Radiological Emergency Response Plan Implementing Procedures
ML012110219
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 07/20/2001
From: Webb T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
-RFPFR, NRC-01-078
Download: ML012110219 (31)


Text

NRC-01-078 Kewaunee Nuclear Power Plant N490, State Highway 42 Kewaunee, Wl 54216-9511 Committed to Nuclear Excellence 920-388-2560 Operated by Nuclear Management Company, LLC July 20, 2001 10 CFR 50, App. E U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

DOCKET 50-305 OPERATING LICENSE DPR-43 KEWAUNEE NUCLEAR POWER PLANT RADIOLOGICAL EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURES Pursuant to 10 CFR 50 Appendix E, attached is the latest revisions to the Kewaunee Nuclear Power Plant Radiological Emergency Response Plan Implementing Procedures (EPIPs). These revised procedures supersede the previously submitted procedures.

Pursuant to 10 CFR 50.4, two additional copies of this letter and attachment are hereby submitted to the Regional Administrator, U. S. Nuclear Regulatory Commission, Region III, Lisle, Illinois. As required, one copy of this letter and attachment is also submitted to the Kewaunee Nuclear Power Plant NRC Senior Resident Inspector.

Sincerely, Thomas J. Webb Site Licensing Director SLC Attachment cc - US NRC Senior Resident Inspector, w/attach.

US NRC, Region III (2 copies), w/attach.

Electric Division, PSCW, w/o attach.

QA Vault, w/attach.

KEWAUNEE NUCLEAR POWER PLANT July 19, 2001 EMERGENCY PLAN IMPLEMENTING PROCEDURES TRANSMITTAL FORM RETURN TO DIANE FENCL - KNPP OUTSIDE AGENCY COPIES (1-20)

T. Webb - NRC Document Control Desk (1)* Bob Hayden - Wisconsin Electric Power Co. (10)*

T. Webb - NRC Region HI (2 & 3)* Craig Weiss - Wisconsin Power & Light (11)*

T. Webb - NRC Resident Inspector (4) (receives Appx. A phone numbers)*

T. Webb - State of Wisconsin (5)* Jim Holthaus - Nuclear Management Company (12)*

T. Webb - KNPP QA Vault w/NRC Letter (15)*

PERSONAL COPIES (21-40) These copies are for the personal use of the listed individuals for reference or emergency response.

J. Bennett (33) D. Mielke (35) H. Kocourek (13) K. Hoops (28)

D. Masarik (32) D. Seebart (24) B. Bartelme (34)

REFERENCE COPIES - CUSTODIAN (41-100) These copies are for general reference by anyone. They are distributed throughout the plant and corporate offices. The named individual is the responsible custodian for the procedures and shall insure they are properly maintained.

STF (86, 87, 88) LOREB - STF (62, 66, 67, 68, 70, 72, 73, 74)

L. Duggan - Fuel Services (65) STF Library (43)

NO Library - KNPP (59) Resource Center (82, 89, 94, 131)

C. Sternitzky - ATF-2 (44) D. Schrank - Maintenance Off. (41)

D. Braun - ATF-3 (45) D. Krall - CR/SS Office (51, 56)

P. Ehlen - I&C Office (42) P&FS Adm - GB-D2 (Nuclear Library) (84)

M. Daron - Security Building (46) H. Kocourek - TSC (50)

P&FS Adm - GB D2-3 (EOF) (81) W. Galarneau - RAF (53)

H. Kocourek - OSF (52) W. Galarneau - SBF/EMT (54)

C. Hutter - ATF-1 (64) T. Schmidli - RPO (55)

WORKING COPIES (101-199) These copies of procedures are kept in the areas designated for use in response to an emergency. These are not complete sets, but contain only those procedures that are used to implement activities in the location where they are kept. Please dispose of any sections distributed that are not tabbed in the indicated copy.

W. Galarneau - RAF/RPO (106, 107) D. Krall - CR/Communicator ( 1l 6 )(Pardal Distribution)

W. Galarneau - SBF/ENV (108, 109) Simulator/Communicator (117)

W. Galarneau - SBF/EM Team (110, 111, llA) J. Fletcher - Security (121)

W. Galarneau - Aurora Medical Center (118, 119) N. Deda - Security Building (120)

W. Flint - Cold Chem/HR Sample Room (113) S. VanderBloomen (125)

N. Deda - SBF/SEC (114) J. Stoeger (126)

Originals to KNPP QA Vault Please follow the directions when updating your EPIP Manual. WATCH FOR DELETIONS!!! These are controlled procedures and random checks may be made to ensure the manuals are kept up-to-date.

  • THIS IS NOT A CONTROLLED COPY. ITISA COPY FOR INFORMATION ONLY 1

KEWAUNEE NUCLEAR POWER PLANT REVISION OF EMERGENCY PLAN IMPLEMENTING PROCEDURES July 19, 2001 Please follow the directions listed below. If you have any questions regarding changes made to the EPIPs, please contact Dave Seebart at ext. 8719. If you are a controlled copy holder (see cover page), return this page to Diane Fencl by August 17, 2001, SIGNED AND DATED to serve as a record of revision.

EPIP Index, dated 07-19-2001.

REMOVE INSERT PROCEDURE REV. PROCEDURE REV.

EPIP-EOF-12 0 EPIP-EOF-12 P EPIP-APPX-A-02 BJ EPIP-APPX-A-02 BK EPIP-APPX-A-03 BK EPIP-APPX-A-03 BL

_____i-I__ _

I CERTIFY Copy No.___ (WPSC No.) of the Kewaunee Nuclear Power Plant's EPIPs has been updated.

SIGNATURE DATE Please return this sheet to DIANE FENCL.

Diane Fencl Enclosure 2

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 07-19-2001 PROC. NO. TITLE REV. DATE EP-AD EPIP-AD-01 Personnel Response to the Plant Emergency G 06-05-2001 Siren EPIP-AD-02 Emergency Class Determination AA 06-19-2001 EPIP-AD-03 KNPP Response to an Unusual Event AB 03-20-2001 EPIP-AD-04 KNPP Response to Alert or Higher AC 03-20-2001 EP-AD-5 Site Emergency Deleted 04-27-87 EPIP-AD-05 Emergency Response Organization Shift Relief C 06-05-2001 Guideline EP-AD-6 General Emergency Deleted 04-24-87 EPIP-AD-07 Initial Emergency Notifications AM 01-30-2001 EP-AD-8 Notification of Alert or Higher Deleted 02-26-96 EP-AD-9 Notification of Site Emergency Deleted 04-27-87 EP-AD- 10 Notification of General Emergency Deleted 04-27-87 EP-AD- 11 Emergency Radiation Controls P 08-10-99 EP-AD-12 Personnel Assembly and Accountability Deleted 03-26-94 EP-AD- 13 Personnel Evacuation Deleted 04-25-94 EP-AD-13A Limited Area Evacuation Deleted 03-01-83 EP-AD-13B Emergency Assembly/Evacuation Deleted 03-01-83 EP-AD-13C Site Evacuation Deleted 03-01-83 EP-AD-14 Search and Rescue Deleted 05-25-94 EPIP-AD-15 Recovery Planning and Termination N 08-29-2000 EP-AD-16 Occupational Injuries or Vehicle Accidents Deleted 03-14-97 During Emergencies EP-AD- 17 Communications Deleted 03-05-84 EPIP-AD-18 Potassium Iodide Distribution 0 06-05-2001 EPIP-AD-19 Protective Action Guidelines P 10-31-2000 PAGE 1 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 07-19-2001 PROC. NO. TITLE REV. DATE EP-ENV EPIP-ENV-01 Environmental Monitoring Group Organization U 10-31-2000 and Responsibilities EPIP-ENV-02 Environmental Monitoring Team Activation W 06-15-2000 EP-ENV-3A Environmental Protection Director Actions and Deleted 09-26-84 Directives EP-ENV-3B EM Team Actions Deleted 09-26-84 EPIP-ENV-03C Dose Projection Using RASCAL Version 2.2 U 02-16-2000 Software EP-ENV-3D Revision and Control of ISODOSE II Deleted 02-14-95 EP-ENV-3E Manual Determination of X/Q Deleted 04-24-87 EP-ENV-3F Manual Determination of X/Q (Green Bay Deleted 05-30-86 Meteorological Data)

EP-ENV-3G Manual Dose Projection Calculation Deleted 06-02-89 EP-ENV-3H Protective Action Recommendations Deleted 04-13-90 EPIP-ENV-04A Portable Survey Instrument Use S 06-15-2000 EPIP-ENV-04B Air Sampling and Analysis V 09-12-2000 EP-ENV-4C Environmental Monitoring Teams Deleted 04-13-90 EPIP-ENV-04C Ground Deposition Sampling and Analysis V 09-12-2000 EPIP-ENV-04D Plume Tracking for Environmental Monitoring M 09-12-2000 Teams EP-ENV-5A LCS-1 Operation Deleted 04-14-86 EP-ENV-5B MS-3 Operation Deleted 04-14-86 EP-ENV-5C SAM II Operation Deleted 04-14-86 EP-ENV-5D PAC-4G (Alpha Counter) Operation Deleted 04-14-86 EP-ENV-5E Reuter-Stokes Operation Deleted 08-27-85 EP-ENV-6 Data Analysis, Dose Projections and Protective Deleted 12-21-81 Action Recommendations PAGE 2 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 07-19-2001 PROC. NO. TITLE REV. DATE EP-ENV-6 Alternate Sample Analysis and Relocation of Deleted 04-14-86 EM Team EP-ENV-6A Relocation of Site Access Facility (Habitability) Deleted 03-23-84 EP-ENV-6B SAF Environmental Sample Analysis Relocation Deleted 03-23-84 EP-ENV-7 Site Access Facility Communications Deleted 09-26-84 EP-ENV-8 Total Population Dose Estimate Calculations Deleted 04-14-86 EP-EOF EP-EOF-1 Corporate Emergency Response Organization Deleted 03-11-94 EPIP-EOF-2 Emergency Operations Facility (EOF) Activation X 10-24-2000 EPIP-EOF-03 Corporate Action for Unusual Event Z 06-01-2000 EPIP-EOF-04 Corporate Action for Alert or Higher AF 06-01-2000 EP-EOF-5 Corporate Staff Action for Site Emergency Deleted 04-24-87 EP-EOF-6 Corporate Staff Action for General Emergency Deleted 04-24-87 EP-EOF-7 Notification of Unusual Event Deleted 04-06-94 EP-EOF-8 Relocation of EOF Deleted 03-01-83 EPIP-EOF-08 Continuing Emergency Notifications S 09-26-2000 EP-EOF-9 Interface with Support Organizations Deleted 03-05-84 EP-EOF-9 Notification of Site Emergency Deleted 04-24-87 EP-EOF- 10 Notification of General Emergency Deleted 04-24-87 EPIP-EOF- 11 Internal Communication and Documentation T 06-01-2000 Flow EPIP-EOF-12 Media Center/Emergency Operation P 07-19-2001 Facility/Joint Public Information Center Security PAGE 3 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 07-19-2001 PROC. NO. TITLE REV. DATE EP-OP EP-OP-1 Control Room Emergency Organization Deleted 04-24-87 EP-OP-2 Emergency Control Room Activation for Deleted 04-24-87 Emergency Response EP-OP-3 Control Room Communications Deleted 04-24-87 EP-OSF EP-OSF-1 Operation Support Facility Emergency Deleted 04-24-87 Organization EPIP-OSF-02 Operational Support Facility Operations S 08-29-2000 EPIP-OSF-03 Work Requests During an Emergency N 09-12-2000 EP-OSF-4 Operational Support Facility Communications Deleted 04-24-87 EPIP-OSF-04 Search and Rescue D 09-12-2000 EP-RET EP-RET- 1 Radiation Emergency Team Organization Deleted 04-16-96 EPIP-RET-02 In-Plant Radiation Emergency Team S 06-05-2001 EPIP-RET-02A RPO - RAF Activation R 06-05-2001 EP-RET-2B Gaseous Effluent Sample and Analysis Q 03-03-98 EP-RET-2C Containment Air Sampling and Analysis Deleted 03-01-83 EPIP-RET-02D Emergency Radiation Entry Controls and M 06-12-2001 Implementation EP-RET-2E Handling of Injured Personnel Deleted 04-16-96 EP-RET-2F Personnel Decontamination Deleted 04-13-90 EPIP-RET-03 Chemistry Emergency Team 0 02-01-2000 EP-RET-3A Liquid Effluent Release Paths K 01-12-99 EP-RET-3B Post-Accident Reactor Coolant Alternate Deleted 01-25-88 Sampling Procedure EP-RET-3C Post Accident Operation of the High Radiation 0 0 1-18-2000 Sample Room PAGE 4 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 07-19-2001 PROC. NO. TITLE REV. DATE EP-RET-3D Containment Air Sampling Analysis Using M 01-18-2000 CASP EP-RET-3E Post Accident Operation of High Rad Sample Deleted 08-27-85 Room Inline Multiported Count Cave EPIP-RET-04 SBF Activation Q 06-12-2001 EP-RET-4A EOF Radiological Monitoring Deleted 03-10-83 EPIP-RET-04A SBF Operation/Relocation D 06-12-2001 EP-RET-4B Radiological Controls at Site Access Facility Deleted 07-12-94 EP-RET-4C Site Radiological Monitoring Deleted 07-12-94 EP-RET-4D SAM-II Operation Deleted 07-12-94 EP-RET-5 Plume Projection Deleted 09-26-84 EPIP-RET-05 Site Boundary Dose Rates During Controlled G 07-18-2000 Plant Cooldown EP-RET-5A Plume Projection Deleted 04-27-87 EP-RET-6 Dose Projection Deleted 04-24-87 EP-RET-7 Radiological Analysis Facility/Radiation Deleted 04-24-87 Protection Office Communications EPIP-RET-08 Contamination Control of the Aurora Medical 0 06-15-2000 Center EPIP-RET-09 Post-Accident Population Dose K 08-29-2000 EP-SEC EP-SEC-1 Security Organization Deleted 04-24-87 EPIP-SEC-02 Security Force Response to Emergencies V 10-31-2000 EP-SEC-2A Manual Activation of Emergency Sirens Deleted 04-16-82 EPIP-SEC-03 Personnel Assembly and Accountability Y 07-05-2001 EPIP-SEC-04 Security Force Actions for Dosimetry Issue 0 02-16-2000 EP-SEC-5 Security Force Response to the EOF Deleted 07-28-88 EPIP-SEC-05 Personnel Evacuation F 07-05-2001 PAGE 5 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 07-19-2001 PROC. NO. TITLE REV. DATE EP-TSC EP-TSC- 1 Technical Support Center Organization and 0 04-01-99 Responsibilities EPIP-TSC-02 Technical Support Center Activation R 07-18-2000 EPIP-TSC-03 Plant Status Procedure U 06-12-2001 EPIP-TSC-04 Emergency Physical Changes, Major Equipment L 08-29-2000 Repair EP-TSC-5 Technical Support Center Communications Deleted 04-24-87 Equipment EP-TSC-6 Assessment of Reactor Core Damage Deleted 09-30-86 EPIP-TSC-07 RV Head Venting Time Calculation H 03-07-2000 EPIP-TSC-08A Calculations for Steam Release from Steam M 03-07-2000 Generators EPIP-TSC-08B* STMRLS Computer Program E 03-07-2000 EP-TSC-8C* See EP-TSC-8B Deleted 04-16-92

  • EP-TSC-8B was totally deleted; therefore, EP-TSC-8C was changed to EP-TSC-8B EP-TSC-9 Core Damage Assessment Using Released Deleted 09-30-86 Radionuclides EP-TSC-9A* Core Damage Assessment I 02-23-99 EPIP-TSC-09B* CORE Computer Program I 03-07-2000 EP-TSC-9C* See EP-TSC-9B Deleted 04-16-92

EPIP-TSC-10 Technical Support for IPEOPs I 03-20-2001 PAGE 6 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 07-19-2001 FIGURES EPIP FIG # Figure EPIPFG DESCRIPTION REV. DATE EP-SEC-5 Technical Support EPIP-APPX-A-06 EP-FIG-o03 APPX-A-06-03 Center - KNP Floor Plan B 06-12-2001 Site Boundary Facility EPIP-APPX-A-06 EP-FIG-005 APPX-A-06-02 KNP Floor Plan A 10-31-2000 Radiological Analysis Facility - KNP Floor EPIP-APPX-A-06 EP-FIG-00S APPX-A-06-01 Plan A 10-31-2000 EPIP-EOF- 12 Division Office Building Form EPIPF-EOF-02-01 EP-FIG-009 EOF-12-01 (2nd Floor) Floor Plan B 10-24-2000 State/County Work Area - WPSC D2-1 EPIP-APPX-A-06 EP-FIG-012 APPX-A-06-08 Floor Plan C 10-31-2000 NRC Work Area EPIP-APPX-A-06 EP-FIG-013 APPX-A-06-09 WPSC D2-4 Floor Plan A 10-31-2000 Population Distribution by Geographical Sub EPIP-AD- 19 EP-FIG-014 AD- 19-01 Areas (with sectors) A 10-31-2000 EOF - WPSC D2-3 EPIP-APPX-A-06 EP-FIG-022 APPX-A-06-04 Floor Plan B 10-31-2000 Map - Location of JPIC, EPIP-EOF-12 EP-FIG-024 EOF-12-02 MBC, GOB, DOB, etc. A 10-24-2000 EP-SEC-5 EP-FIG-026 Site Map A 07-21-98 Floor Plan - Media APPX-A-6 EP-FIG-034 --- Briefing Center DEL 08-04-98 General Office EPIP-EOF-12 Building - WPSC (lst EPIP-APPX-A-06 EP-FIG-035 APPX-A-06-06 Floor) Floor Plan C 10-24-2000 Floor Plan - Corporate APPX-A-6 EP-FIG-037 - - - Response Center DEL 08-04-98 APPX-A-6 EP-FIG-038 - -- Floor Plan - JPIC DEL 08-04-98 EP-OSF-2 EP-FIG-039 High Priority Work ORIG 07-08-98 EP-OSF-2 EP-FIG-039A Lower Priority Work ORIG 07-08-98 JPIC - Federal Work EPIP-APPX-A-06 EP-FrG-043 APPX-A-06-10 Area - WPSC D2-9 A 10-31-2000 JPIC - State and County Work Area EPIP-APPX-A-06 EP-FIG-044 APPX-A-06-07 WPSC D2-8 A 10-31-2000 JPIC - Utility Work EPIP-APPX-A-06 EP-FIG-04S APPX-A-06-05 Area - WPSC D2-7 A 10-31-2000 Aurora Medical Center RET-08 EP-FIG-046 RET-08-01 Location A 06-15-2000 EPIP-APPX-A-02 --- APPX-A-02-01 ERO Call Tree A 01-30-2001 PAGE 7 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 07-19-2001 NUMBER TITLE REVISION DATE APPENDIX A APPX-A-1 Communication System Description AF 08-04-98 EPIP-APPX-A-02 Response Personnel Call List BK 07-19-2001 EPIP-APPX-A-03 Off-Site Telephone Numbers BL 07-19-2001 EPIP-APPX-A-06 WPSC Emergency Response Telephone Numbers X 05-16-2001 PAGE 8 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 07-19-2001 FORM EPIPF TITLE REV. DATE APPENDIX B EP-AD AD 7.1 Event Notice (Wisconsin Nuclear Accident Reporting P 02-01-2000 Form)

AD 7.2 State Call-Back - Question Guideline B 04-16-96 AD 11.1 Emergency Radiation Work Permit F 04-16-96 EP-ENV ENV-01-01 Environmental Dispatch Area Activation Checklist D 10-31-2000 ENV-01-02 EMT Status B 10-31-2000 ENV-01-03 Meteorological and Plant Status Data B 10-31-2000 ENV-01-04 EMT Orders/Field Data B 10-31-2000 ENV-02-01 EMT Activation Checklist M 06-15-2000 EP-EOF EOF-02-01 EOF Activation Checklist R 10-24-2000 EOF-02-02 EOF Deactivation Checklist K 10-24-2000 EOF 4.1 SRCL Initial Action Checklist B 09-16-97 EOF 4.2 Telephone Communications Log Sheet ORIG 04-16-96 EOF 8.3 Fax for Emergency Declaration or Status Updates F 09-21-99 EOF 8.5 Plant Emergency Status Report ORIG 02-21-95 EOF 8.6 Radiological Status Report C 03-14-97 EOF 11.2 Operating Status E 02-14-95 EOF 11.3 Environmental Status Board E 07-31-95 EOF-12-01 I.D. Badge Registration Form G 10-24-2000 EP-OSF OSF 2.2 Maintenance Work in Progress Deleted 07-08-98 OSF-03-01 Operational Support Facility Team Briefing B 09-12-2000 PAGE 9 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 07-19-2001 FORM EPIPF TITLE REV. DATE EP-RET RET-02A-02 Emergency Sample Worksheet E 06-05-2001 RET 2B. 1 Containment Stack Release (Grab Sample) C 04-16-96 RET 2B.2 Auxiliary Building Stack (Grab Sample) C 04-16-96 RET 2B.3 Auxiliary Building Stack (Sping Reading) C 04-16-96 RET 2B.4 Containment Stack (Sping Reading) B 04-16-96 RET 2B.5 Steam Release C 04-16-96 RET 2B.6 Field Reading (Grab Sample) A 04-16-96 RET-04-01 SAM-2 Counting Equipment Worksheet E 06-12-2001 RET 8.3 Hospital Survey 1 Deleted 06-05-2001 RET 8.4 Hospital Survey 2 Deleted 07-25-97 RET 8.5 Hospital Survey 3 Deleted 07-25-97 RET-08-06 Hospital Survey 4 F 06-15-2000 RET 9 Environmental TLD Record Sheet C 02-14-95 EP-SEC SEC-03.01 Emergency Accountability Log A 03-28-2000 SEC 4.1 Emergency Dosimeter Log F 02-16-2000 EP-TSC TSC 1.1 Plant Status Summary for SAM Implementation A 04-01-99 TSC 1.2 Severe Accident Management Summary and Strategy A 04-01-99 Recommendation TSC 1.3 Severe Accident Management - Status A 04-01-99 TSC 2.1 TSC and OSF Activation Checklist N 04-01-99 TSC 2.2 TSC Ventilation Checklist H 04-01-99 TSC-02-03 Emergency Response Data System (ERDS) Link Initiation G 05-04-2001 Checklist TSC-02-04 TSC Chart Recorder Operation Checklist D 01-30-2001 PAGE 10 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 07-19-2001 FORM EPIPF TITLE REV. DATE TSC 2.5 TSC and OSF De-activation Checklist ORIG 04-01-99 TSC-03-01 Plant System Status L 06-12-2001 TSC-03-02 Plant Equipment Status L 06-12-2001 TSC-03-03 Environmental Status Board 3 06-12-2001 TSC-03-04 Radiation Monitors H 06-12-2001 TSC-04-01 Emergency Physical Change Request F 08-29-2000 TSC-04-02 Emergency Physical Change Safety Review F 08-29-2000 TSC-04-03 Emergency Physical Change Index F 08-29-2000 TSC-07-01 Head Venting Calculation F 10-31-2000 TSC 8A.1 Steam Release Data Sheet (Energy Balance) G 02-14-95 TSC 8A.2 Steam Release Calculation Sheet (Energy Balance) F 02-14-95 TSC 8A.3 Steam Release Data/Calculation Sheet (Open Valve) D 02-14-95 TSC 8A.4 Steam Release Data/Calculation Sheet (STMRLS C 04-16-96 Program)

TSC 9A. 1 Core Damage Based on Reactor Vessel Level & Fuel Rod C 02-14-95 Temp.

TSC 9A.2 Core Damage Based on Radiation Monitors C 02-14-95 TSC 9A.3 Cs-134 and Cs-137 PCF Determination D 04-16-96 TSC 9A.4 Core Damage Based on Activity Ratios C 02-14-95 TSC 9A.5 Core Damage Assessment (Monitoring Data) D 04-16-96 TSC 9A.6 Core Damage Summary C 02-14-95 PAGE 11 OF 11

WISCONSIN PUBLIC SERVICE CORP. No. EPIP-EOF-12 IRev. P Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center Security Emergency PlanImplementing Procedure Date JUL 19 2001 I Page 1 of 11 Reviewed By 2 *4,/0, Approved By 7. cýLex' ,R3 L Nuclear 411 Y PORe I Y SRO Approval Of Safety 0 Yes Review 11 Yes Temporary 0 Yes Related 0 No Required 0I No Changes Required 0 No 1.0 Purpose 1.1 This procedure provides instruction for implementing security arrangements for Emergency Plan.

2.0 General Notes 2.1 None 3.0 Precautions and Limitations 3.1 All security stations will be staffed on a 24-hour per day basis unless mutually agreed upon by the Administrative Logistics Director (ALD) and the Security Leader.

3.2 Conflicts or misunderstandings concerning implementation of this procedure by the security company should be resolved promptly between the Security Leader and the ALD or the Emergency Response Manager (ERM).

3.3 IF unauthorized personnel interfere with the operation of the Emergency Operations Facility (EOF), doors marked by a circled "L" on Figure EPIPFG-EOF-12-01 can be locked.

Keys for these doors can be found hung on the backside of the door in the EOF storage closet to be issued to EOF personnel as needed.

4.0 Initial Conditions 4.1 This procedure shall be implemented when the Kewaunee Nuclear Power Plant declares an Alert, Site Emergency, or General Emergency, or at the request of an Emergency Response Manager, OR upon notification from the Point Beach Nuclear Plant that the Joint Public Information Center (JPIC) and Media Briefing Center are needed in support of a declared emergency at their plant.

n:\nucdoc\procedures\draft\epip\eeofl2.doc-Diane Fencl/Diane Fenc--Scott Vanderbloomen

No. EPIP-EOF-12 IRev. P Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center Security I Emergency Plan Implementing Procedure Date JL 19 2001 Page 2 of 11 5.0 Procedure 5.1 Administrative Logistics Director (ALD) or designee shall:

Note IF after normal work hours, THEN page one of thefollowing Pieschek representatives: Jody Crocker (920) 440-4752, Gary Pieschek (920) 556-2112, Ed Byrne (920) 556-4558.

5.1.1 Contact Pieschek Protective Services, (920) 468-0100, and inform them of the following:

  • Six (6) Security Officers and one (1) Security Leader are needed at the Wisconsin Public Service Corporation building complex 0 The Security Team should bring eight (8) mobile radios for team communication 0 They are to report to the Northeast entrance door under the skywalk of the Division Office Building (DOB-3)
  • The team should park in the lots to the East of the building complex Note The Green Bay ParkingAuthority phone number is (920) 448-3431.

5.1.2 During normal work hours, contact Project and Facility Services at ext. 1270 and instruct them to call the Green Bay Parking Authority to have Wisconsin Public Service Corporation (WPSC) parking lot monitoring suspended until further notice.

5.1.3 Obtain the security instruction manual for all security stations from the EOF (Conference Room D2-3) sealed bookcase.

5.1.4 Obtain badges for Station 1 (Red Media) and Station 5 (Yellow EOF/JPIC) from the EOF file cabinet, second drawer.

5.1.5 Provide the instruction manual for Security Station 5 and the Yellow badges (EOF/JPIC) to an EOF Support Person and direct them to implement Section 5.2 of this procedure.

5.1.6 Provide the instruction manual for Security Station 6 and the Yellow badges (EOF/JPIC) to a second EOF Support Person and direct them to implement Section 5.3 of this procedure.

1*

WISCONSIN PUBLIC SERVICE CORP. No. EPIP-EOF-12 Rev. P Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center Security

"- Emergency Plan Implementing Procedure Date JUL 19 2001 Page 3 of It 5.1.7 Upon arrival of the Security Team:

a. Transfer the remaining instruction and material packages and Station 1 (Red Media) badges to the Security Leader.
b. Provide the Security Leader with three (3) Green WPSC Contractor badges, one (1) for himself and one (1) each for the Security Officers staffing Station 1 and Station 5.
c. Answer any questions the Security Leader may have and inform him how you can be reached.
d. Obtain a security force radio from the Security Leader.
e. Accompany the Security Team Leader while he staffs the security stations.
f. When the security stations are staffed, introduce the Security Leader to the Nuclear Public Information Director (NPID).

5.1.8 When Final Conditions (See Section 6.0) are met:

a. Inform the Security Leader of the event close-out so he can release his personnel.

"b. Ensure that the Security Leader returns all security instructions and material packages to the EOF.

c. Ensure any doors that were locked in steps 5.8 and 5.10 are unlocked.
d. Ensure the completed Form EPIPF-EOF-12-01 is placed in EOF master file.
e. Ensure all security contractor time cards or invoices are properly processed.

5.2 The EOF Support Person (1) assigned by the ALD or his representative shall:

5.2.1 Obtain a small table and chair from the Copier Room located at the top of the stairs, in the first room on the left, Copier Room (D1) and put in place for Station 5 (See Figures EPIPFG-APPX-A-06-06, EPIPFG-EOF-12-02, EPIPFG-EOF-12-01, and the applicable instruction packages).

5.2.2 Until relieved by a contract Security Officer, follow the instructions for Station 5 as described in Section 5.9 of this procedure.

5.2.3 When the Security Team arrives, hold the Security Team in the hallway at the entrance for a briefing by the Administrative Logistics Director (ALD) or his designated representative.

5.3 The EOF Support Person (2) assigned by the ALD or his representative shall:

5.3.1 Hang signs as indicated on the floor plan for the Division Office Building (2nd Floor)

(Figure EPIPFG-EOF-12-01) by a circled "P."

WISCONSIN PUBLIC SERVICE CORP. No. EPIP-EOF-12 IRev. P Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center Security I Emergency Plan Implementing Procedure Date JUL 19 2001 Page 4 of 11 5.3.2 During the activation stage of the Emergency Operations Facility (EOF)/Joint Public Information Center (JPIC), go through the EOF/JPIC and issue badges to personnel at their duty stations.

a. Confirm they are a representative of one of the following organizations.

"* Wisconsin Public Service Corporation (WPSC) employees

"* Wisconsin Electric Power Company (WiEPCO) employees

"* State of Wisconsin emergency response personnel

"* Kewaunee County emergency response personnel

"* Manitowoc County emergency response personnel

"* US - Nuclear Regulatory Agency representatives

"* Federal Emergency Management Agency representatives

b. Log them into the EOF or JPIC by instructing the individual to enter the following information on Form EPIPF-EOF-12-01:

"* Printed last and first name

"* Signature

"* Organization Represented

"* Work Phone Number

c. Complete Form EPIPF-EOF-12-01 by entering the "date" and "time in."
d. Issue them a Yellow (EOF/JPIC) badge.

5.3.3 When individuals present in the EOF and JPIC have been badged, turn any remaining badges and the completed Registration Form, Form EPIPF-EOF- 12-01, over to Station 5.

5.3.4 Until relieved by a contract Security Officer, follow the instructions for Station 6 as described in Section 5.10 of this procedure.

5.4 Security Leader shall:

5.4.1 Review identification badge types with all Security Officers (See Attachment A).

5.4.2 Issue a Green WPSC Contractor badge to the Security Officers that will staff Station 1 and Station 5.

5.4.3 Assign a Security Officer with a radio to each Security Station 1 through 6, as "describedin Sections 5.5 through 5.10 of this procedure.

I - -

WISCONSIN PUBLIC SERVICE CORP. No. EPIP-EOF-12 I Kev. P Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center Security

" Emergency Plan Implementing Procedure "1 Date JUL 19 2001 Page 5 of 11 5.4.4 Ensure each Officer understands his responsibilities as described in steps 5.3 through 5.8 of this procedure.

5.4.5 Ensure that each Security Station has the appropriate information and material package.

5.4.6 Ensure all Security Station radios are functional.

5.4.7 Wear the green "Contractor" Wisconsin Public Service Corporation (WPSC) security badge (See Attachment A for description) while in the building complex. This will allow you access through the electronically controlled external doors of the complex to facilitate Security Team movement outside the buildings.

5.4.8 Periodically tour all Security Stations.

5.4.9 Periodically check in with the Administrative Logistics Director (ALD) at the EOF on status of security activities.

5.5 Security Station 1, Security Officer at (700 N. Adams St.) Receptionist Area, (See Figure EPIPFG-APPX-A-06-06) shall:

5.5.1 Control access to the building:

a. Allow entry to individuals with a Wisconsin Public Service Corporation (WPSC) badge, WPSC Contractor badge to badge (See Attachment A for description) themselves in (See Attachment A for description).
b. Provide access for individuals with only a Red Media badge or Yellow EOF/JPIC badge (See Attachment A for description) using the electronic release button at the reception counter or your Green WPSC Contractor badge.

5.5.2 IF personnel require access to the Media Briefing area and do not have a Red Media badge or Yellow EOF/JPIC badge (See Attachment A for description), THEN:

a. Require they show proper identification.
b. Direct representative of the following organizations to Station 5 for issuance of a Yellow EOF/JPIC badge (See Attachment A for description)

OR issue a badge:

"* Wisconsin Public Service Corporation (WPSC) employees

"* Wisconsin Electric Power Company (WEPCO) employees

"* State of Wisconsin emergency response personnel

  • Kewaunee County emergency response personnel

EPLP-EOF-12 Rev. PP SERVICE CORP. No. _ EPIP-EOF- 12 IRe.

WISCONSIN PUBLIC SERVICE WISCONSIN CORP.

Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center Emerlency Plan Implementing Procei I== *

  • Manitowoc County emergency response personnel
  • US - Nuclear Regulatory Agency representatives
  • Federal Emergency Management Agency representatives Note Media representativesdesiring access to the Media Briefing Center (MBC) must have an appropriateidentification issued by an organizationlisted below.

"* Print (newspaper,magazine, etc.)

"* Electronic (News services, Internet, etc.)

"* Broadcast (television, radio,etc.)

5.5.3 Log media representatives into the Media Briefing Center.

a. Instruct the individual to enter the following information on Form EPIPF-EOF-12-01:

"* Printed last and first name

"* Signature

"* Organization Represented

"* Work Phone Number

b. Complete Form EPIPF-EOF-12-01 by entering the "date" and "time in."
c. Issue a Red Media identification badge (See Attachment A for description).
d. Allow the individual access to the Media Briefing Center using the electronic release button at the reception counter or your WPSC Contractor badge.

5.5.4 IF an individual has no identification or identification seems out of order, THEN contact an Administrative Logistics Director (ALD) using the security radio.

5.5.5 When an individual leaves the complex for any reason other than emergency response duties, remind individual to:

a. Leave the facility through the same security station where they logged in.
b. Return the identification badge.

5.5.6 Maintain the check in logs until collected at the end of the event.

5.5.7 IF individuals check out through a security station other than the one at which they signed in, THEN radios can be used to notify the station with the log they are signed in on to log them out.

No. EPIP-EOF-12 I Rev. P Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center Security l Emergency Plan Implementing Procedure Date jUL 19 2001 Page 7 of 11 5.6 Security Station 2, Security Officer at (700 N. Adams St.) East of Receptionist Area, (See Figure EPIPFG-APPX-A-06-06) shall:

5.6.1 Allow entry to individuals with a Yellow (EOF/JPIC) badge (See Attachment A for description) complete access to the facility including the Media Briefing Center (MBC).

5.6.2 If needed, provide directions for utility, Federal, State, and County response persons with Yellow (EOF/JPIC) badges (See Attachment A for description) who are unsure of the route to the Emergency Operations Facility(EOF)/Joint Public Information Center (JPIC).

5.6.3 Allow entry to individuals with a Wisconsin Public Service Corporation (WPSC) badge, WPSC Contractor badge access to WPS facilities.

5.6.4 DO NOT ALLOW Red MEDIA badged persons (See Attachment A for description) down the East or South walkway or up the Lobby elevators.

5.6.5 Inform all media of the availability of Conference Room GI-1 as a work area.

5.6.6 Provide directions for individuals with a Red Media badge (See Attachment A for description) to the MBC or media work area (Conference Room GI-1) via the West walkway.

5.6.7 When an individual leaves the complex for any reason other than emergency response duties, remind individual to:

a. Leave the facility through the same security station where they logged in.
b. Return the identification badge.

5.6.8 Allow individuals with Wisconsin Public Service Corporation (WPSC) or Yellow EOF/JPIC identification badge (See Attachment A for description) access to the MBC via the media access route.

5.7 Security Station 3, Security Officer at (700 N. Adams St.) Media Briefing Center (MBC) stage entrance to Conference Room G1-5 and G1-6 (See Figure EPIPFG-APPX-A-06-06) shall:

5.7.1 Ensure that only personnel with Yellow EOF/JPIC identification badges (See Attachment A for description) access into the MBC through the stage entrance.

5.7.2 DO NOT ALLOW Red MEDIA badged persons (See Attachment A for description) down the East or South walkway or up the Lobby elevators.

I WISCONSIN PUBLIC SERVICE CORP. IRev. P No..... EPPE F1 Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center Security

- Emergency Plan Implementing Procedure Date JUL 1 9 2001 Page 8 of 11 5.8 Security Station 4, Security Officer at (700 N. Adams St.) North end of Media Briefing Center (MBC) Conference Room GI -5 and GI -6 (See Figure EPIPFG-APPX-A-06-06) shall:

5.8.1 Ensure that the doors leading to the inside stairwell are in the locked position. The allen wrench enclosed in the information package for Security Station 4 will release the door from open to the locked position.

5.8.2 Ensure that individuals in your field of view have a Red (Media) or Yellow (EOF/JPIC) identification badge (See Attachment A for description).

5.8.3 Direct those who do not have proper identification to Station 1.

5.8.4 Control the crowd and ensure that no unauthorized individuals enter the Media Center through the North external doors.

Note The Administrative Logistics Director(ALD) or alternate may be contacted using the security radio.

5.8.5 Requests to run cabling through the North external door must be approved by the ALD.

5.9 Security Station 5, Security Officer at (700 N. Adams St.) two-story Division Office Building (DOB) doorway below skywalk (See Figure EPIPFG-EOF-12-01) shall:

5.9.1 Control access to the building, allow entry to individuals with a Wisconsin Public Service Corporation (WPSC) badge, WPSC Contractor badge, or a Yellow EOF/JPIC badge (See Attachment A for description).

5.9.2 IF personnel require access to the Emergency Operations Facility(EOF)/Joint Public Information Center (JPIC) and do not have a Yellow EOF/JPIC badge (See Attachment A for description), THEN:

a. Require they show proper identification.

Note Individuals desiringaccess to the EOF/JPICwithout an appropriate identification issued by their organizationshall be identified by the Administrative Logistics Director(ALD) or his alternate.The ALD or alternatemay be contacted using the security radio.

b. Confirm they are a representative of one of the following organizations:
  • Wisconsin Public Service Corporation (WPSC) employees 0 Wisconsin Electric Power Company (WEPCO) employees
  • State of Wisconsin emergency response personnel
  • Kewaunee County emergency response personnel

I I WISCONSIN PUBLIC SERVICE CORP. No. EPIP-EOF-12 IRev. P Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center Securit Emergency Plan Implementing Procedure Date JUL 19 2001 Page 9 of 11

"* Manitowoc County emergency response personnel

"* US - Nuclear Regulatory Agency representatives

"* Federal Emergency Management Agency representatives

c. Log them into the EOF or JPIC by instructing the individual to enter the following information on Form EPIPF-EOF- 12-01:

"* Printed last and first name

"* Signature

"* Organization Represented

"* Work Phone Number

d. Complete Form EPIPF-EOF-12-01 by entering the "date" and "time in."
e. Issue a Yellow EOF/JPIC identification badge.

5.9.3 IF the individual is a local or national news media representative, THEN direct them to Station 1.

5.9.4 IF an individual has no identification or identification badge seems out of order, THEN contact an ALD using the security radio.

5.9.5 WHEN an individual leaves the complex for any reason other than emergency response duties, remind individual to:

a. Leave the facility through the same security station where they logged in.
b. Return their Red/Yellow identification badge.

5.9.6 Maintain the check-in logs until collected at the end of the event.

5.9.7 IF individuals check out through a security station other than the one at which they signed in, THEN radios can be used to notify the station with the log they are signed in on to log them out.

5.10 Security Station 6, Security Officer at central hallway to Emergency Operations Facility (See Figure EPIPFG-EOF-12-01) shall:

5.10.1 Patrol the Emergency Operations Facility (EOF), Joint Public Information Center (JPIC), the hallways surrounding them, and inspect individuals to ensure they have a Yellow EOF/JPIC identification badge (See Attachment A for description).

5.10.2 IF personnel require access to the EOF/JPIC and do not have a Yellow EOF/JPIC badge (See Attachment A for description), THEN direct them to Station 5 OR issue a badge.

No. EPIP-EOF-12 Rev. P WISCONSIN PUBLIC SERVICE CORP.

Title Media Center/Emergency Operation Kewaunee Nuclear Power Plant Facility/Joint Public Information Center Security S Emergency Plan Implementing Procedure Date JUL 1 9 2001 Page 10 of 11 to 5.10.3 IF the individual is a local or national news media representative, THEN direct them Station 1.

5.10.4 IF an individual has no identification or identification badge seems out of order, THEN contact an Administrative Logistics Director (ALD) using the security radio.

5.10.5 IF access control becomes a problem, THEN the locking doors (doors with a circled "L" on Figure EPIPFG-EOF-12-01) may be locked.

5.10.6 WHEN an individual leaves the complex for any reason other than emergency response duties, remind individual to:

a. Leave the facility through the same security station where they logged in.
b. Return their identification badge.

6.0 Final Conditions 6.1 Plant emergency has been Terminated or Recovery actions have begun and the responsible director has suspended the use of EPIPs.

7.0 References 7.1 Attachment A, Badge Graphic 7.2 Figure EPIPFG-EOF-12-01, Division Office Building (2 nd Floor) Floor Plan 7.3 Figure EPIPFG-EOF-12-02, Map - Location of JPIC, MBC, GOB, DOB, etc.

7.4 Figure EPIPFG-APPX-A-06-06, General Office Building - WPSC (1st Floor) Floor Plan 7.5 Form EPIPF-EOF-12-01, I.D. Badge Registration Form 8.0 Records 8.1 The following QA records and non-QA records are identified in this directive/procedure and are listed on the KNPP Records Retention Schedule. These records shall be maintained according to the KNPP Records Management Program.

8.1.1 QA Records None 8.1.2 Non-QA Records

. I.D. Badge Registration Form, Form EPIPF-EOF-12-01

EMERGENCY STAFF EOF/JPIC (Yellow Badge) 0o PHOTO NAME (Gray Border)

,.,., ~~~~~Da.. f 1 1 e:=,*1 iW Iv Attachment A EPIP-EOF-1 2 Rev. P Date: JUL 1 9 LuuI

WISCONSIN PUBLIC SERVICE CORP. No. EPIP-APPX-A-02 FRev. BK Title Response Personnel Call List Kewaunee Nuclear Power Plant Emergency Plan Implementing Procedure Date JUL 1.9 2001 Page 1 of 3 Reviewed By "/41m* * *- Approved By * ). **_

Nuler Ys OR 11 e SRO Approval Of [] Yes Safety Review T eprr Related 0 No Required EI No Changes Required 0 No 1.0 Purpose 1.1 This appendix provides a consolidated list of all Emergency Response Organization (ERO) members sorted three ways:

"* By facility, then ERO position

"* Accountability Coordinators by Facility

"* All members alphabetically by last name 2.0 General Notes 2.1 This appendix may be used as a reference document for any declared emergency as defined in EPIP-AD-02, "Emergency Class Determination."

-. 3.0 Precautions and Limitations 3.1 Changes made to the ERO between quarterly updates are managed in the WPSR Corporate Database "PeopleSoft."

3.2 The appendices to this procedure are reviewed and updated quarterly. This review and update is required to fulfill the requirements of the Emergency Plan Section 8.3.1.

4.0 Initial Conditions 4.1 This appendix is used for reference during an emergency at the Kewaunee Nuclear Power Plant (KNPP).

5.0 Procedure 5.1 This appendix will be updated quarterly.

6.0 Final Conditions 6.1 Plant Emergency has been Terminated or Recovery actions have begun and the Emergency Response Manager has suspended the use of EPIPs.

\\knpp\voll\nucdoc\procedures\draft\epip\eappxa02.doc-Diane Fend/Diane Fend-Jeanne Ferns

EPIP-APPX-A-02 Rev. BK SERVICE CORP.

PUBLIC SERVICE No.

No. EPIP-APPX-A-02 I Rev. BK WISCONSIN PUBLIC WISCONSIN CORP.

Title Response Personnel Call List Kewaunee Nuclear Power Plant

- Emergency Plan Implementing Procedure I Date .nh' 1 9 2Q91 I Paqe 2 of 3 Date .1111 19 2991 7.0 References 7.1 Attachments

"* EPIP Table Appx-A-2.1, Appx-A Response Personnel Call List (Facility)

"* EPIP Table Appx-A-2.2, Appx-A Response Personnel Call List (Accountability Coordinators)

"* EPIP Table Appx-A-2.3, Appx-A ERO Qualified Personnel Assignments (Response Personnel Sorted By Name) 7.2 EPMP-05.03, Telephone Number Quarterly Review 7.3 EPIP-AD-02, Emergency Class Determination 8.0 Records 8.1 The following QA records and non-QA records are identified in this directive/procedure and are listed on the KNPP Records Retention Schedule. These records shall be maintained according to the KNPP Records Management Program.

8.1.1 QA Records None 8.1.2 Non-QA Records None

Appx-A Response Personnel Call List (Facility)

EPIP Table Appx-A-2.1 Appx-A Response Personnel Call List (Accountability Coordinators)

EPIP Table Appx-A-2.2 Appx-A ERO Qualified Personnel Assignments (Response Personnel Sorted By Name)

EPIP Table Appx-A-2.3 The data contained on the attached tables have been intentionally omitted from external copies of this document.

This data is withheld to ensure the privacy of the employees of Nuclear Management Company, LLC, Wisconsin Public Service Corporation, and off-site support groups which have supplied personal information for internal use by Nuclear Management Company. It has also been done to ensure the security of the Kewaunee Nuclear Power Plant Emergency Communications Systems.

All company-held copies of this appendix do contain the telephone numbers and other communication data needed to ensure a prompt response of on-site and off-site support groups over the established communication systems.

Page 3 ot 3 Appendix A-2 EPIP-APPX-A-02 Rev. BK Date: JUL 1 9 2001 Page 3 of 3

r -I REv. BL Nn FPTP-APPX-A-03 R(

WISCONSIN PUBLIC SERVICE CORP.

Title Off-Site Telephone Numbers Kewaunee Nuclear Power Plant DatA JIUL 19200O1 Pacle 1 of 7 Emergency .nun JUlmltILI&I&5 19 2 00 Reviewed By ,4,&2 ,,-/4.,f IApproved By Nuclear 0 Yes PORC 0 Yes SRTeApporvalrOf Yes Safety Review Temporary l] No Required f No Changes Required 0] No Related 1.0 Purpose 1.1 This appendix provides lists of telephone numbers for contacting:

  • Off-site agencies or organizations that may be called to respond or assist during a declared emergency at the Kewaunee Nuclear Power Plant (KNPP).

2.0 General Notes 2.1 This appendix may be used as a reference document for any declared emergency. If a listing of KNPP Emergency Response Facility phone numbers is needed, see "WPSC Emergency Response Facility Listing," EPIP-APPX-A-06.

3.0 Precautions and Limitations 3.1 This appendix is updated quarterly. Between these updates, changes may take place that are not recorded in this appendix.

4.0 Initial Conditions 4.1 This appendix is implemented during an emergency at the Kewaunee Nuclear Power Plant.

5.0 Procedure 5.1 Changes in telephone numbers which have occurred after the revision date (in header) will not be reflected in this appendix.

5.2 Changes to fax numbers preceded by an "" should be updated in the Prairie Systems Fax Broadcast List "008." For further information, reference "WPS Public Affairs Department,"

Procedure 6.4. 1, "Schneider Fax Broadcasting."

6.0 Final Conditions 6.1 Plant Emergency has been Terminated or Recovery actions have begun and the Emergency Response Manager has suspended the use of EPIPs.

n:\nucdoc\procedures\draft\epip\eappxao3.doc-Diane FencVDiane Fend-Scott Vanderbloomen

WISCONSIN PUBLIC SERVICE CORP. No. IRev. BL No EPOP-APPX-A-03 Rev.eBL Title Off-Site Telephone Numbers Kewaunee Nuclear Power Plant

"*-i Emergency Plan Implementing Procedure Date Dat JUL_

J...

1 99 2001 2001 Page 2 of 7 7.0 References 7.1 EPMP-05.03, Telephone Number Quarterly Review 7.2 EPIP-APPX-A-06, WPSC Emergency Response Telephone Numbers 7.3 6.4.1, Schneider Fax Broadcasting (WPS Public Affairs Department Procedure) 8.0 Records 8.1 The following QA records and non-QA records are identified in this directive/procedure and are listed on the KNPP Records Retention Schedule. These records shall be maintained according to the KNPP Records Management Program.

8.1.1 QA Records None 8.1.2 Non-QA Records None

OFF-SITE SUPPORT AGENCY TELEPHONE NUMBERS EPIP-APPX-A-03 The data contained on these pages have been intentionally omitted from external copies of this document.

This data is withheld to ensure the privacy of the employees of Nuclear Management Company, LLC, Wisconsin Public Service Corporation, and off-site support groups which have supplied personal information for internal use by Nuclear Management Company. It has also been done to ensure the security of the Kewaunee Nuclear Power Plant Emergency Communications Systems.

All company-held copies of this appendix do contain the telephone numbers and other communication data needed to ensure a prompt response of on-site and off-site support groups over the established communication systems.

Appendix A-3 EPIP-APPX-A-03 Rev. BL Date: Page 3 of 7 JUL 19 2001