ML012710300

From kanterella
Jump to navigation Jump to search
Final - RO & SRO Section a Operating
ML012710300
Person / Time
Site: Beaver Valley
Issue date: 08/03/2001
From: Myers L
FirstEnergy Nuclear Operating Co
To: Conte R
NRC/RGN-I/DRS/OSB
Conte R
References
-RFPFR, 50-334/01302
Download: ML012710300 (56)


Text

RTL#A5.640U 1/2-ADM-1303.F02 Page 1 of 7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE IJPM JPM NUMBER:

REVISION: 1CR-008 6a JPM TITLE: Verify Natural Circulation Flow K/A

REFERENCE:

193008 K1.21 4.2 TASKID: 0535-015-04-013 2.1.7 4.4 JPM APPLICATION: 1 REQUALIFICATION [ INITIAL EXAM [ TRAINING

[] FAULTED JPM E ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

E Perform [] Plant Site - Annual Requal Exam -- BVT F-1 Simulate H Simulator 1 Initial Exam Z NRC

-] Classroom [] OJT/TPE [- Other:

E] Training E"] Other:

EVALUATION RESULTS Performer Name: Performer SSN:

Time F-1 Yes Allotted 15 minutes Actual minutes Critical: Z No Time: Time:

El SAT SA JPM RESULTS: 1MRTUNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/S SN: Name/S SN:

Name/S SN: Name/S SN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#A5.640U 1/2-ADM-1303.F02 Page 2 of 7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER:

EWM[ lCR-008 TITLE: Verify Natural Circulation Flow I EVALUATOR DIRECTION SHEET TASK STANDARD: Monitor available Control Room indications to verify natural circulation exists.

RECOMMENDED Control Room STARTING LOCATION:

DIRECTIONS: You are to verify natural circulation flow.

INITIAL CONDITIONS: It has been greater than 15 minutes since a manual reactor trip from 100% power. The RCP's have been secured due to a leak in the CCR system. Temperature recorders [TR-1RC-413] (T Hot) and [TR-RC 410] (T Cold) are OOS. No adverse containment conditions exist.

INITIATING CUE: Your Supervisor directs you to verify the indications of natural circulation flow in accordance with EOP Attachment 2-G and report the results.

REFERENCES:

1OM-53A.1.2-G Issue IC, Rev. 0 1OM-53A. 1.6-A Issue IC, Rev. 0 TOOLS: None HANDOUT: 1OM-53A. 1.2-G 1OM-53A. 1.6-A

1/2-ADM- 1303.F02 RTL#A5.640U Page 3 of 7 Revision I OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • Read:

TASK: Verify natural circulation flow.

INITIAL CONDITIONS: It has been greater than 15 minutes since a manual reactor trip from 100% power. The RCP's have been secured due to a leak in the CCR system. Temperature recorders [TR-1RC-413] (T Hot) and [TR-RC 410] (T Cold) are OOS. No adverse containment conditions exist.

INITIATING CUE: Your Supervisor directs you to verify the indications of natural circulation flow in accordance with EOP Attachment 2-G and report the results.

- At this time, ask the evaluator any questions you have on this JPM.

EJ When satisfied that you understand the assigned task, announce "I am now beginning the JPM".


Simulate performance or perform as directed the required task.

Point to any indicator or component you verify or check and announce your observations.

ri After determining the Task has been met announce "I have completed the JPM".

Then hand this sheet to the evaluator.

RTL#A5.640U 1/2-ADM-1303.F02 Page 4 of 7 Revision I OPERATIONS JOB PERFORMANCE MEASURE WJPM JPM[ NUMBER:

REVISION: 1CR-008 6aII JPM TITLE: Verify Natural Circulation Flow I STEP STANDARD

"("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=' S/U THIM-:

  • i*l* "" A .

i*:*START Setup: Initialize IC-106. Place YCT's on TR-1RC-413 (WR T-hot) and TR-1RC-410 (WR T-cold).

SIMULATION CUES are not required for PERFORM JPM's.

1. Candidate obtains procedure. 1.1 Candidate locates EOP Attachment 2-G.

EVALUATOR CUE: Provide Candidate a copy of EOP Attachments 2-G and 6-A.

COMMENTS:

2. Obtain RCS degree of subcooling based 2.1 Candidate determines RCS degree of subcooling based on core on core exit TC's. exit TC's.

EVALUATOR NOTE: Candidate may use ICCM or calculate the value by using the Steam Tables to find the saturation temperature for the PZR pressure and subtracting from the core exit TC temperature.

SIMULATED CUE: If Candidate calculates subcooling, then provide these CUES: PRZR pressure indicates 2200 psig (2215 psia); core exit T/C temperature indicates 585'F (for 2215 psia, Tsat = 650'F).

SIMULATED CUE: If Candidate uses ICCM, then CUE: 45°F subcooled based on core exit TC's.

COMMENTS:

RTL#A5.640U 1/2-ADM-1303.F02 Page 5 of 7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-008 JPM TITLE: Verify Natural Circulation Flow JPM REVISION: 6a STEP STANDARD

( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/IU

3. Compare degree of subcooling with the 3.1. Candidate obtains correct value from the table in Attachment 6-A value given in Attachment 6-A. and indicates that the degree of subcooling from Step 2 is greater than the value in the table.

COMMENTS:

4. Check that SG pressures are stable or 4.1. Candidate locates SG pressure recorder or indicators on VB-A to dropping. perform trend report on SG pressure.

SIMULATED CUE: SG trend shows SG pressure is stable at 920 psig.

COMMENTS:

5. Check that RCS Tavg OR hot leg 5.1. Candidate locates RCS wide range temperature indication OR temperatures are stable or dropping. RCS Tavg to perform trend report on RCS temperature.

SIMULATED CUE: Hot leg temperature trend shows temperature is stable at 582'F and/or Tavg is stable at 5600F.

COMMENTS:

RTL#A5.640U 1/2-ADM-1303.F02 Page 6 of 7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE I M NUMBER: 1CR-008 WPM REVISION: 6a JPM TITLE: Verify Natural Circulation Flow STEP STANDARD

( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/IU

6. Check that core exit TC's are stable or 6.1. Candidate performs trend analysis on core exit TC's using ICCM.

dropping. ISIMULATED CUE: Core exit TC's are stable at 585'F.

COMMENTS:

7. From Steam Tables, determine 7.1. Candidate obtains SG pressure from control board indicators.

saturation temperature for SG pressure.

7.2 Determines saturation temperature from Steam Tables (approximately 539 0F).

SIMULATED CUE: SG pressure is 940 psig (955 psia).

COMMENTS:

8. Compare saturation temperature value 8.1 Candidate locates RCS cold leg temperature on computer.

to RCS cold leg temperature.

SIMULATED CUE: Cold leg temperature is 540'F.

COMMENTS:

RTL#A5.640U 1/2-ADM- 1303 .F02 Page 7 of 7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-008 JPM TITLE: Verify Natural Circulation Flow 1PM[ REVISION: 6a II STEP STANDARD

("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)* S/U 9.C Verifies natural circulation flow is 9. 1.C Candidate reports natural circulation flow exists.

established. EVALUATOR CUE: If the Candidate does not verbalize, ask if natural circulation flow exists.

COMMENTS:

STOP TIME: _______________

1/2-ADM-1303.F02 RTL#A5.640U Page I of 8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM REVISION: 7 JPM NUMBER: 1CR-002 a

JPM TITLE: Perform an Estimated Critical Position Calculation I K/A

REFERENCE:

192008K1.07 3.6 TASKID: 0011-003-01-013 2.1.23 4.0 JPM APPLICATION: Z REQUALIFICATION Z INITIAL EXAM [-] TRAINING

[] FAULTED JPM Z ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

Z Perform [:] Plant Site [] Annual Requal Exam [R BVT R Simulate Z Simulator Z Initial Exam Z NRC

[-- Classroom j-- OJT/TPE - Other:

-] Training

_[] Other:

EVALUATION RESULTS Performer Name: Performer SSN:

Time F-- Yes Allotted 25 minutes Actual minutes Critical: Z No Time: Time:

E SAT SA JPM RESULTS:

E 1L UNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/S SN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#A5.640U 1/2-ADM- 1303.F02 Page 2 of 8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation JPM REVISION: 7 1 EVALUATOR DIRECTION SHEET TASK STANDARD: DATA SHEET 1 (FORM ECP-1) Parts A through E completed correctly.

RECOMMENDED Control Room STARTING LOCATION:

DIRECTIONS: You are to simulate (perform) the task of calculating an Estimated Critical Position (ECP).

INITIAL CONDITIONS: 0 The plant computer is NOT available.

0 Plant start-up following a reactor trip.

6 Specific parameters for power history, core age, time since reactor trip, estimated time to criticality, RCS boron concentration and Tavg are provided on the accompanying data sheet.

INITIATING CUE: Your Supervisor directs you to perform an ECP calculation and determine the critical boron concentration with an estimate of criticality occurring with Control Bank 'D' at 100 steps.

REFERENCES:

1OM-50.4.F, Rev. 1 BV-I Curve Book TOOLS: Calculator HANDOUT: S 1OM-50.4.F with Critical Data recorded in DATA SHEET 1.

S ECP INITIAL CONDITIONS Data Sheet 0 BV-1 Curve Book

RTL#A5.640U 1/2-ADM-1303.F02 Page 3 of 8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • Read:

TASK: Perform an ECP calculation.

INITIAL CONDITIONS: S The plant computer is NOT available.

S Plant start-up following a reactor trip.

0 Specific parameters for power history, core age, time since reactor trip, estimated time to criticality, RCS boron concentration and Tavg are provided on the accompanying data sheet.

INITIATING CUE: Your Supervisor directs you to perform an ECP calculation and determine the critical boron concentration with an estimate of criticality occurring with Control Bank 'D' at 100 steps.

H* At this time, ask the evaluator any questions you have on this JPM.

F1 When satisfied that you understand the assigned task, announce "I am now beginning the JPM".

D Simulate performance or perform as directed the required task.

Point to any indicator or component you verify or check and announce your observations.

r After determining the Task has been met announce "I have completed the JPM".

Then hand this sheet to the evaluator.

RTL#A5.640U 1/2-ADM-1303.F02 Page 4 of 8 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation JPM REVISION: 6b I STEP STANDARD

("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)_ S/U

.... K*,**.*.

.. 0 START TIME:

EVALUATOR NOTE: This JPM is designed to be used with an accompanying Data Sheet. Ensure the Candidate is provided with the Data Sheet to perform the calculation EVALUATOR NOTE: This step is optional.

Evaluator may elect to provide procedure.

1. Obtain procedure. 1. Candidate locates procedure 1OM-50.4.F.

EVALUATOR NOTE: After Candidate locates the procedure, provide a copy of FORM ECP-1 with the following data entered:

"* Column I, PRIOR TO SHUTDOWN:

0 Boron Concentration SPower

> Control Rod Position

"* Column II, EXPECTED AT CRITICALITY:

- Control Rod Position COMMENTS:

EVALUATOR NOTE: This step is optional.

Evaluator may elect to provide BV-I Curve Book.

2. Obtain BV-I Curve Book. 2. Candidate obtains BV-I Curve Book.

COMMENTS:

RTL#A5.640U 1/2-ADM-1303.F02 Page 5 of 8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation JPM REVISION: 6b In STEP STANDARD

( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/

3. Record (review) the information in Part 3.1 Candidate reviews data in Column I, PRIOR TO SHUTDOWN:

A, Critical Data. > Boron Concentration

> Power

> Control Rod Position 3.2 Candidate reviews data in Column II, EXPECTED AT CRITICALITY:

> Control Rod Position COMMENTS:

4. Complete Part A, Critical Data, Column 4.1 Candidate refers to Figure CB-12 to estimate Xenon percent.

I, PRIOR TO SHUTDOWN.

4.2 Candidate refers to Figure CB-22 to estimate Samarium percent.

COMMENTS:

5. Complete Part A, Critical Data, Column 5.1 Candidate refers to Figure CB-23 to estimate Xenon percent.

II, EXPECTED AT CRITICALITY.

5.2 Candidate refers to Figure CB-22 to estimate Samarium percent.

COMMENTS:

6. Determine Part B. 1, Power Reactivity 6.1 Candidate refers to Figure CB-21 to estimate the power reactivity Defect. defect and enters value in Part B, Column I, Line 1.

COMMENTS:

RTL#A5.640U 1/2-ADM-1303.F02 Page 6 of 8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: lCR-002 JPM TITLE: Perform an Estimated Critical Position Calculation I

I PM REVISION: 6bII STEP STANDARD

("C" Denotes CRITICAL STEP) (Indicate "S"FOR SAT or "U"FOR UNSAT)=' S/U

7. Determine Part B.2, Control Rod 7.1 Candidate refers to Figure CB-24C to estimate integral rod worth Reactivity Defect. prior to shutdown.

7.2 Candidate refers to Figure CB-24C to estimate integral rod worth expected at criticality.

COMMENTS:

8. Determine Part B.3, Xenon Reactivity 8.1 Candidate refers to Figure CB-23 to estimate Xenon worth prior Defect. to shutdown.

8.2 Candidate refers to Figure CB-23 to estimate Xenon worth expected at criticality.

COMMENTS:

9. Determine Part B.4, Samarium 9.1 Candidate refers to Figure CB-22 to estimate Samarium worth Reactivity Defect. prior to shutdown.

9.2 Candidate refers to Figure CB-22 to estimate Samarium worth expected at criticality.

COMMENTS:

10. Calculate Part B.5, Reactivity Change. 10.1 For each Part B defect, Candidate subtracts Column I from Column II and enters the value in Column III.

10.2 Candidate sums all Part B, Column III values and enters the value in Part B, Line 5.

10.3 Candidate enters value in Part C, Column I, Line 1.

COMMENTS:

RTL#A5.640U 1/2-ADM-1303.F02 Page 7 of 8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation STEP STANDARD

( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U 11.C Calculate Part C, Critical Boron 11.1 Candidate refers to Figure CB-20 to estimate differential boron Concentration. worth for the Part A, Column I boron concentration and enters the value in Part C, Column II, Line 1.

11.2 Candidate calculates boron change by dividing Part C, Column I, Line 1 by Part C, Column II, Line I and enters the value in Part C, Column III, Line 1.

11.3 Candidate enters the boron concentration from Part A, Column I in Part C, Column IV, Line 1.

11.4 Candidate adds the boron change from Part C, Column III, Line 1 to Part C, Column IV, Line 1 and enters the value in Part C, Column V, Line 1.

11.5 Candidate refers to Figure CB-20 to estimate differential boron worth for the boron concentration from Part C, Column V, Line I and enters the value in Part C, Column II, Line 2.

11.6 Candidate calculates boron change by dividing Part C, Column I, Line 1 by Part C, Column II, Line 2 and enters the value in Part C, Column III, Line 2.

11.7 Candidate enters the boron concentration from Part A, Column I in Part C, Column IV, Line 2.

11.8.C Candidate adds Part C, Column III, Line 2 to Part C, Column IV, Line 2 and enters the value in Part C, Column V, Line 2.

EVALUATOR NOTE: This step is SAT if the method of calculation is correct and the boron concentration for startup is within the tolerance band listed on the ECP CALCULATION SHEET.

COMMENTS:

STOP TIME:

I?age 8 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation IPM REVISION: 6b II

  • THIS SHEET TO BE GIVEN TO CANDIDATE*

ECP INITIAL CONDITIONS Hours since the plant tripped: 10 Hours to expected criticality: 2 Power history prior to the reactor trip: 100% for 1 month Core age: EOL (16,300 MWD/MTU)

Tavg: 547 0 F Initial RCS boron concentration: 100 ppm

JPM 1CR-.j2, Rev. 7 ECP CALCULATION SHEET Unit 1 Cycle 14 Data Rods Core AGE EQ XE EQ SAM Boron Power Ix 100 100% 100% 100% 230 Prior to Shutdown:

0% 135% 106%/6 100 EOL 2860 646 Expected at Criticality:

CORE AGE = EOL B. Reactivity Balance Column: I II 111(11-1)

Prior S/D Exp at Crit Difference 1950 0 -1950 0 1380 1380

3. Xenon 2860.0 3861.0 1001.0
4. Samarium 646.0 684.8 38.8
5. Reactivity Change 469.8 C. Critical Boron Concentration Column: I II III IV V Rx Chng B Chge B @ S/D B @ S/U 1 469.8 -9.00 -52.2 100 47.8 2 -9.25 -50.8 100 49.2

1/2-ADM- 1303.F02 RTL#A5.640U Page 1 of 5 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1LOT4 - New (SRO) JPM TITLE: Review a Clearance Tagout JPM REVISION: 0 K/A

REFERENCE:

2.2.13 3.8 TASK ID: 0481-020-03-013 JPM APPLICATION: --] REQUALIFICATION E INITIAL EXAM --] TRAINING

[-] FAULTED 1PM Z ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

[* Perform E] Plant Site F] Annual Requal Exam - BVT F-D Simulate -- Simulator Z Initial Exam Z NRC Z Classroom -] OJT/TPE -- Other:

FI] Training

_[-] Other:

EVALUATION RESULTS Performer Name: Performer SSN:

Time F-- Yes Allotted 20 minutes Actual minutes Critical: Z No Time: Time:

[ZlSATSA JPM RESULTS: UNSAT (Comments required for UNSAT evaluation)

ME-Comments:

OBSERVERS Name/S SN: Name/S SN:

Name/SSN: Name/S SN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#A5.640U 1/2-ADM- 1303.F02 Page 2 of 5 Revision I OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1LOT4 - New (SRO) JPM TITLE: Review a Clearance Tagout JPM REVISION: 0 I EVALUATOR DIRECTION SHEET TASK STANDARD: Review a clearance tagout.

RECOMMENDED Control Room STARTING LOCATION:

DIRECTIONS: You are to simulate (perform) the task of reviewing a tagout section.

INITIAL CONDITIONS: The plant is operating at 100% power with all systems in their normal operating alignment. A tagout section has been prepared to isolate and drain [1QS-P-2A], RWST Recirculation Pump.

INITIATING CUE: The NSS requests you to complete the tagout section review and report your results.

REFERENCES:

NPDAP-3.4, Rev. 14 1OM-37.5.B.7, Rev. 18 OP Manual Fig. No. 13-1, Rev. 11 TOOLS: None HANDOUT: NPDAP-3.4, Rev. 14 Copy of OP Manual Fig. No. 13-1 1OM-37.5.B.7

RTL#A5.640U 1/2-ADM- 1303.F02 Page 3 of 5 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • F1 Read:

TASK: Review a clearance tagout.

INITIAL CONDITIONS: The plant is operating at 100% power with all systems in their normal operating alignment. A clearance tagout has been prepared to isolate and drain [1QS-P-2A], RWST Recirculation Pump.

INITIATING CUE: The NSS requests you to complete the tagout section review and report your results.

[J At this time, ask the evaluator any questions you have on this JPM.

El When satisfied that you understand the assigned task, announce "I am now beginning the JPM".

Simulate performance or perform as directed the required task.

Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce "I have completed the JPM".

El~ Then hand this sheet to the evaluator.

RTL#A5.640U 1/2-ADM-1303.F02 Page 4 of 5 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2LOT3 - New (SRO) JPM TITLE: Review a Clearance Tagout JPM REVISION: 0 STEP STANDARD

("C" Denotes CRITICAL STEP) (Indicate "S"FOR SAT or "U"FOR UNSAT)* S/U START TIME: _______

EVALUATOR NOTE: This task is normally performed using the NOMS clearance computer and signed electronically. For the purpose of this JPM, inform the Candidate to report the results of the tagout review in place of signing the tagout form.

EVALUATOR NOTE: This step is optional and may not be performed by Candidate. Mark step N/A if not performed. After locating procedure, provide Candidate a copy of NPDAP 3.4.

1. Obtains procedure. 1. Candidate locates procedure NPDAP-3.4.

COMMENTS:

1/2-ADM-1303.F02 RTL#A5.640U Page 5 of 5 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2LOT3 - New (SRO) JPM TITLE: Review a Clearance Tagout JPM REVISION: 0 STEP STANDARD

("C" Denotes CRITICAL STEP ) (Indicate "S" FOR SAT or "U" FOR UNSAT)z S/U EVALUATOR NOTE: Provide JPM handout with a copy of tagout forms and OP Manual Fig. No. 13-1.

2.C. Review tagout points for adequacy Candidate verifies appropriate clearance points are selected.

and report results.

2.2.C Candidate identifies the following tagout errors:

2.2.1 'Prepared By' and 'Reviewed By' signatures are missing on the Tagout Cover Sheet.

2.2.2 Valve 1QS-17 is NOT correct as an isolation point. The correct valve is IQS-16 (reference OP Manual Fig. No. 13-1).

2.2.3 Valve 1QS-18 is a check valve and NOT an isolation point.

(reference OP Manual Fig. No. 13-1).

2.3. Reports that the tagout is NOT correct as written.

COMMENTS:

1-STOP TIME:

lW09-13 -QS -004 06/2212001 08:43 Beaver Valley Power Sta. 1BVP-01-1 Page 1 of I Equipment ID:

1QS-P-2A

Description:

MECH 01-019196-000 PUMP OVERHAUL Reason:

1LOT4 NRC Exam Admin. Topic JPM (SRO)

OP Manual Fig. No. 13-1 Hazards:

Work Required prior to Completion:

FILL AND VENT ON PICK UP Attribute Attribute Description Value Equipment Required For Mode Change NO Restored/Removed Prior to Mode N/A ESF Clearance Required NO Tagout Type ON-OUTAGE Clearance Type RED DANGER Status Description User Verification Date Prepared Prepared By 00/0010000 00:00 Reviewed Reviewed By 00/0010000 00:00 Second Reviewed Second Reviewed By 00/00/0000 00:00 Approved Approved By 00/00/0000 00:00 Issued for Work Issued for Work By 00/00/0000 00:00 Restoration Review Restoration Review By 00/00/0000 00:00 removal Authorized Removal Authorized By 00/00/0000 00:00 1Clearance Closed learance Closed By 00/00/0000 00:00

Tag List for '09-13 -QS -004 06/2" "'001 08:43 Beaver Valley PowerSta. 1BVP-01-1

,Page 1 of 1 Equipment ID Equipment Equipment Tag Tag Place. Place. Rest. Rest. Notes Description Location Serial Type Config. Seq. Config. Seq.

1S1032 KNIFE SWITCH FOR ANNUNCIATOR 1-SRVB-713--1-SRVB-713-P--BAY 3-- Caution OPEN 1 CLOSED 8 WINDOW A6-28 i1QS- P-2A-CS RWST RECIRC PUMP 2A CONTROL 1-SRVB-735-CONTROL ROOM -B Caution OFF 2 OFF 7 SWITCH BOARD SECTION B cCC- 1-17-G CIRCUIT BREAKER FOR QS-P-2ALS AND 1-SFGB-756-MOTOR CONTROL CE- Danger RACKED OUT 3 RACKED IN AND 6 DOOR TAGGED ON

, QS-P-2AHS 1QS- 18 REFUEL RECIRC PP 2A DISCH CHECK 1 -SFGB-735--AT PUMP Danger SHUT 4 SHUT 5 1QS-17 REFUEL RECIRC PP 2B SUCT ISOL 1 -SFGB-735--AT PUMP Danger SHUT 5 OPEN 4 rlQS- 82 (PI-1QS-105A) ROOT ISOL 1-SFGB-735--AT RWST RECIRC PP Danger OPEN 6 OPEN 3 S1QS 3 PI-1 QS-105A INSTRUMENT DRAIN 1 -SFG-735-UUN;H S-R -A Danger I VALVE RWST RECIRC PP 11QS 84 (1QS-P-2A) SUCT TEST CONN 1-SFGB-735--AT RWST RECIRC PP Danger OPHEN 8 SHUTI 1 1

I___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ I__ _ _ I _ _ _ _ _ _ I__ _ _

QUESTION: A.3.1 A clearance is scheduled for posting on the cesium removal ion exchangers to replace the depleted resin. You are to enter the East Trench area to post the clearance tags. Your current annual whole body exposure is 4.5 REM Total Effective Dose Exposure (TEDE). The general area dose rate in the East Trench area is 1000 mR/hr. How long can you remain in the East Trench area without exceeding the 10CFR20 Whole Body TEDE Occupational Dose Limit?

ANSWER:

30 minutes

[10CFR20 Whole Body TEDE Occupational Dose Limit is 5 REM.

5R - 4.5R = 0.5R 0.5R @ 1R/hr. = 0.5 hr. (30 minutes)]

[ ] bracketed information is not required for full credit.

Technical

Reference:

10CFR20; 1/2-ADM-1601, Rev. 1 Learning Objective: LP-08-01-801, ELO 25 K/A: 2.3.1 Importance Rating: 3.0 Comments:

I LOT4 2/23/01 After Validation

SRO ONLY QUESTION: A.3.2 NOTE: This is a closed reference question.

For the clearance posted on the cesium removal ion exchangers in the East Trench area with a general area dose rate of 1000 mR/hr:

a. What specific type of Radiation Barrier Key will be needed for this entry?
b. What are the NSS responsibilities regarding the issuance of this key?

ANSWER:

a. RB1XKey
b. 1. Administrative control of the keys.
2. Ensuring that individuals being issued keys are on the Meter Qualification List or are qualified operators.

Technical

References:

1/20M-48.3.1 Issue 3, Rev. 9 Learning Objective: LP-3SQS-2389, ELO 19 K/A: 2.3.2 Importance Rating: 2.9 Comments:

ILOT4 2/23/01 After Validation

RTL#A5.640U 1/2-ADM- 1303.F02 Page 1 of 5 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE IPM NUMBER: 1CR-112 1PM[ REVISION: Ila JPM TITLE: Classify an EPP Event K/A

REFERENCE:

2.4.41 4.1 TASK ID: 1350-004-03-023 JPM APPLICATION: [ REQUALIFICATION ] INITIAL EXAM -- TRAINING

- FAULTED JPM [ ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

E Perform -] Plant Site [] Annual Requal Exam E] BVT

--] Simulate [ Simulator M Initial Exam ] NRC

-- Classroom E] OJT/TPE j-- Other:

[] Training E]_ Other:

EVALUATION RESULTS Performer Name: Performer SSN:

Time [E Yes Allotted 15 ninutes Actual minutes Critical: [-] No Time: Time:

1L]SAT E A JPM RESULTS: 1 R TUNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/S SN: Name/S SN:

Name/S SN: Name/S SN:

EVALUATOR Evaluator (Print): Date.

Evaluator Signature:

1/2-ADM-1303.F02 RTL#A5.640U Page 2 of 5 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-112 WPM TITLE: Classify an EPP Event I EVALUATOR DIRECTION SHEET TASK STANDARD: Proper EPP classification is made within 15 minutes and the Initial Notification Form is properly completed with the required information.

RECOMMENDED Control Room STARTING LOCATION:

DIRECTIONS: You are to properly classify an Emergency Plan event.

INITIAL CONDITIONS: The simulator scenario just completed.

INITIATING CUE: Using the Emergency Preparedness Plan, determine the emergency classification of this event and complete the Initial Notification Form.

REFERENCES:

EPP/1-1a, Rev. 8 TOOLS: None HANDOUT: EPP/IP 1.1 Attachment 1, Initial Notification Form

RTL#A5.640U 1/2-ADM-1303.F02 Page 3 of 5 Revision I OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • Read:

TASK: Properly classify an Emergency Plan event.

INITIAL CONDITIONS: The simulator scenario just completed.

INITIATING CUE: Using the Emergency Preparedness Plan, determine the emergency classification of this event and complete the EPP Initial Notification Form.

Li At this time, ask the evaluator any questions you have on this JPM.

LI When satisfied that you understand the assigned task, announce "I am now beginning the JPM".

j--- Simulate performance or perform as directed the required task.

Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce "I have completed the JPM".

Then hand this sheet to the evaluator.

RTL#A5.640U 1/2-ADM-1303.F02 Page 4 of 5 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-112 JPM TITLE: Classify an EPP Event I STEP STANDARD (C"" Denotes CRITICAL STEP) (Indicate "S"FOR SAT or "U"FOR UNSAT)=> S/U

..g-i  :, .'.,*. ,START TIME:

EVALUATOR NOTE: The Candidate is being evaluated on classifying the event immediately after having participated in the simulator scenario.

Therefore, the initial conditions on the Candidate Direction Sheet do not reiterate the entire sequence of events of the scenario.

EVALUATOR CUE: From the events of the scenario just completed, classify the event in accordance with the Emergency PlaEc.This JPM is time critical, you have 15 minutes beginning now.

1. Candidate obtains procedure. 1.1 Candidate locates EPP/1-da.

COMMENTS:

2.C Classify the event in accordance with 2.1.C Candidate properly classifies event.

the Emergency Plan. EVALUATOR NOTE: The proper level of classification is noted at the end of each scenario guide.,

COMMvENTS:

1/2-ADM- 1303.F02 RTL#A5.640U Page 5 of 5 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-112 JPM TITLE: Classify an EPP Event I STEP STANDARD

"("C" Denotes CRITICAL STEP) (Indicate "S"FOR SAT or "U" FOR UNSAT)=z S/U EVALUATOR CUE: After Candidate determines classification, provide handout of Initial Notification Form.

3.C Complete the EPP Initial 3.1 .C Candidate properly completes EPP Initial Notification Form.

Notification Form.

EVALUATOR NOTE: Refer to key copy of EPP Initial Notification Form for information to be completed.

COMMENTS:

STOP TIME:

RTL#A5.640U 1/2-ADM- 1303.F02 Page 1 of 7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-008 [ JPM TITLE: Verify Natural Circulation Flow I K/A

REFERENCE:

193008K1.21 3.9 TASK ID: 0535-015-04-013 2.1.7 3.7 JPM APPLICATION: [ REQUALIFICATION [ INITIAL EXAM [ TRAINING

[-D FAULTED JPM Z ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

Z Perform -] Plant Site [] Annual Requal Exam E] BVT

-- Simulate M Simulator [ Initial Exam N NRC E] Classroom E] OJT/TPE E] Other:

E] Training

--]DOther:

EVALUATION RESULTS Performer Name: Performer SSN:

Time L-] Yes Allotted 15 minutes Actual minutes Critical: Z No Time: Time:

L1 SATSA JPM RESULTS: MRT UNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/S SN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#A5.640U 1/2-ADM-1303.F02 Page 2 of 7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER:

JPM[ REVISION: 1CR-008 6a, JPM TITLE: Verify Natural Circulation Flow I EVALUATOR DIRECTION SHEET TASK STANDARD: Monitor available Control Room indications to verify natural circulation exists.

RECOMMENDED Control Room STARTING LOCATION:

DIRECTIONS: You are to verify natural circulation flow.

INITIAL CONDITIONS: It has been greater than 15 minutes since a manual reactor trip from 100% power. The RCP's have been secured due to a leak in the CCR system. Temperature recorders [TR-1RC-413] (T Hot) and [TR-RC 410] (T Cold) are OOS. No adverse containment conditions exist.

INITIATING CUE: Your Supervisor directs you to verify the indications of natural circulation flow in accordance with EOP Attachment 2-G and report the results.

REFERENCES:

1OM-53A.1.2-G Issue IC, Rev. 0 1OM-53A.1.6-A Issue IC, Rev. 0 TOOLS: None HANDOUT: 1OM-53A.1.2-G IOM-53A.1.6-A

RTL#A5.640U 1/2-ADM-1303.F02 Page 3 of 7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • Read:

TASK: Verify natural circulation flow.

INITIAL CONDITIONS: It has been greater than 15 minutes since a manual reactor trip from 100% power. The RCP's have been secured due to a leak in the CCR system. Temperature recorders [TR- 1RC-413] (T Hot) and [TR-RC 410] (T Cold) are OOS. No adverse containment conditions exist.

INITIATING CUE: Your Supervisor directs you to verify the indications of natural circulation flow in accordance with EOP Attachment 2-G and report the results.

E-- At this time, ask the evaluator any questions you have on this JPM.

M When satisfied that you understand the assigned task, announce "I am now beginning the JPM".

j- Simulate performance or perform as directed the required task.

Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce "I have completed the JPM".

Then hand this sheet to the evaluator.

RTL#A5.640U I/2-ADM-1303.F02 Page 4 of 7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM JPM NUMBER:

REVISION: 16a CR-008 JPM TITLE: Verify Natural Circulation Flow STEP STANDARD S/"

("C" Denotes CRITICAL STEP) (Indicate "" FOR SAT or "U" FOR UNSAT) SU

@

  • START TIME: _____....____

Setup: Initialize IC-106. Place YCT's on TR-1RC-413 (WR T-hot) and TR-1RC-410 (WR T-cold).

SIMULATION CUES are not required for PERFORM JPM's.

1. Candidate obtains procedure. 1.1 Candidate locates EOP Attachment 2-G.

EVALUATOR CUE: Provide Candidate a copy of EOP Attachments 2-G and 6-A.

COMMENTS:

2. Obtain RCS degree of subcooling based 2.1 Candidate determines RCS degree of subcooling based on core on core exit TC's. exit TC's.

EVALUATOR NOTE: Candidate may use ICCM or calculate the value by using the Steam Tables to find the saturation temperature for the PZR pressure and subtracting from the core exit TC temperature.

SIMULATED CUE: If Candidate calculates subcooling, then provide these CUES: PRZR pressure indicates 2200 psig (2215 psia); core exit T/C temperature indicates 585'F (for 2215 psia, Tsat = 650'F).

SIMULATED CUE: If Candidate uses ICCM, then CUE: 45°F subcooled based on core exit TC's.

COMMENTS:

RTL#A5.640U 1/2-ADM-1303.F02 Page 5 of 7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM TITLE: Verify Natural Circulation Flow JPM NUMBER: 1CR-008 JPM REVISION: 6a I

STANDARD ]

STEP

( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)* S/U

3. Compare degree of subcooling with the 3.1. Candidate obtains correct value from the table in Attachment 6-A value given in Attachment 6-A. and indicates that the degree of subcooling from Step 2 is greater than the value in the table.

COMMENTS:

4. Check that SG pressures are stable or 4.1. Candidate locates SG pressure recorder or indicators on VB-A to dropping. perform trend report on SG pressure.

SIMULATED CUE: SG trend shows SG pressure is stable at 920 psig.

COMMENTS:

5. Check that RCS Tavg OR hot leg 5.1. Candidate locates RCS wide range temperature indication' OR temperatures are stable or dropping. RCS Tavg to perform trend report on RCS temperature.

SIMULATED CUE: Hot leg temperature trend shows temperature is stable at 582°F and/or Tavg is stable at 560 0 F.

COMMENTS:

RTL#A5.640U 1/2-ADM- 1303 .F02 Page 6 of 7 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-008 IJPM TITLE: Verify Natural Circulation Flow 1PM RE V ISIO N :

6a - - T TA D R STEP STANDARD

("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)> S/U

6. Check that core exit TC's are stable or 6.1. Candidate performs trend analysis on core exit TC's using ICCM.

dropping. SIMULATED CUE: Core exit TC's are stable at 585 0F.

COMMENTS:

7. From Steam Tables, determine 7.1. Candidate obtains SG pressure from control board indicators.

saturation temperature for SG pressure.

7.2 Determines saturation temperature from Steam Tables (approximately 539°F).

SIMULATED CUE: SG pressure is 940 psig (955 psia).

COMMENTS:

8. Compare saturation temperature value 8.1 Candidate locates RCS cold leg temperature on computer.

to RCS cold leg temperature.

SIMULATED CUE: Cold leg temperature is 5401F.

COMMENTS:

RTL#A5.640U 1/2-ADM-1303.F02 Page 7 of 7 Revision I OPERATIONS JOB PERFORMANCE MEASURE FM NUMBER: 1CR-008 JPM TITLE: Verify Natural Circulation Flow I STEP STANDARD

( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=' S/U 9.C Verifies natural circulation flow is established.

19.1.C Candidate reports natural circulation flow exists.

EVALUATOR CUE: If the Candidate does not T

verbalize, ask if natural circulation flow exists.

COMMENTS:

STOP TIME:

RTL#A5.640U 1/2-ADM-1303.F02 Page 1 of 8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: I1CR-003 JPM REVISION: 8b JPM TITLE: Perform a Quadrant Power Tilt Ratio Calculation I K/A

REFERENCE:

015 A1.04 3.5 TASK ID: 0021-005-06-013 015 A4.02 3.9 JPM APPLICATION: E REQUALIFICATION [ INITIAL EXAM [- TRAINING

[] FAULTED JPM [ ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

1 Perform [] Plant Site - Annual Requal Exam E] BVT

- Simulate M Simulator [ Initial Exam Z NRC Z Classroom [ OJT/TPE E] Other:

- Training

_--] Other:

EVALUATION RESULTS Performer Name: Performer SSN:

Time Yes Allotted 20 minutes Actual minutes Critical: [ No Time: Time:

[] SAT PM RESULTS.: UNSAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/SSN:

Name/SSN: Name/SSN:

EVALUATOR Evaluator (Print): Date.

Evaluator Signature:

RTL#A5.640U 1/2-ADM-1303.F02 Page 2 of 8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE I JPM NUMBER: ICR-003 PM REVISION: 8b 1PM TITLE: Perform a Quadrant Power Tilt Ratio Calculation I

EVALUATOR DIRECTION SHEET TASK STANDARD: The QPTR calculation is completed and compared to Technical Specification limits as specified in the OST Acceptance Criteria.

RECOMMENDED Control Room STARTING LOCATION:

DIRECTIONS: You are to simulate (perform) the task of calculating a manual Quadrant Power Tilt Ratio (QPTR).

INITIAL CONDITIONS: Mode 1, 100% power. The plant computers are unavailable.

INITIATING CUE: Your Supervisor directs you to perform a manual QPTR calculation and report the results.

REFERENCES:

1OST-2.4A Issue 4, Rev. 2 TOOLS: Calculator HANDOUT: 1OST-2.4A Power Range Detector Current Pictures (for classroom performance)

1/2-ADM-1303F02 RTL#A5.640U Page 3 of 8 Revision I OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET THIS SHEET TO BE GIVEN TO CANDIDATE E1 Read:

TASK: Manually calculate a Quadrant Power Tilt Ratio (QPTR).

INITIAL CONDITIONS: Mode 1, 100% power. The plant computers are unavailable.

INITIATING CUE: Your Supervisor directs you to perform a manual QPTR calculation and report the results.

i] At this time, ask the evaluator any questions you have on this 1PM.

the JPM".

-1 When satisfied that you understand the assigned task, announce "Iam now beginning E Simulate performance or perform as directed the required task.

Point to any indicator or component you verify or check and announce your observations.

'i After determining the Task has been met announce "I have completed the JPM".

Then hand this sheet to the evaluator.

RTL#A5.640U 1/2-ADM- 1303 .F02 Page 4 of 8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-003 JPM TITLE: Perform a Quadrant Power Tilt Ratio Calculation JPM REVISION: 8b STEP STANDARD

("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U"FOR UNSAT)* S/U

\',," *

  • START TIME: _________

EVALUATOR NOTE: This JPM is designed to use an accompanying Data Sheet 1 Key. For any of the data CUES, refer to the Data Sheet 1 Key.

SIMULATED CUES are not required for PERFORM JIPM's.

EVALUATOR NOTE: This step is optional.

Evaluator may elect to provide procedure.

1. Obtain procedure. 1. Candidate locates 1OST-2.4A.

EVALUATOR CUE: After Candidate locates the procedure, provide a copy of IOST-2.4A completed through step VI.D.2.

SIMULATED CUE: After Candidate locates the procedure, provide a copy of 1OST-2.4A completed through step VI.D.2 and Data Sheet I with current values.

COMMENTS:

1/2-ADM-1303.F02 RTL#A5.640U Page 5 of 8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: lCR-003 JPM TITLE: Perform a Quadrant Power Tilt Ratio Calculation JPM REVISION: 8b STEP STANDARD

("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)* S/U EVALUATOR NOTE: This step is optional. Evaluator may elect to provide normalization factors.

2. Obtain power range detector QPTR 2. Candidate indicates normalization factors are obtained from the normalization factors. Reactor Engineering Data Book (NSS office).

EVALUATOR CUE: After Candidate requests data, or attempts to locate the data, provide the normalization factors.

COMMENTS:

3. Record power range detector current 3. Candidate locates and records detector currents for each of the values. power range detectors in Data Sheet 1, "Current (Uncor.)"

column.

SIMULATED CUE: If actual indications are not being used the "Current (Uncor.)" values are listed on the provided Data Sheet 1.

EVALUATOR CUE: If asked, inform the Candidate that no uncertainty exists and the use of a DVM is not required.

COMMENTS:

4. Determine detector corrected current 4. Candidate determines Upper Detector corrected currents and indication, records the results in Data Sheet 1, "Current (Cor.)" column.

COMMENTS:

1/2-ADM-1303.F02 RTL#A5.640U Page 6 of 8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE NUMBER: 18ba JPM REVISION: CR-003 JPM TITLE: Perform a Quadrant Power Tilt Ratio Calculation I STEP STANDARD

("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT): S/U

5. Candidate determines detector average 5.1. Candidate sums the Upper Detector corrected currents and current and tilt ratio for each of the records the results in Data Sheet 1, "SUM" space.

upper detectors.

5.2. Candidate divides the Upper Detector "SUM" value by 4 and records the results in Data Sheet 1, "AVG" space.

5.3. Candidate determines the Tilt Ratio for each Upper Detector and records the results in Data Sheet 1, Upper Detector "Tilt Ratio" column.

COMMENTS:

6. Candidate determines detector average 6.1. Candidate sums the Lower Detector corrected currents and N

current and tilt ratio for each of the records the results in Data Sheet 1, "SUM" space.

lower detectors.

6.2. Candidate divides the Lower Detector "SUM" value by 4 and records the results in Data Sheet 1, "AVG" space.

6.3. Candidate determines the Tilt Ratio for each Lower Detector and records the result in Data Sheet 1, Lower Detector "Tilt Ratio" column.

COMMENTS:

7. Candidate determines if uncertainty 7. Candidate evaluates if an uncertainty exists with the calculated exists with calculated values. tilt values in order to request, and compare to a Tilt Review Map.

EVALUATOR CUE: Inform the Candidate that no uncertainty exists and a Tilt Review Map is not required.

COMMENTS:

1/2-ADM-1303.F02 RTL#A5.640U Page 7 of 8 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 1CR-003 JPM TITLE: Perform a Quadrant Power Tilt Ratio Calculation STEP STANDARD

('"C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)= S/U 8.C Candidate determines if QPTR is &.C Candidate compares test data with acceptance criteria to ensure within specification. QPTR does not exceed 1.02.

EVALUATOR NOTE: This step is SAT if the Candidate correctly determines tilt is within or out of specification and the calculation is within the tolerance band of+/- 3 mA of the values in Data Sheet 1 Key.

COMMENTS:

STOP TIME:

Beaver Valley Power Station Unit 1 1OST-2.4A Issue 4 Revision 2 Operating Surveillance Test Page 8 of 10 Quadrant Power Tilt Ratio Manual Calculation DATA SHEET 1 MANUAL QPTR CALCULATION UPPER DETECTORS Current (Uncor.) Norm Factor Current (Cor.) Tilt Ratio N41A N42A N43A N44A SUMý LOWER DETECTORS Current (Uncor.) Norm Factor Current (Cor.) Tilt Ratio N41B N42B N43B N44B SUM AVG Performed By I /_(Init/Time/Date)

Verified By _I (Init/Date)

~r'*AT OLJT 4 UM1."

I MonilE

RTL#A5.640U 1/2-ADM-1303.F02 Page 1 of 5 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE 3PM NUMBER: LLOT4 - New (RO) 3PM TITLE: Prepare a Clearance Tagout JPM REVISION: 0 K/A

REFERENCE:

2.2.13 3.6 TASK ID: 0481-020-03-013 JPM APPLICATION: [-] REQUALIFICATION Z INITIAL EXAM -- TRAINING F] FAULTED 1PM Z ADMINISTRATIVE 3PM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY:

Z Perform [j Plant Site - Annual Requal Exam [] BVT F-- Simulate E] Simulator Z Initial Exam Z NRC Z Classroom E] OJT/TPE -] Other:

L] Training

_-[] Other:

EVALUATION RESULTS Performer Name: Performer SSN:

Time [--] Yes Allotted 20 mu Actual minutes Critical: [ No Time: Time:

Z1SAT 3PM RESULTS. El UN SAT (Comments required for UNSAT evaluation)

Comments:

OBSERVERS Name/SSN: Name/S SN:

Name/S SN: Name/SSN:

EVALUATOR Evaluator (Print): Date:

Evaluator Signature:

RTL#A5.640U 1/2-ADM- 1303.F02 Page 2 of 5 Revision I OPERATIONS JOB PERFORMANCE MEASURE IJPM NUMBER: 1LOT4 - New (RO)

JPM REVISION: 0 JPM TITLE: Prepare a Clearance Tagout!

1 EVALUATOR DIRECTION SHEET TASK STANDARD: Prepare a clearance tagout section.

RECOMMENDED Control Room STARTING LOCATION:

DIRECTIONS: You are to simulate (perform) the task of preparing a clearance tagout.

INITIAL CONDITIONS: The plant is operating at 100% power with all systems in their normal operating alignment. A tagout section has been prepared to isolate and drain [1QS-P-2B], RWST Recirculation Pump.

INITIATING CUE: As the Reactor Operator, your Supervisor requests you to review the tagout section and report your results.

REFERENCES:

NPDAP-3.4, Rev. 14 1OM-37.5.B.7, Rev. 18 OP Manual Fig. No. 13-1, Rev. 11 TOOLS: None HANDOUT: NPDAP-3.4, Rev. 14 Copy of OP Manual Fig. No. 13-1 1OM-37.5.1B.7

RTL#A5.640U 1/2-ADM- 1303.F02 Page 3 of 5 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • E1 Read:

TASK: Prepare a clearance tagout section.

INITIAL CONDITIONS: The plant is operating at 100% power with all systems in their normal operating alignment. A clearance tagout has been prepared to isolate and drain [1QS-P-2B], RWST Recirculation Pump.

INITIATING CUE: As the Reactor Operator, your Supervisor requests you to review the tagout section and report your results.

"E1 At this time, ask the evaluator any questions you have on this JPM.

the JPM".

F1 When satisfied that you understand the assigned task, announce "I am now beginning E] Simulate performance or perform as directed the required task.

Point to any indicator or component you verify or check and announce your observations.

After determining the Task has been met announce "I have completed the JPM".

Then hand this sheet to the evaluator.

RTL#A5.640U 1/2-ADM-1303.F02 Page 4 of 5 Revision I OPERATIONS JOB PERFORMANCE MEASURE New (RO) 1PM TITLE: Prepare a Clearance Tagout I

1PM NUMBER: 2LOT3 -

PM REVISION: 011 STEP STANDARD

("C" Denotes CRITICAL STEP) (Indicate "S"FOR SAT or "U"FOR UNSAT)* S/U START TINE:__ _____

EVALUATOR NOTE: This task is normally performed using the NOMS clearance computer and signed electronically. For the purpose of this JPM, inform the Candidate to report the results of the tagout review in place of signing the tagout form.

EVALUATOR NOTE: This step is optional and may not be performed by Candidate. Mark step N/A if not performed. After locating procedure, provide Candidate a copy of NPDAP 3.4.

1. Locates NPDAP-3.4. 1. Candidate locates procedure NPDAP-3.4.

COMMENTS:

1/2-ADM-1303.F02 RTL#A5.640U Page 5 of 5 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE IJPM NUMBER: 2LOT3 - New (RO) JPM TITLE: Prepare a Clearance Tagout STEP STANDARD

("C" Denotes CRITICAL STEP) (Indicate "S"FOR SAT or "U" FOR UNSAT)* S/U EVALUATOR NOTE: Provide JPM handout with a copy of tagout forms and OP Manual Fig. No. 13-1.

2.C. Review tagout points for adequacy Candidate verifies appropriate clearance points are selected.

and report results.

2.2.C Candidate identifies the following tagout errors:

2.2.1 480V breaker listed is NOT correct. The correct breaker is MCC-1-19-G (reference 1OM-37.5.B.7 page 39).

2.2.2 Valve 1QS-82 is NOT correct. The correct valve is IQS-83 (reference OP Manual Fig. No. 13-1).

2.2.3 Valve 1QS-21 is incorrectly listed in the "SHUT" position for Restoration Configuration.

2.3. Reports that the tagout is NOT correct as written.

COMMENTS:

STOP TIME:

1W09-13 -QS -003 0612212001 08:47 Beaver Valley Power Sta. 1BVP-01-1 Page 1 of I Equipment ID:

1QS-P-2B

Description:

MECH 01-019196-000 PUMP OVERHAUL Reason:

1LOT4 NRC Exam Admin. Topic (RO)

OP Manual Fig. No. 13-1 Hazards:

Work Required prior to Completion:

FILL AND VENT ON PICK UP Attribute Attribute Description Value Equipment Required For Mode Change N0 Restored/Removed Prior to Mode I/A

SF Clearance Required N10 ragout Type YON-OUTAGE

,learance Type RED DANGER Status Description User Verification Date Prepared Prepared By Wooley, Tom 06/21/2001 12:03 Reviewed Reviewed By 00/00/0000 00:00 Second Reviewed Second Reviewed By 00/00/0000 00:00

\pproved Approved By 00/00/0000 00:00 Issued for Work Issued for Work By 00/00/0000 00:00 Restoration Review Restoration Review By 00/00/0000 00:00 Removal Authorized removal Authorized By 00/00/0000 00:00 Clearance Closed learance Closed By 00/00/0000 00:00

Tag List foa '109-13 -QS -003 06/,- "100108:47

.Beaver Vallev PowerSta. 1BVP-01-1 Page 1 of 1 Equipment Equipment Tag Tag Place. Place. Rest. Rest. Notes Equipment ID Description Location Serial Type Conftg. Seq. Config. Seq.

1S1032 KNIFE SWITCH FOR ANNUNCIATOR 1-SRVB-713--1-SRVB-713-P--BAY 3-- Caution OPEN 1 CLOSED 8 WINDOW A6-28 1QS-P-2B-CS RWST RECIRC PUMP 2B CONTROL 1-SRVB-735-CONTROL ROOM -B Caution OFF 2 OFF 7 SWITCH BOARD SECTION B MCC-1-17-G CIRCUIT BREAKER FOR QS-P-2ALS AND 1 -SFGB-756-MOTOR CONTROL CE- Danger RACKED OUT 3 RACKED IN AND 6 QS-P-2AHS DOOR TAGGED ON 1QS-21 REFUEL RECIRC PP 2B DISCH ISOL 1-SFGB-735--AT PUMP Danger SHUT 4 SHUT 5 1QS-17 REFUEL RECIRC PP 2B SUCT ISOL 1-SFGB-735--AT PUMP Danger SHUT 5 OPEN 4 1QS-82 (PI-1QS-10SA) ROOT ISOL 1-SFGB-735--AT RWST RECIRC PP Danger OPEN 6 OPEN 3 1QS-83-3 (PI-1QS-105B) INSTRUMENT DRAIN VLV 1-SFGB-735-*........ -AT RWST Danger OPEN 7 SHUT 2 RECIRC PP 1QS-85 (1QS-P-2B) SUCT TEST CONN 1-SFGB-735--AT RWST RECIRC PP Danger OPEN 8 SHUT 1

RO ONLY QUESTION: A.3.1 A clearance is scheduled to be posted on the cesium removal ion dxchangers to replace the depleted resin. You are to enter the East Trench area to post the clearance tags. Your current annual whole body exposure is 4.5 REM Total Effective Dose Exposure (TEDE). The general area dose rate in the East Trench area is 2000 mR/hr. How long can you remain in the East Trench area without exceeding the 10CFR20 Whole Body TEDE Occupational Dose Limit?

ANSWER:

15 minutes

[10CFR20 Whole Body TEDE Occupational Dose Limit is 5 REM.

5R - 4.5R = 0.5R 0.5R @ 2RPhr. = 0.25 hr. (15 minutes)]

[ ] bracketed information is not required for full credit.

Technical

Reference:

10CFR20; 1/2-ADM-1601, Rev. 1 Learning Objective: LP-08-01-801, ELO 25 K/A: 2.3.1 Importance Rating: 2.6 Comments:

I LOT4 2/23/01 After Validation

RO ONLY QUESTION: A.3.2 NOTE: This is a closed reference question.

For the clearance posted on the cesium removal ion exchangers in the East Trench area, what specific Radiation Barrier Key will be needed for this entry?

ANSWER: RB 1X Key Technical

References:

1/2OM-48.3.1 Issue 3, Rev. 9 Learning Objective: LP-3SQS-2389, ELO 19 KA: 2.3.2 Importance Rating: 2.5 Comments:

ILOT4 2/23/01 After Validation

RO ONLY QUESTION: A.4.1 NOTE: This is a closed reference question.

During operation on the mid-shift an event occurs that has major failures of plant functions; however, it has been determined that any offsite releases are not expected to result in exposure above the EPA Protection Action Guidelines outside the Exclusion Area Boundary. A Site Area Emergency has been declared.

Who is responsible for the duties of Emergency Director at the beginning of the event?

ANSWER:

The NSS [assumes the role of Emergency Director.]

[ bracketed information not required for full credit.

Technical

Reference:

EPP, Rev. 13, Sections 3 and 5 Learning Objective EPP-9250, ELO 9 & 11 K/A: 2.4.12 Importance Rating: 3.4 Comments:

1LOT4 2/23/01 After Validation

RO ONLY QUESTION: A.4.1.2 NOTE: This is a closed reference question.

During operation on the mid-shift an event occurs that has major failures of plant functions; however, it has been determined that any offsite releases are not expected to result in exposure above the EPA Protection Action Guidelines outside the Exclusion Area Boundary. A Site Area Emergency has been declared.

List three of the Emergency Response Facilities activated for this event?

ANSWER:

Emergency Response Facilities activated for a SAE are:

1. Technical Support Center (TSC)
2. Radiological Operations Center (ROC)
3. Operations Support Center (OSC)
4. Emergency Operations Facility (EOF)
5. Joint Public Information Center (JPIC)

Accept any three (3) for full credit.

Technical

Reference:

EPP, Rev. 13, Sections 3 and 5 Learning Objective EPP-9250, ELO 9 & 11 K/A: 2.4.29 Importance Rating: 2.6 Comments:

1LOT4 2/23/01 After Validation