ML010370287

From kanterella
Jump to navigation Jump to search
Fitness for Duty (FFD) SEMI-ANNUAL Report, July - December 2000
ML010370287
Person / Time
Site: Crane  
Issue date: 01/31/2001
From: George Gellrich
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
+kBR1SISP20060302, -RFPFR, 5928-01-20032, FOIA/PA-2003-0351
Download: ML010370287 (4)


Text

AmerGen AmerGen Energy Company, LLC Telephone: 717-944-7621 An Exelon/British Energy Company Three Mile Island Unit 1 Route 441 South, P.0 Box 480 Middletown, PA 17057 January 31, 2001 5928-01-20032 U. S. Nuclear Regulatory Commission Att: Document Control Desk Washington, DC 20555

Dear Sir or Madam:

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION UNIT 1 (TMI-1)

DPR-50/DOCKET 50-289 THREE MILE ISLAND NUCLEAR STATION UNIT 2 (TMI-2)

DPR-73/DOCKET 50-320 FITNESS FOR DUTY (FFD) SEMI-ANNUAL REPORT, JULY - DECEMBER 2000 Pursuant to 10 CFR 26.71 (d), AmerGen Energy Company, LLC hereby submits the FFD Program Performance Data for TMI. As required, the attached report provides the following information:

i.

Drugs tested for, and cut-off levels; ii.

Workforce population tested (average number with unescorted access);

iii. Number tested (by Category and Total), and results by population and type of test; iv. Substance(s) identified;

v.

Random testing rate; vi. Summary of Management Action(s); and vii. List of events reported.

Sincerely, George H. Gelirich Plant Manager GHG/awm cc: TMI Senior Resident Inspector TMI-I Project Manager TMI-2 Project Manager Administrator Region I Region IIDRS GPUN TMI-2 Cognizant Officer File 01008

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR26 AmerGen Energy Company. LLC Company Three Mile Island Nuclear Generating Station Units 1 & 2, Middletown PA Location R. Goodrich Contact Name December 31, 2000 6 Months Ending Operating License and Docket DPR-50/Docket 50-289 (TMI-1)

Possession Only License and Docket DPR-73/Docket 50-320 (TMI-2)

(717) 948 - 8208 Phone (Include Area Code)

CUTOFFS: SCREEN/CONFIRMATION (ng/ml) <R] APPENDIX A TO 10CFR26 MARIJUANA

/

/

COCAINE OPIATES

/

AMPHETAMINES PHENCYCLIDINE ALCOHOL (% BAC)

LONG-TERM SHORT-TERM CONTRACTOR CONTRACTOR TESTING RESULTS LICENSEE EMPLOYEES PERSONNEL PERSONNEL AVERAGE NUMBER WITH UNESCORTED ACCESS

  • During this period, AmerGen Three Mile Island and Oyster Creek Contractors were combined into one (1) pool.

720 N/A 424*

/

/

/

/

/

/

PERFORMANCE DATA FOR PERSONNEL SUBJECT TO 10 CFR 26 REPORT PERIOD: JULY 2000 - DECEMBER 2000 THREE MILE ISLAND - ATTACHMENT - PAGE 2 of 3 BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES (THREE MILE ISLAND)

MARIJUANA COCAINE OPIATES AMPHE-PHENCY-ALCOHOL REFUSAL TAMINES CLIDINE TO TEST LICENSEE EMPLOYEES 0

0 0

0 0

0 0

LONG-TERM CONTRACTORS 0

0 0

0 0

0 0

SHORT-TERM CONTRACTORS 5

5 0

0 0

2 0

TOTAL 5

I5 0

0 0

2 0

12

PERFORMANCE DATA FOR PERSONNEL SUBJECT TO 10 CFR 26 REPORT PERIOD: JULY 2000 - DECEMBER 2000 THREE MILE ISLAND - ATTACHMENT - Page 3 of 3 TESTING RATE

1.

The annualized random testing rate for TMI Licensee Employees was 54.86%.

2.

The annualized random testing rate for Three Mile Island Contractor Personnel was 67.22%.

NOTE: The Contractor random pools for AmerGen Oyster Creek and Three Mile Island were combined into one (1) pool for the semi-annual period July 2000- December 2000.

SUMMARY

OF MANAGEMENT ACTIONS

1.

There were ten (10) TMI Contractor employees who tested positive for drugs as a result of Pre Access testing. The Contractor employees were denied unescorted access to the TMI protected area. There were two (2) TMI Contractor employees who tested positive for alcohol as a result of For-Cause testing. Both Contractor employees were denied unescorted access to the TMI protected area.

LIST OF EVENTS REPORTED

1.

There were no reportable events during this period.