C 1448 8R 333 Entbruy Operations, Inc.
November 16,1999 DOCKET NUMBER p m O N RULE PRM 5/07 lCAN119901
(@m%%
Ms. Annette Vietti-Cook Secretary U. S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Arkansas Nuclear One - Unit 1 Docket No. 50-3 13 License No. DPR-5 1 SAMA Petition for Rulemaking
. X Gentlemen:
The Nuclear Energy Institute (NEI) has petitioned the NRC to amend 10CFR Part 5 1 in order to eliminate the requirement to assess Severe Accident Mitigation Alternatives (SAMAs) as a part of the environmental review for license renewd. The NRC published a notice of receipt of the NEI petition and requested comments by November 16, 1999 (64 Federal Register 48117, dated September 2, 1999). Entergy Operations has recently performed a SAMA evaluation in mpport of the environmental review for the A r b s Nuclear One, Unit 1 (ANO-1) License Renewal Application (LRA). Preliminary results indicate that there is only one cost-beneficial SAM& and it is not age-related. Although the processes established for the evaluation of plant changes are expected to be beneficial, the insights provided by this review, with respect to license renewal, do.not just.@ the cost involved.
Although the timing of this rulemaking will not benefit the ANO-1 LRA submittal, elimination of the requirement to perform the SAMA review as a part of the license renewal process could be very beneficial to other licensees considering license renewal. Therefore, Entergy Operations endorses the comments being submitted by NEI and would also like to recommend that the Commission approve the NEI petition. Should you have any questions, please contact me.
D. Vander
~irkctor, Nuclear Safety
/.
f H
U. S. NRC November 16,1999 lCAN119901 Page 2 cc:
Mr. Ellis W. Merschoff Regional Administrator U. S. Nuclear Regulatory Commission Region IV 6 1 1 Ryan Plaza Drive, Suite 400 Arlington, TX 7601 1-8064
'MRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 3 10 London, AR 72847 Mr. Nick Hilton NRR Project Manager ~kgion IVIANO-1 U. S. Nuclear Regulatory Commission NRR Mail Stop 04-D-03 One White Flint North 1 1555 Rockville Pike Rockville, MD 20852 U. S. Nuclear Regulatory Commission
.Document Control Desk Mail Station OP 1-17 Washington, DC 20555 Mr. Steve HofEmn U. S. Nuclear Regulatory Commission NRR Mail Stop 0- 12G15 One White Flint North 1 15 55 Rockville Pike Rockville, MD 20852 Mr. Barry Zalcman U. S. Nuclear Regulatory Commission One White Flint North 1 1555 Rockville Pike Rockville, MD 20852