July 5, 2000 Mr. Ralph E. Beedle Senior Vice President and Chief Nuclear Officer Nuclear Energy Institute 1776 I Street, NW Suite 400 Washington, D.C. 20006-3708

Dear Mr. Beedle:

Thank you for your letter to Mr. Collins and the letter from Ms. Hendricks to me, dated April 3, 2000 and May 17, 2000, respectively. Both letters were associated with industry input on improving power reactor decommissioning regulations, a current initiative undertaken by the NRC staff.

As you are aware, the NRC staff had recommended an initiative for improving power reactor decommissioning regulations to the Commission in SECY-99-168, dated June 30, 1999. The Commission in turn approved the initiative with some modifications, as outlined in the Staff Requirements Memorandum dated December 21, 1999. Since then, the NRC staff has been working on two initiatives. One is associated with a single, integrated risk-informed decommissioning rule and the other is associated with decommissioning regulatory improvements.

In your letter to Mr. Collins, you recommended combining the two initiatives mentioned above.

On May 9, 2000, the NRC staff met with members of your staff and public stakeholders to discuss this proposal. After the meeting, Ms. Hendricks, in Nuclear Energy Institutes May 17, 2000, letter recommended an approach to carry out the method you proposed. We plan to meet with your organization around the end of July to discuss the letter from Ms. Hendricks.

The NRC staff has reviewed this approach; however, since we were committed to have a rulemaking plan to the Commission by June 30, 2000, and because of the significant progress that has been made to date, specifically associated with the single, integrated risk-informed decommissioning rule, we plan to continue on the path outlined in the Staff Requirements Memorandum dated December 21, 1999. The NRC staff considers the current plan to be efficient and timely. If a plan similar to the one you proposed is eventually adopted, the NRC staff believes that all progress previously made would not have been wasted, since that same effort would likely be needed in any new plan.

The success of the effort to improve power reactor decommissioning regulations is due in part to the input received from stakeholders. Although the NRC staff plans to continue on the path outlined by the Commission, your input will certainly be considered while we continue with the single, integrated risk-informed decommissioning rule and the decommissioning regulatory improvements initiative.

R.E. Beedle If you have any questions, please do not hesitate to call. The NRC staff contact is Mr. David Wrona, who can be reached at (301) 415-1924, or djw1@nrc.gov.

Sincerely,

/RA/

John A. Zwolinski, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Project No. 689 cc: See next page

ML003728962

  • See previous concurrence To receive a copy of this document, indicate "C" in the box OFFICE PDIV-D/PM*

C PDIV-D/LA*

C DRIP/RGEB*

PDIV-D/SC*

PDIV/D*

NAME DWrona CJamerson JBirmingham MMasnik SRichards DATE 06/28/00 06/29/00 06/02/00 06/02/00 06/05/00 To receive a copy of this document, indicate "C" in the box OFFICE DLPM/D/sb NAME JZwolinski DATE 7/3/2000 mkm

February 2000 Nuclear Energy Institute Project No. 689/+Decom cc:

Mr. Alex Marion, Director Programs Nuclear Energy Institute 1776 I Street, Suite 400 Washington, DC 20006-3708 Mr. David Modeen, Director Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Mr. Anthony Pietrangelo, Director Licensing Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Mr. Jim Davis, Director Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Ms. Lynnette Hendricks, Director Plant Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Mr. H. A. Sepp, Manager Regulatory and Licensing Engineering Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 Mr. Charles B. Brinkman, Director Washington Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Mr. Michael Meisner Maine Yankee Atomic Power Co.

321 Old Ferry Road Wiscassett, ME 04578-4922 Mr. Paul Blanch Energy Consultant 135 Hyde Road West Hartford, CT 06117 New England Coalition on Nuclear Pollution P. O. Box 545 Brattleboro, VT 05302 Mr. Ray Shadis Friends of the Coast P. O. Box 98 Edgecomb, ME 04556 Mr. David Lochbaum Union of Concerned Scientists 1616 P St. NW, Suite 310 Washington, DC 20036 Mr. Paul Gunter Nuclear Information Resource Service 1424 16th St. NW, Suite 404 Washington, DC 20036 Mr. Peter James Atherton P.O. Box 2337 Washington, DC 20013 Mr. H. G. Brack Center for Biological Monitoring P.O. Box 144 Hulls Cove, ME 04644 Ms. Deborah B. Katz Citizens Awareness Network P. O. Box 3023 Charlemont, MA 01339-3023 Mr. Robert Holden National Congress of American Indians Suite 200 1301 Connecticut Ave, NW Washington DC, 20036