June 6, 2001 Mr. Alan P. Nelson Nuclear Energy Institute 1776 I Street, NW., Suite 400 Washington, DC 20006-3708

SUBJECT:

LICENSE RENEWAL DEMONSTRATION PROJECT

Dear Mr. Nelson:

We received your May 24, 2001 letter, enclosing two examples demonstrating how the Generic Aging Lessons Learned (GALL) report could be used in a license renewal application. As you mentioned in your letter, these examples are based on the August 2000, draft of GALL and License Renewal Standard Review Plan (SRP-LR). The future license renewal applications will be based on the latest version of license renewal documents available at that time. As discussed in the May 1, 2001 meeting, we will review these examples, and prepare request for additional information, safety evaluation reports, and a list of inspection verification items. This effort should provide information to address the questions in your letter and clarify the appropriate use of GALL as a reference in the renewal process. As requested, we are enclosing our schedule for the license renewal demonstration project. If you have any question regarding this matter, please contact S. K. Mitra at (301) 415-2783 or Sam Lee at (301) 415-3109.

Sincerely,

/RA/

Christopher I Grimes, Chief License Renewal and Standardization Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Project No. 690

Enclosure:

As stated cc w/encl: See next page

Mr. Alan P. Nelson Nuclear Energy Institute 1776 I Street, NW., Suit 400 Washington, DC 20006-3708

SUBJECT:

LICENSE RENEWAL DEMONSTRATION PROJECT

Dear Mr. Nelson:

We received your May 24, 2001 letter, enclosing two examples demonstrating how the Generic Aging Lessons Learned (GALL) report could be used in a license renewal application. As you mentioned in your letter, these examples are based on the August 2000, draft of GALL and License Renewal Standard Review Plan (SRP-LR). The future license renewal applications will be based on the latest version of license renewal documents available at that time. As discussed in the May 1, 2001 meeting, we will review these examples, and prepare request for additional information, safety evaluation reports, and a list of inspection verification items. This effort should provide information to address the questions in your letter and clarify the appropriate use of GALL as a reference in the renewal process. As requested, we are enclosing our schedule for the license renewal demonstration project. If you have any question regarding this matter, please contact S. K. Mitra at (301) 415-2783 or Sam Lee at (301) 415-3109.

Sincerely,

/RA/

Christopher I Grimes, Chief License Renewal and Standardization Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Project No. 690

Enclosure:

As stated cc w/encl: See next page Distribution:

See next page

  • See previous concurrence DOCUMENT NAME:C:\\Program Files\\Adobe\\Acrobat 4.0\\PDF Output\\reply to NEI letter of 5-24~.wpd OFFICE LA RLSB SC:RLSB BC:RLSB NAME EGHylton SKMitra PTKuo CGrimes DATE 6/01 /01*

6/5 /01*

6/5 /01*

6/ 6 /01 OFFICIAL RECORD COPY

DISTRIBUTION:

HARD COPY RLSB RF E. Hylton E-MAIL:

PUBLIC J. Johnson W. Borchardt D. Matthews C. Grimes W. Beckner B. Zalcman J. Strosnider G. Bagchi K. Manoly W. Bateman J. Calvo C. Holden P. Shemanski S. Rosenberg G. Holahan T. Collins B. Boger G. Galletti B. Thomas J. Moore R. Weisman M. Mayfield S. Bahadur A. Murphy W. McDowell S. Droggitis S. Duraiswami RLSB Staff A. Thadani R. Zimmerman C. Julian R. Gardner D. Chyu M. Modes J. Vora

License Renewal Demonstration Project SCHEDULE Milestone T-Date Receive Demo samples(SRP) 5/18/01 Receive Demo samples (6-C) 5/25/01 Draft SER and RAI from the Staff and Contractors(SRP) 6/13/01 Draft SER and RAI from the Staff and Contractors(6-C) 6/20/01 RAI to NEI 6/27/01 Public meeting with NEI to discuss RAI 7/3/01 RAI response from NEI 7/13/01 Public meeting with NEI to discuss RAI response 7/23/01 SER from DE and contractors 7/27/01 Inspection verification items to NEI 8/3/01 SER to NEI 8/29/01 Public meeting with NEI to discuss SER & Insp.

verification 9/5/01 Lessons learned report from staff and NEI 10/5/01 Public meeting to discuss Demo lessons 10/12/01 Enclosure

NUCLEAR ENERGY INSTITUTE Project No. 690 cc:

Mr. Joe Bartell U.S. Department of Energy NE-42 Washington, D.C. 20585 Mr. Richard P. Sedano, Commissioner State Liaison Officer Department of Public Service 112 State Street Drawer 20 Montipelier, Vermont 05620-2601 Mr. Douglas J. Walters Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, DC 20006-3708 DJW@NEI.ORG National Whistleblower Center 3238 P Street, N.W.

Washington, DC 20007-2756 Mr. Stephen T. Hale Florida Power & Light Company 9760 S.W. 344 Street Florida City, Florida 33035 Mr. Robert Gill Duke Energy Corporation Mail Stop EC-12R P.O. Box 1006 Charlotte, NC 28201-1006 Mr. Charles R. Pierce Southern Nuclear Operating Co.

40 Inverness Center Parkway BIN B064 Birmingham, AL 35242 Mr. David Lochbaum Union of Concerned Scientists 1707 H Street, NW Suite 600 Washington, DC 20006-3919 Mr. Garry Young Entergy Operations, Inc.

Arkansas Nuclear One 1448 SR 333 GSB-2E Russellville, Arkansas 72802