams, Jr., Senior Project Manager Events Assessment, Generic Communications and Non-Power Reactors Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11555 Rockville Pike, One White Flint North Mail Stop 012-D I Rockville, MD 20852-2738
Subject:
Information on Changes to the Incumbents in Offices in the Organizational Chart for the University of Virginia Reactors
Dear Mr. Adams,
The University of Virginia has made some changes as to the individuals occupying some of the positions in the organizational chart for both University of Virginia reactors.
Mr. Gene D. Block, formerly the Vice President for Research and Public Service, has been elevated to the position of Vice President and Provost.
Mr. R. Ariel Gomez, has been named to replace Mr. Block as Vice President for Research and Public Service (Level 1).
The company CH2M FILL has been selected as the Decommissioning Contractors (Level 4) for the decommissioning work on both UVA reactors.
Mr. David J. Hudson has been appointed to Reactor Decommissioning Committee, replacing Mr. Haydn Wadley.
Ilk" 91 ukt_ý 44 Robert U. Mulder, Director My'J r-qiCoriSs
,q0ont*pkýý Nlr'C!mber 30, 2004 University of Virginia Reactor Facility cc: Craig Bassett USNRC, Region II 61 Forsyth St., Suite 23T85 NW Atlanta, GA 30323 iVoQce
reporting lines FIGURE 6.1 "B"
--- communications lines ORGANIZATIONAL CHART UNIV. OF VIRGINIA NUCLEAR REACTOR FACILITY (AFTER SHIPMENT OF ALL FUEL ELEMENTS OFF-SITE)