ML020140063
| ML020140063 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 01/14/2002 |
| From: | Ernstes M Operator Licensing and Human Performance Branch |
| To: | Christian D Virginia Electric & Power Co (VEPCO) |
| References | |
| 50-338/2002-301, 50-339/2002-301 | |
| Download: ML020140063 (5) | |
See also: IR 05000338/2002301
Text
January 14, 2002
Virginia Electric and Power Company
ATTN: Mr. David A. Christian
Senior Vice President and
Chief Nuclear Officer
Innsbrook Technical Center
5000 Dominion Boulevard
Glen Allen, VA 23060
SUBJECT: REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS
NORTH ANNA POWER STATION - 50-338/2002-301 AND 50-339/2002-301
Dear Mr. Christian:
In a telephone conversation on September 5, 2001, between Mr. Joe Scott, Supervisor of
Nuclear Training (Operations) and Mr. Ronald F. Aiello, Senior Operations Engineer,
arrangements were made for the administration of licensing examinations at the North Anna
Power Station, Units 1 and 2 during the week of June 10, 2002.
The NRC will prepare the examinations based on the guidelines in Revision 8, Supplement 1, of
NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." Your staff will
be given the opportunity to review the examinations during the week of May 13, 2002. The
facility has agreed to fill in the scenario details (ES-D-2) and the details of the JPMs. The
facility has also agreed to make all of the copies of the examination prior to administration.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
VEPCO 2
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number 3150-0018, which expires on April 30, 2003. The
public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per
response, including the time for reviewing instructions, gathering and maintaining the data
needed, and completing and reviewing the collection of information. Send comments on any
aspect of this collection of information, including suggestions for reducing the burden, to the
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the
Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of
Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Joe Scott has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Ronald F. Aiello at (404) 562-4641,
(Internet E-mail: rfa@nrc.gov), or myself at (404) 562-4638, (Internet E-mail: mee@nrc.gov).
Sincerely,
/RA/
Michael E. Ernstes, Chief
Operator Licensing and
Human Performance Branch
Division of Reactor Safety
Docket Nos.: 50-338, 50-339
License Nos.: NPF -4, NPF - 7
cc: (See page 3)
VEPCO 3
cc contd:
Stephen P. Sarver, Director Donald P. Irwin, Esq.
Nuclear Licensing and Hunton and Williams
Operations Support Electronic Mail Distribution
Virginia Electric and Power Company
Electronic Mail Distribution Attorney General
Supreme Court Building
D. A. Heacock 900 East Main Street
Site Vice President Richmond, VA 23219
North Anna Power Station
Electronic Mail Distribution H. Ashley Royal
Manager Nuclear Training
Executive Vice President North Anna Power Station
Old Dominion Electric Cooperative P. O. Box 402
Electronic Mail Distribution Mineral, VA 23117
County Administrator
Louisa County
P. O. Box 160
Louisa, VA 23093
VEPCO 4
Distribution:
S. Mabaque, NRR
A. Boland (Part 72 Only)
RIDSNRRDIPMLIPB
PUBLIC
PUBLIC DOCUMENT (circle one): YES NO
OFFICE RII:DRS RII:DRS RII:DRP
SIGNATURE /RA/ /RA/ /RA By L Garner for/
NAME RAiello:pmd MErnstes KLandis
DATE 9/8/2001 1/10/2002 1/10/2002
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO
OFFICIAL RECORD COPY DOCUMENT NAME: C:\Program Files\Adobe\Acrobat 4.0\PDF Output\Corporate Notification
Lett~.wpd