Safety Guide 6, Independence Between Redundant Standby (Onsite) Power Sources and Between Their Distribution SystemsML003739924 |
Person / Time |
---|
Issue date: |
08/10/1971 |
---|
From: |
Office of Nuclear Regulatory Research |
---|
To: |
|
---|
References |
---|
Download: ML003739924 (2) |
|
|
---|
Category:Regulatory Guide
MONTHYEARML23263A9972024-02-0202 February 2024 Watermarked - DG-5072 - Rev 0 of RG 5.90 - Guidance for Alternative Physical Security Requirements for Small Modular Reactors and Non-Light-Water Reactors ML23286A2682024-02-0202 February 2024 Watermarked - DG-5074 - Access Authorization - Econcurrence Version Clean (02-03-23) ML23286A2822024-02-0202 February 2024 Watermarked - DG-5076 - Physical Protection for Part 53 - 10-13-23 ML23286A2512024-02-0202 February 2024 Watermarked DG-5073 - Fitness for Duty Program for Part 53 - 10-13-23 ML23286A2862024-02-0202 February 2024 Watermarked - DG-5078, Fatigue Management for Nuclear Power Plant Personnel -10-13-23 ML23286A2782024-02-0202 February 2024 Watermarked - DG-5075 - Cyber Security 10-13-23 ML23194A1942023-08-31031 August 2023 Draft Regulatory Guide DG-1404, Revision 1 (RG 1.253 Rev 0) Guidance on Ticap for Non-LWRs ML23012A2422023-02-28028 February 2023 DG-1374 RG 1.152 Rev 4 Criteria for Programmable Digital Devices in Safety-Related Systems of Nuclear Power Plants ML22165A0722023-02-28028 February 2023 DG-4027, Draft Regulatory Guide 4.2 Supplement 1, Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications, Revision 2 ML23018A2932023-02-16016 February 2023 Draft Regulatory Guide DG-1418 (RG 1.212 Rev 2), Sizing Large Lead-Acid Storage Batteries. (ACRS Copy) Regulatory Guide 5.892022-11-0101 November 2022 Rev.0, Fitness-for-Duty Programs for Commercial Power Reactor and Category I Special Nuclear Material Licensees ML22067A0142022-03-31031 March 2022 Rev 3 ACRS Spent Fuel Heat Generation in an ISFSI ML22048B8222022-02-18018 February 2022 DG-1389 (ACRS Version for 3-16-22 Meeting) - Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors ML22040A0822021-10-30030 October 2021 Document to Support ACRS Subcommittee Meeting - Redline RG 1.57, Rev 3, Design Limits and Loading Combinations for Metal Primary Reactor Containment System Components ML21167A3512021-06-0101 June 2021 Rev 5 Final Watermarked for ACRS ML21092A1512021-05-0505 May 2021 Rev. 4 ACRS Version ML21092A1342021-05-0505 May 2021 Rev. 2 ACRS Version ML21181A2492021-04-30030 April 2021 Watermark for ACRS Fc Meeting RG 1.9 Rev 5 ML21006A3352021-04-0101 April 2021 DG 1381 for Rev 0 of RG 1.244 - Control of Heavy Loads for Nuclear Facilities ML20168A8832021-04-0101 April 2021 DG-1371, Proposed Rev 6 of RG 1.26, Quality Group Classifications and Standards for Water-, Steam-, and Radioactive-Waste-Containing Components of Nuclear Power Plants ML21006A3372021-04-0101 April 2021 Regulatory Analysis - DG 1381 - Control of Heavy Loads for Nuclear Facilities ML21083A2892021-02-28028 February 2021 Draft for Acrs Review ML21048A4482021-02-17017 February 2021 Rev. 2 ML20120A6292021-01-31031 January 2021 Operation and Maintenance Code Case Acceptability, ASME OM Code, Revision 4, (DG-1368) ML20120A6332021-01-31031 January 2021 Design, Fabrication, and Materials Code Case Acceptability, ASME Section III, Revision 39, (DG-1366) ML20120A6272021-01-31031 January 2021 ASME Code Cases Not Approved for Use, Revision 7 (DG-1369) ML20120A6312021-01-31031 January 2021 Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1, Revision 20, (DG-1367) ML21011A2312021-01-31031 January 2021 Rev 4 (Draft for ACRS Fc Review on 2-3-21) ML21012A1972021-01-12012 January 2021 a Performance-Based Approach to Define the Site-Specific Earthquake Ground Motion, RG 1.208, Revision 0 Regulatory Guide 1.200, Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities2020-12-31031 December 2020 Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities ML20183A4232020-12-31031 December 2020 Draft Regulatory Guide DG-1361 (Proposed Rev. 2 to Reg. Guide 1.89), Environmental Qualification of Certain Electrical Equipment Important to Safety for Nuclear Power Plants ML20238B8732020-12-29029 December 2020 Public Comment Resolutions on DG-1362 for RG 1.200, Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities ML20282A2982020-12-0404 December 2020 DG-3055, Rev 0, Regulatory Guide (RG) 3.76, Implementation of Aging Management Requirements for Spent Fuel Storage Renewals ML20282A2992020-12-0404 December 2020 Regulatory Analysis for DG-3055, Rev 0, Regulatory Guide (RG) 3.76, Implementation of Aging Management Requirements for Spent Fuel Storage Renewals ML20210M0472020-12-0101 December 2020 Draft Regulation Guide DG-1288: Plant-Specific, Risk-Informed Decisionmaking for Inservice Inspections of Piping ML20231A8562020-11-30030 November 2020 Draft Regulatory Guide DG-1360, Risk-Informed, Performance-Based Fire Protection for Existing Light-Water Nuclear Power Plants ML20231A8352020-11-30030 November 2020 Draft Regulatory Guide DG-1359, Fire Protection for Nuclear Power Plants ML20307A0462020-11-0202 November 2020 Draft for ACRS Public Meeting, RG 1.200, R3, Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities ML20210M0442020-10-28028 October 2020 Regulatory Analysis: Draft Regulatory Guide DG-1288 - an Approach for Plant-Specific, Risk-Informed Decisionmaking for Inservice Inspection of Piping (Proposed Revision 2 of Regulatory Guide 1.178, Dated September 2003) ML20154K5842020-09-17017 September 2020 Results of Periodic Review of Regulatory Guide (RG) 1.78 ML20182A7882020-08-31031 August 2020 DG 1373 for RG 1.240 - Fresh and Spent Fuel Pool Criticality Analyses ML20055G8232020-08-0707 August 2020 DG 1363 for Proposed Rev 4 to Regulatory Guide (RG) 1.105 - Setpoints for Safety-Related Instrumentation Regulatory Guide 3.152020-07-31031 July 2020 Regulatory Guide 3.15. Rev 2, Standard Format and Content of License Applications for Receipt and Storage of Unirradiated Power Reactor Fuel and Associated Radioactive Material at a Nuclear Power Plant Regulatory Guide 1.2362020-07-30030 July 2020 Draft for ACRS Review ML20119A6142020-04-28028 April 2020 Response to Comments for RG 1.236 for ACRS ML20105A4672020-04-14014 April 2020 Memo to OCA - for Revision 1 of Regulatory Guide 8.39, Release of Patients Administered Radioactive Material ML20099F0262020-04-0707 April 2020 Public Comment Resolution Table for DG 1341 (Regulatory Guide (RG) 1.188, Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses, Rev. 2 ML19206A4892020-02-0606 February 2020 Draft Regulatory Guide DG-1287, an Approach for Plant-Specific, risk-Informed Decisionmaking: Technical Specifications ML19116A0772019-08-31031 August 2019 Draft Regulatory Guide DG-5040, Urine Specimen Collection and Test Results Review Under 10 CFR Part 26, Fitness for Duty Programs. ML19203A0892019-07-31031 July 2019 Assessment of the Continued Adequacy of Revision 2 of Regulatory Guide 1.99 - Technical Letter Report 2024-02-02
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
8/10/71 SAFETY GUIDE 6 (ONSITE)
INDEPENDENCE BETWEEN REDUNDANT STANDBY SYSTEMS POWER SOURCES AND BETWEEN THEIR DISTRIBUTION group is never automatically interconnected A. Introduction under accident conditions with the standby General Design Criterion 17 requires that power source of a redundant counterpart.
onsite electrical power systems have sufficient There can also be compromises of independ independence to perform their safety functions ence resulting from automatic bus ties (both assuming a single failure. This safety guide a-c and d-c) which connect the loads of one load describes an acceptable degree of independence group to the power source of another in the between redundant standby (onsite) power event the power source of the first load group sources and between their distribution systems. has failed. The slightly improved defense against random failures achieved by these bus This guide does not address the suitability of ties is more than offset by the additional vul nearby hydroelectric, nuclear, or fossil units as nerability to common mode failures which they standby power sources at multiple-unit sites. create.
This matter will be evaluated on an individual A special case of the foregoing is the bus that case basis.
is automatically transferred to one or the other of two redundant standby power sources; this B. Definitions is commonly referred to as a swing bus. This Preferred Power System: The offsite external arrangement also compromises the independ commercial power system. ence of redundant power sources and their load Standby Power System: Those onsite power groups while adding little to the defense against sources and their distribution equipment random single failures.
provided to energize devices essential to The inclusion of a swing bus in an otherwise safety and capable of operation independ well designed system often results from an in ently of the preferred power system. compatibility between the number of standby power sources (whether a-c or d-c) and the Standby Power Source: An electrical generat number of redundant load groups. For example, ing unit and all necessary auxiliaries, an engineered safety feature system design usually a diesel generator set, which is part which depends on the operation of at least two of the standby power system. of three electrically driven pumps and which Load Group: An arrangement of buses, trans derives power from either of two redundant formers, switching equipment, loads, etc., standby power sources must provide for the fed from the same power source. swinging of one of the three pump motors in order to meet the single failure criterion. A C. Discussion compatible design, such as one based on three' power sources, would not utilize the swing fea There is evidence based on operating experi ture.
ence and analytical considerations that the par allel operation of standby power sources renders The necessity for a swing bus can also result from an incompatibility between the a-c and them vulnerable to common mode failures. Cur d-c power sources themselves. An example rent designs are therefore based on the concept would be a three diesel generator, three bus of independent, redundant load groups. In these system utilizing d-c control circuits. If only two designs, the standby power source for one load 5.1
d-c sources are provided, the switching of 4. When operating from the standby diesel generator control circuits between the d-c sources, redundant load groups and the sources becomes necessary in order to provide redundant standby sources should be the necessary redundancy. Again, a compatible independent of each other at least to the design such as one based on three d-c sources, following extent:
one for each generator, would not utilize a a. The standby source of one load swing bus. group should not be automatically A diesel generator that swings between the paralleled with the standby source load groups of different units at a multiple unit of another load group under acci site is not an example of the foregoing since dent conditions; such load groups are not redundant to each other. b. No provisions should exist for auto matically connecting one load group D. Regulatory Position to another load group;
- 1. The electrically powered safety loads c. No provisions should exist for auto (a-c and d-c) should be separated into matically transferring loads be redundant load groups such that loss of tween redundant power sources; any one group will not prevent the d. If means exist for manually con minimum safety functions from being necting redundant load groups tu performed. gether, at least one interlock should
- 2. Each a-c load group should have a con be provided to prevent an operator nection to the preferred (offsite) power error that would parallel their source and to a standby (onsite) power standby power sources.
source (usually a single diesel genera tor). The standby power source should 5. A single generator driven by a single have no automatic connection to any prime mover is acceptable as the other redundant load group. At mul standby power source for each a-c load tiple nuclear unit sites, the standby group of the size and characteristics power source for one load group may typical of recent applications. If other have an automatic connection to a load arrangements such as multiple diesel group of a different unit. A preferred generators operated in parallel or mul power source bus, however, may serve tiple prime movers driving a single redundant load groups. generator are proposed, the applicant
- 8. Each d-c load group should be energized should demonstrate that the proposed by a battery and battery charger. The arrangement has an equivalent reliabil battery-charger combination should ity. Common mode failures as well as have no automatic connection to any random single failures should be con other redundant d-c load group. sidered in the analysis.