ML012530031
| ML012530031 | |
| Person / Time | |
|---|---|
| Site: | Boiling Water Reactor Owners Group |
| Issue date: | 09/06/2001 |
| From: | Pulsifer R NRC/NRR/DLPM/LPD1 |
| To: | Richards S NRC/NRR/DLPM/LPD4 |
| Pulsifer R M, NRR/DLPM, 415-3016 | |
| References | |
| Download: ML012530031 (5) | |
Text
September 6, 2001 RESCHEDULED TO SHOW CHANGE IN DATE AND TIME MEMORANDUM TO: Stuart A. Richards, Director Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:
Robert M. Pulsifer, Project Manager, Section 2
/RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING BETWEEN THE BWR OWNERS GROUP AND THE NRC STAFF DATE & TIME Tuesday, September 25, 2001 1:00 p.m. to 3:30 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North, 11555 Rockville Pike, Room O 5B-4 Rockville, Maryland 20852 PURPOSE:
To discuss issues with NRC management that are key to the Boiling Water Reactor Owners Group (see attached draft agenda).
PARTICIPANTS:
NRC BWROG S. Collins J. Kenny B. Sheron J. Gray J. Strosnider L. Summer G. Holahan J. Langenbach D. Matthews J. Kelly B. Boger W. Bohlke S. Dembek J. Klapproth R. Pulsifer. et al.
Project No. 691
Attachment:
Draft Agenda cc: See next page
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Commission Policy Statement on Staff Meetings Open to the Public" 65 Federal Register 56954, 9/20/2000. Members of the public who wish to attend should contact Robert M. Pulsifer at (301) 415-3016.
BWR Owners Group Project No. 691 cc:
Mr. James M. Kenny, Chairman BWR Owners Group PPL, Inc.
M/C GENA6-1 Two North Ninth Street Allentown, PA 18101 Mr. H. Lewis Sumner Southern Nuclear Company 40 Inverness Center Parkway PO Box 1295 Birmingham, AL 35242 Mr. Carl D. Terry Vice President, Nuclear Engineering Niagara Mohawk Power Corporation Nine Mile Point - Station OPS Bldg/2nd Floor PO Box 63 Lycoming, NY 13093 Mr. George T. Jones PP& L, Inc.
MC A6-1 Two North Ninth Street Allentown, PA 18101 Mr. John Kelly New York Power Authority 14th Floor Mail Stop 14K Centroplex Building 123 Main Street White Plains, NY 10601 Mr. Thomas G. Hurst GE Nuclear Energy M/C 782 175 Curtner Avenue San Jose, CA 95125 Mr. Thomas A. Green GE Nuclear Energy M/C 782 175 Curtner Avenue San Jose, CA 95125 Mr. William H. Bolke COMED 1400 Opus Place, Suite 400 Downers Grove, IL 60515 Mr. J. A. Gray, Jr. Vice Chairman BWR Owners Group New York Power Authority 123 Main Street White Plains, NY 10601 Mr. James W. Langenbach PECO Energy 965 Chesterbrook Blvd MC 62C-3 Wayne, PA 19087 Mr. James F. Klapproth GE Nuclear Energy M/C 706 175 Curtner Avenue San Jose, CA 95125
NRC/BWR OWNERS GROUP MANAGEMENT MEETING - SEPTEMBER 13, 2001 DRAFT AGENDA 8:30 Opening Remarks BWROG/NRC Review Joint Submittal Plan BWROG/NRC
- Review NRC/BWROG submittal schedule chart Stability BWROG
- Status of Detect and Suppress Committee work
- DIVOM curves Option 2 BWROG
- Provide feedback from Quad Cities Integrated Decision-Making Panel (IDP)
- Brief review of categorization results
- Brief discussion of special treatment
- Latest schedule for the program Option 3 BWROG
- Discuss BWROG approach to risk informing 10 CFR 50.46
- Discuss LOOP + LOCA proposed rulemaking Risk Informed Tech Specs BWROG
- Progress on Initiative 2 approval
- Status of Initiative 3 TSTF and BWROG Initiative 1
- Provide update on initiative schedules H2/O2 Monitor - Combustible Gas Control System BWROG
- BWROG letter submitted to justify non-safety classification for H2/O2 monitors and combustible gas control systems in June 2001. BWROG requests NRC to confirm review schedule.
NRC STATUS ISSUES Fluence Methodology NRC
- Provide status of NRC review of GE fluence methodology PASS Elimination NRC
- Status of NRC Tech Spec change approval notice RCIC Reportability NRC
- July 19, 2001 RIS 2001-14 accepted BWROG position regarding RCIC reportability.
- BWROG position is that RCIC PI should be consistent with reportability position.
ML NRC-001 OFFICE PDI-2/PM PDIV-2/LA PIV-2/SC NAME RPulsifer:sp EPeyton SDembek DATE 9/6/01 9/6/01 9/6/01 G:\\PDIV-2\\MtgNot9-13-01
Dated:, 2001 HARD COPY PUBLIC PDIV-2 r/f RPulsifer Receptionist (OWFN & TWFN)
E-mail RidsNrrOd (SCollins)
RidsNrrAdpt (BSheron)
RidsNrrDlpm(JZwolinski/LMarsh)
RidsNrrDlpmLpdiv(SRichards)
RidsNrrDlpmLpdiv2(SDembek)
RidsNrrLAEPeyton RidsNrrPMRPulsifer RidsOpaMail RidsOgcRp RidsAcrsAcnwMailCenter AHsia MMayfield MFields JStrosnider GHolahan DMatthews BBoger PMNS