BWR Owners Group, Meeting Notice, Key Issues Relating to the Boiling Water Reactor Owners Group, (I.E., Appendix R, Tech Spec Instrument Uncertainties, PASS, H2/O2 Monitors, H2 Recombiners, Option 2/Option3, Pipe Break Inside Containment)
ML010050010
Person / Time
Site: Boiling Water Reactor Owners Group
Issue date: 01/03/2001
From: Pulsifer R
NRC/NRR/DLPM
To: Richards S
NRC/NRR/DLPM
Pulsifer R M, NRR/DLPM, 415-3016
References
Download: ML010050010 (5)


Text

January 3, 2001 MEMORANDUM TO:

Stuart A. Richards, Director Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:

Robert M. Pulsifer, Project Manager, Section 2 Project Directorate I

/RA/

Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING BETWEEN THE BWR OWNERS GROUP AND THE NRC STAFF DATE & TIME Friday, January 19, 2001 8:30 a.m. - 11:30 a.m.

LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O 5B-4 Rockville, Maryland 20852 PURPOSE:

To discuss issues with NRC management that are key to the Boiling Water Reactor Owners Group (see attached draft agenda).

PARTICIPANTS*:

NRC BWROG S. Collins J. Kenny B. Sheron J. Gray J. Strosnider L. Summer G. Holahan J. Langenbach D. Matthews J. Kelly B. Boger W. Bohlke J. Silber J. Klapproth, et al.

R. Pulsifer, et al.

Project No. 691

Attachment:

Draft Agenda cc w/att: See next page

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to the Commission Policy Statement on "Staff Meetings Open to the Public: Final Policy Statement," 65 Federal Register 56964, 9/20/2000. Members of the public who wish to attend should contact Robert M. Pulsifer at (301) 415-3016.

January 3, 2001 MEMORANDUM TO:

Stuart A. Richards, Director Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:

Robert M. Pulsifer, Project Manager, Section 2 Project Directorate I

/RA/

Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING BETWEEN THE BWR OWNERS GROUP AND THE NRC STAFF DATE & TIME Friday, January 19, 2001 8:30 a.m. - 11:30 a.m.

LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O 5B-4 Rockville, Maryland 20852 PURPOSE:

To discuss issues with NRC management that are key to the Boiling Water Reactor Owners Group (see attached draft agenda).

PARTICIPANTS*:

NRC BWROG S. Collins J. Kenny B. Sheron J. Gray J. Strosnider L. Summer G. Holahan J. Langenbach D. Matthews J. Kelly B. Boger W. Bohlke J. Silber J. Klapproth, et al.

R. Pulsifer, et al.

Project No. 691

Attachment:

Draft Agenda cc w/att: See next page

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to the Commission Policy Statement on "Staff Meetings Open to the Public: Final Policy Statement," 65 Federal Register 56964, 9/20/2000. Members of the public who wish to attend should contact Robert M. Pulsifer at (301) 415-3016.

DISTRIBUTION: See next page ACCESSION NO.: ML010050010 OFFICE PDI-2/PM PDIV-2/LA PDIV-2/SC NAME RPulsifer EPeyton SDembek DATE 01/03/01 01/02/01 01/03/01 OFFICIAL RECORD COPY

DISTRIBUTION FOR FORTHCOMING MEETING WITH BWR OWNERS GROUP ON JANUARY 19, 2001 Dated: January 3, 2001 Hard Copy:

PUBLIC PDIV-2 Reading Receptionist OWFN Receptionist TWFN E-Mail:

JZwolinski/SBlack (RidsNrrDlpm)

BSheron/MBanerjee (RidsNrrAdpt)

SCollins/RZimmerman (RidsNrrOd)

JStrosnider (RidsNrrDe)

GHolahan (RidsNrrDssa)

RPulsifer (RidsNrrPMRPulsifer)

EPeyton (RidsNrrLAEPeyton)

MFields (RidsNrrPMMFields)

SRichards (RidsNrrDlpmLpdiv)

SDembek DMatthews BBoger JSilber MMayfield FCoffman RidsOpaMailCenter RidsOgcMailCenter RidsAcrsAcnwMailCenter PMNS (Public Meeting Announcement Coordinator)

BWR Owners Group Project No. 691 cc:

Mr. James M. Kenny, Chairman BWR Owners Group PPL, Inc.

M/C GENA6-1 Two North Ninth Street Allentown, PA 18101 Mr. H. Lewis Sumner Southern Nuclear Company 40 Inverness Center Parkway PO Box 1295 Birmingham, AL 35242 Mr. Carl D. Terry Vice President, Nuclear Engineering Niagara Mohawk Power Corporation Nine Mile Point - Station OPS Bldg/2nd Floor PO Box 63 Lycoming, NY 13093 Mr. George T. Jones PP& L, Inc.

MC A6-1 Two North Ninth Street Allentown, PA 18101 Mr. John Kelly New York Power Authority 14th Floor Mail Stop 14K Centroplex Building 123 Main Street White Plains, NY 10601 Mr. Thomas G. Hurst GE Nuclear Energy M/C 782 175 Curtner Avenue San Jose, CA 95125 Mr. Thomas A. Green GE Nuclear Energy M/C 782 175 Curtner Avenue San Jose, CA 95125 Mr. William H. Bolke COMED 1400 Opus Place, Suite 400 Downers Grove, IL 60515 Mr. J. A. Gray, Jr. Vice Chairman BWR Owners Group New York Power Authority 123 Main Street White Plains, NY 10601 Mr. James W. Langenbach PECO Energy 965 Chesterbrook Blvd MC 62C-3 Wayne, PA 19087 Mr. James F. Klapproth GE Nuclear Energy M/C 706 175 Curtner Avenue San Jose, CA 95125

NRC/BWR OWNERS GROUP MANAGEMENT MEETING JANUARY 19, 2001 DRAFT AGENDA DISCUSSION TOPICS PRESENTER Appendix R Discuss status and closure of BWROG efforts and BWROG continued support of NEI follow-up actions.

BWROG Tech Spec Instrument Uncertainties Evaluations of BWR-4 and -6 Standard Tech Spec surveillances have been completed. Results confirm that for non-RG 1.105 parameters, no additional instrument uncertainty evaluations are warranted (nominal setpoints sufficient). For the RG 1.105 parameters, the evaluation has determined that less than 10% of the setpoint evaluations are required. This is an area for potential regulatory relaxation for BWRs.

BWROG PASS, H2/O2 Monitors, H2 Recombiners BWROG made a PASS submittal on 11/30/2000. NRC requested to discuss review status including plans on use of CLIIP. Submittal for H2/O2 Monitors and H2 Recombiners currently targeted for February 2001.

BWROG Option 2/Option3 Brief NRC on Owners Group progress on Option 2 effort. Discuss BWROGs plans for Option 3 Committee.

BWROG Pipe Break inside Containment Discuss the BWROG review of NRC's GSI for SEP plants.

BWROG BWR VIP Status of open submittals.

BWR VIP RCIC, Loss of Safety Function NRC status regarding review of BWROG submittal.

NRC Fluence Calculations NRC status regarding review of GE LTR.

NRC Loose Parts Monitoring Discuss status of submittal and planned resolution of RAI issues.

BWROG/NRC Equipment Reliability/Obsolesence Discuss BWROG efforts to improve plant performance by developing solutions to equipment reliability issues.

BWROG Control Room Habitability NRC status of staff activities for control room habitability.

NRC Tech Spec Issues Coordination Discuss BWROG Tech Spec Committee on-going efforts Including work to prioritize approved changes, and support risk informed changes.

BWROG Discussion and Tour of Work Planning Center NRC