Issue Date: 09/07/00 60853 l
l l
l l
l l
NRC INSPECTION MANUAL SFPO/NMSS l
l INSPECTION PROCEDURE 60853 l
l l
ON-SITE FABRICATION OF COMPONENTS l
AND CONSTRUCTION OF AN ISFSI l
l l
PROGRAM APPLICABILITY:
2690 and 2515 l
l l
60853-01 INSPECTION OBJECTIVES l
l 01.01 To determine whether Independent Spent Fuel Storage Installation (ISFSI) dry cask storage l
system (DCSS) components are fabricated in accordance with:
l l
- a.
the Safety Analysis Report (SAR);
l l
- b.
the Quality Assurance (QA) program; l
l
- c.
the Safety Evaluation Report (SER);
l l
- d.
the Certificate of Compliance (CoC), or the site-specific license and technical specifications; l
and l
l
- e.
l l
01.02 To determine whether ISFSI construction activities are conducted in accordance with the l
QA program.
l l
01.03 To determine whether the licensee has reviewed ISFSI activities for determination of no l
adverse impact on site operations or Technical Specifications.
l l
l 60853-02 INSPECTION REQUIREMENTS l
l 02.01 Determine whether:
l l
- a.
materials, components, and other equipment received by the fabricator meet DCSS design l
procurement specifications; and l
l
- b.
the procurement specifications conform to the design commitments and requirements l contained in the SAR and, as applicable, the CoC or the site-specific license and technical l specifications.
l l
60853 Issue Date: 09/07/00 l
02.02 With regard to on-site DCSS fabrication activities, determine whether:
l l
- a.
the fabrication specifications are consistent with the design commitments and requirements l
documented in the SAR, and, as applicable, the CoC or the site-specific license and l
technical specifications; l
l
- b.
the licensee, vendor, and fabricator personnel have established an effective method for l
tracking, evaluating, and dispositioning changes or modifications to the DCSS component l
design; l
l
- c.
for selected design changes, the applicable documentation is complete and accurate, l
including relevant 10 CFR 50.59 or 72.48 evaluations; l
l
- d.
individuals performing quality-related activities are trained and certified where required; and l
l
- e.
the on-site fabricators personnel are familiar with the specified design, designated l
fabrication techniques, testing requirements, and quality controls associated with the l
construction of the DCSS.
l l
02.03 With regard to on-site DCSS fabrication QA activities, determine whether:
l l
- a.
they are conducted under an NRC-approved QA program (10 CFR 72.140);
l l
- b.
DCSS components are being fabricated per approved QA and 10 CFR Part 21 l
implementing procedures and fabrication specifications.
l l
- c.
the fabricators personnel are familiar with the reporting requirements of 10 CFR Part 21; l
l
- d.
the fabricator has complied with 10 CFR 21.6, Posting requirements; l
l
- e.
the fabricator has been audited by either the licensee or CoC holder; l
l
- f.
for selected audits and inspection findings from (as applicable) QA audit or surveillance l
and/or inspection reports issued in the previous 2 years, the findings were appropriately l
handled with corrective actions implemented in a time frame commensurate with their safety l
significance; l
l
- g.
supervision and quality control/assurance personnel perform appropriate oversight during l
fabrication activities; and l
l
- h.
nonconformance reports documenting the deficiencies have been initiated and resolved l
and corrective actions for identified fabrication deficiencies have been implemented in a l
time frame commensurate with their significance.
l l
02.04 With respect to ISFSI pad design:
l l
- a.
for generally licensed ISFSIs, if not previously done, perform Sections 2.01b and 2.02a of l
IP 60856; or l
l
- b.
for specific licensed ISFSIs, verify that design requirements contained in the SAR, SER, l
and license or technical specifications have been properly incorporated into documents l
governing construction of the ISFSI storage pad.
l l
02.05 If pad construction activities are observed, then verify:
l
Issue Date: 09/07/00 60853
- a.
through the review of records, that the pad's subsoil has been compacted or otherwise l
treated to meet the specifications defined in the SAR, SER, C of C, and, if applicable, the l
site-specific license and technical specifications; l
l
- b.
subsoil has been properly treated to meet the requirements specified for the ISFSI pad; l
l
- c.
the correct size, grade, and spacing of reinforcing steel are installed per the pad's l
specifications; l
l
- d.
restrictions on batch composition and time between mixing and pouring of concrete are met; l
l
- e.
concrete is properly placed in adequate forms, consolidated (vibrated), finished, and cured; l
l
- f.
slump and air entrainment tests fall within the specified values; l
l
- g.
the overall dimensions, orientation, and levelness of the pad meet the design specifications; l
l
- h.
compressive strength samples are collected, cured, and tested, per specifications, and tests l
indicate whether the concrete meets the specified minimum design strength; l
l
- i.
appropriate QA/QC involvement in and oversight of pad construction activities; and l
l
- j.
through interviews with selected workers and supervisors, that individuals are familiar with l
the design and construction specifications for the ISFSI pad.
l l
02.06 For other ISFSI-related items and activities, such as construction or modification of l
roadways/railways, buildings, security systems, and other support systems, such as cranes, l
verify:
l l
- a.
for specific licensed ISFSIs, that the design requirements contained in the SAR, SER, and l
license or technical specifications have been properly incorporated into documents l
governing construction or modification of these items; l
l
- b.
for generally licensed ISFSIs, that design requirements contained in the 10 CFR 72.212(b) l evaluations have been properly incorporated into documents governing construction or l
modification of these items; and l
l
- c.
if construction or modification activities are observed, then verify through interviews with l
selected workers and supervisors, that individuals are familiar with the design and l
construction specifications for the activity and that there is appropriate QA/QC involvement l
in and oversight of the activity.
l l
02.07 For generally licensed ISFSIs, if not previously done, perform Section 02.03 of IP 60856.
l l
l 60853-03 INSPECTION GUIDANCE l
l Definitions l
l
Participants:
The terms licensee, vendor, CoC holder, fabricator, general licensee, and site-l specific licensee are terms you will commonly encounter while reviewing ISFSI activities. Refer l to Inspection Manual Chapter (IMC) 2690, Inspection Program for Dry Storage of Spent Reactor l Fuel at Independent Spent Fuel Storage Installations, Section 03, for definitions of these terms. l l
Safety Classification: ISFSI systems, structures, and components (SSCs) are classified as either l important to safety or not important to safety by the ISFSI designer.
l l
60853 Issue Date: 09/07/00 l
If important to safety, the SSC will typically either:
l l
- 1.
maintain the functions or conditions (i.e., confinement, criticality, shielding, and heat l
removal) necessary to store spent fuel safely; l
l
- 2.
prevent significant damage to the spent fuel container (DCSS) during handling and storage; l
or l
l
- 3.
provide reasonable assurance that spent fuel can be received, handled, packaged, stored, l
and retrieved without undue risk to public health and safety.
l l
If an SSC does not perform any of the preceding functions, it may be classified as not important l
to safety.
l l
General Guidance l
l
- a.
Overall Focus: The inspection focus is to determine whether:
l l
- 1.
the fabricator is constructing on-site ISFSI components in accordance with an NRC l
approved QA program, and whether the DCSS component, as fabricated, will l
perform its intended function as stated in the SAR and, as applicable, the CoC or l
the site-specific license and technical specifications. DCSS components must be l
constructed under an NRC-approved QA program, which may be either the l
licensee's, CoC holders, or the fabricator's. Refer to IP 60851, Design Control of l
ISFSI Components, for guidance on inspecting design changes.
l l
- 2.
the ISFSI and its storage pad is designed and constructed in accordance with the l
site specific license and technical specifications or in accordance with the DCSS l
CoC, as applicable. Licensees for a generally licensed ISFSI will also need to review l
ISFSI activities for determination of no adverse impact on site operations or l
Technical Specifications.
Refer to IP 60856, Review of 10 CFR 72.212(b) l Evaluations for guidance on reviewing generally licensed ISFSIs.
l l
- b.
Additional Assistance: You may obtain additional assistance for both technical and design l
questions from the cognizant Spent Fuel Project Office (SFPO) project manager (PM).
l l
- c.
ISFSI SSCs Safety Classification: Before performing an inspection of ISFSI SSCs, the l
inspector should review the licensees design basis documents to determine whether the l
licensee has applied an appropriate safety classification to a particular SSC. Note that site-l specific variations in ISFSI designs may affect the safety classification of some SSCs.
l l
- d.
ISFSI SSCs Not Important to Safety: For this class of SSCs, the licensees use of generally l
accepted commercial-grade standards, practices, and materials in design, fabrication, and l
construction activities is acceptable. However, these SSCs must still conform to the design l
requirements described in the safety analysis report (SAR) and supporting engineering l
documents.
l l
- e.
Design Changes: Each DCSS design has been approved by the NRC through the licensing l
process, for a site-specific license, or the 10 CFR Part 72, Subpart L, process for a general l
license. All changes to the design described in the SAR must be approved by the licensee l
or CoC holder. Approval authority for changes can be difficult for the inspector to l
determine. In such cases, you can find additional guidance in IMC 2690, Section 05.10.
l (NOTE: Recent changes to Part 72 have extended the provisions of 72.48 to CoC holders, l
not just licensees.)
l l
- f.
Component Functionality: Functionality is the ability of a component to meet its design l
requirements. Some components may have multiple design requirements and several
Issue Date: 09/07/00 60853 functions. These requirements and functions are defined in the SAR, SER, and, as l applicable, the CoC or the site-specific license and technical specifications for the DCSS l
. For example, the cask support basket that separates the individual fuel bundles serves l several functions: structural integrity, criticality control, heat transfer, and radiation shielding. l Assistance in identifying the function(s) of a given component may be obtained from SFPO. l l
- g.
Document Review: Before any onsite inspection activity, for each DCSS in use, review l
(as applicable) the:
l l
- 1.
safety analysis report and corresponding NRC safety evaluation report; l
l
- 2.
certificate of compliance; l
l
- 3.
site-specific license and technical specifications; l
l
- 4.
10 CFR 72.212(b) evaluations for generally license ISFSIs; and l
l
- 5.
72.48 evaluations performed since the last update to the DCSS SAR.
l l
SARs and SERs describing DCSS components have been written for each type of l approved DCSS. Information on operational commitments for a particular DCSS may also l be found in the CoC or the site-specific license and technical specifications. As DCSS l designs vary, be careful to review the appropriate documentation. You can obtain copies l of these documents from the appropriate regional division or cognizant SFPO PM.
l l
60853 Issue Date: 09/07/00 l
Specific Guidance l
l 03.01 Verify that the procurement specifications conform to the design requirements contained in l
the SAR, CoC, and other applicable engineering documents. Place emphasis on instances in which l
components or raw materials do not meet the procurement specifications thus representing a l
nonconforming condition. Verify that the licensees or CoC holders design change process has l
evaluated and handled these nonconformances. Reference Section 03.03(h) of this procedure for l
guidance on the evaluation of nonconformances.
l l
You can find supplemental guidance on the quality classification levels of ISFSI components from l
references found in Section 05 of this inspection procedure.
l l
03.02 Guidance for on-site DCSS fabrication activities.
l l
- a.
Fabrication specifications include, but are not limited to, component material specifications, l
fabrication techniques, examination techniques, and required dimensions and tolerances.
l Previously identified problems related to DCSS component fabrication include l
l
- 1.
incomplete documentation of actual fabrication activities in fabrication traveler l
documents; l
l
- 2.
failure to explicitly state required critical component dimensions, such as minimum l
allowable wall thickness, on fabrication traveler documents; l
l
- 3.
failure to require verification of critical component dimensions using a specified non-l destructive examination (NDE) technique (i.e.- ultrasonic testing) as required in the l
DCSS design documentation; l
l
- 4.
design changes made outside of the approved design change process (e.g., by letter l
or memorandum);
l l
- 5.
inadequate oversight of fabrication activities by the licensee or CoC holder; and l
l
- 6.
fabrication of a component to a different safety classification than that shown in the l
design specifications.
l l
- b.
Determine, through review of records, inspection of equipment and components, and/or l
interviews with selected personnel, whether the licensee or CoC holder has performed l
design changes and modifications.
Evaluate the quality and timeliness of such l
documentation. Assess the thoroughness of documentation and the independence of l
reviews, particularly for those design changes that resolve nonconformances and field l
change requests. Check that evaluations contain a discussion of the effect on component l
functionality. You can find information on component functionality in the SAR, SER, CoC, l
or, as applicable, the site-specific license and technical specifications.
l l
Determine the adequacy of the timing of design change reviews. Ideally the licensee or l
CoC holder should complete the reviews before the component is fabricated. However, l
if the licensee elects to proceed with fabrication at risk, verify that the licensee does not l
use the DCSS until all design changes have been evaluated and appropriately l
dispositioned.
l l
Review IP 37700 for additional guidance and a listing of potentially related procedures.
l Note that although IP 37700 contains guidance on reactor design changes, ISFSI SSCs l
are only classified as important to safety or not important to safety, and a safety-related l
classification is not considered. Consequently, exercise caution in assessing the scope l
and thoroughness of the evaluations if you use IP 37700. Contact the cognizant SFPO l
PM for assistance on acceptable calculational methods or code applicability. You can
Issue Date: 09/07/00 60853 obtain supplemental information on the quality classification of components from references l
found in Section 05 of this inspection procedure.
l l
- c.
Design-basis accidents, such as a DCSS tipover or a drop from a maximum specified l height, are addressed in the SAR; however, you may obtain assistance from the cognizant l SFPO PM in determining whether a change requires NRC approval for a particular DCSS l design.
l l
- d.
Fabricator personnel performing quality functions may be welders, NDE inspectors, quality l control (QC) staff, and QA auditors. A program for certification of each of these personnel l should have been defined and implemented by the fabricator and approved by the licensee l prior to performance of quality activities by these individuals.
l l
- e.
No specific guidance.
l l
03.03 Guidance for on-site DCSS fabrication QA activities.
l l
a-d. No specific guidance.
l l
e-g. Determine if and when the licensee's QA staff or other licensees' QA staffs have audited l fabricator activities. You can obtain information about audits of specific fabricators from l
the owners' groups for specific DCSS designs, the licensee's QA staff, or NMSS/SFPO.
l l
You should obtain and review copies of audits and surveillances performed by onsite QA l personnel (the fabricators or other oversight groups such as the CoC holders or l licensees). Assess the quality and depth of the audits and surveillances and determine l if appropriate corrective actions were implemented for negative findings. You should also l review fabrication documents, such as travelers, to ensure that hold points are identified l and QA signatures made where required.
l l
- h.
For nonconformance reports in which the adverse condition is determined to be acceptable l "as is," the report should contain sufficient information to justify why the nonconforming l condition does not compromise the ability of the component to perform its intended l function(s). Nonconformances should be dispositioned before the DCSS is released to the l licensee, unless otherwise authorized by the licensee. Review nonconforming conditions l that are resolved by design changes to ensure that component function is not l compromised. You may obtain assistance in determining component function from l NMSS/SFPO. Also, you can find supplemental information on inspecting design changes l in IP 60851.
l l
03.04 Guidance on ISFSI pad design.
l l
- a.
Reference Sections 03.01b and 03.02a of IP 60856.
l l
- b.
No specific guidance.
l l
- c.
No specific guidance.
l l
03.05 IPs 46053 and 46051 may be used for supplemental guidance.
l l
03.06 No specific guidance.
l l
03.07 Reference Section 3.03 of IP 60856.
l l
l 60853-04 INSPECTION RESOURCES l
l
60853 Issue Date: 09/07/00 l
To prepare for these inspections, each inspector should spend approximately 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> on in-office l
review. Inspection activities will require approximately 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />, each, by three inspectors at the l
ISFSI site. Documentation is estimated to require 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> for each inspector. Inspection hours l
may vary, depending on the amount of activity occurring at the site.
l l
l 60853-05 REFERENCES l
l NRC Information Notice 95-28, Emplacement of Support Pads for Independent Spent Fuel Dry l
Storage Installations at Reactor Sites, June 5, 1995.
l l
NRC Information Notice 95-29, "Oversight of Design and Fabrication Activities for Metal l
Components Used in Spent Fuel Dry Storage Systems," June 7, 1995.
l l
NRC Inspection Manual Chapter 2690, Inspection Program for Dry Storage of Spent Reactor Fuel l
at Independent Spent Fuel Storage Installations, February, 1997 l
NRC IP 37700, Design Changes and Modifications, September,1990.
l l
NRC IP 60851, Design Control of ISFSI Components. May, 2000 l
l NRC IP 60852, ISFSI Component Fabrication by Outside Fabricators. August, 2000 l
l NRC IP 60856, Review of 10 CFR 72.212(b) Evaluations, November, 1999.
l l
NUREG/CR-6407, "Classification of Transportation Packaging and Dry Spent Fuel Storage System l
Components According to Importance to Safety," February 1996.
l l
10 CFR Part 21, Reporting of Defects and Noncompliance.
l l
10 CFR 72, Subpart L, Approval of Spent Fuel Storage Casks.
l l
10 CFR § 50.59, Changes, tests, and experiments.
l l
10 CFR § 72.48, Changes, tests, and experiments.
l l
END l