Limerick Emergency Response Procedure Rev
ML003691559
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/02/2000
From: Hutton J
PECO Energy Co
To:
NRC/OCIO/IMD/RMB
References
-RFPFR ERP-340 Rev 7
Download: ML003691559 (15)


Text

Station Support Department 10CFR50, Appendix E PECO ENERGY PECO Energy Company Nuclear Group Headquarters 965 Chesterbrook Boulevard Wayne, PA 19087-5691 March 2, 2000 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Limerick Generating Station, Units 1 & 2 Emergency Response Procedure Revision

Dear Sir/Madam:

Enclosed is the following procedure revision to the Emergency Response Procedures (ERPs) for Limerick Generating Station (LGS), Units 1 and 2. This procedure is required to be submitted within thirty (30) days of its revision in accordance with 10CFR50, Appendix E, and 10CFR50.4.

. ERP-340, Revision 7, "Field Survey Group" Also, enclosed is a copy of a computer generated report index identifying the latest revisions of the LGS ERPs.

If you have any questions or require additional information, please do not hesitate to contact us.

Very truly yours, James A. Hutton Director - Licensing Attachments cc: H. J. Miller, Administrator, Region I, USNRC (2 copies)

W. F. Kane, Director of Materials Safety & Safeguard, USNRC A. L. Burritt, USNRC Senior Resident Inspector, LGS (w/o enclosures)

Effective Date: S1!aZ ERP-340 Rev. 7 Page 1 of 12 MES/ldt PECO ENERGY COMPANY LIMERICK GENERATING STATION EMERGENCY RESPONSE PROCEDURE ERP-340 FIELD SURVEY GROUP 1.0 RESPONSIBILITIES 1.1 Dose Assessment Coordinator (DAC) directs actions of Field Survey Team Members per ERP-300 until relieved by EOF Field Survey Group Leader.

1.2 Field Survey Team (FST) Members conduct field surveys.

2.0 INITIAL ACTIONS 2.1 DAC performs initial dispatch of Field Survey Teams per ERP-300-3.

2.2 Field Survey Team Members shall:

2.2.1 Obtain key to Site Management Building and Equipment Storage Locker from HP Field Office or TSC key locker.

2.2.2 Keep all dosimetry upon leaving protected area.

2.2.3 Report to the Site Management Building.

2.2.4 Contact DAC by phone (ext. 2620) and provide:

2.2.4.1 Name (HP and Driver) 2.2.4.2 Social Security Number (HP and Driver) 2.2.4.3 Team color designation (by kit selected) 2.2.5 Obtain Emergency Equipment:

2.2.5.1 Field Survey Kit 2.2.5.2 Emergency Dosimetry 2.2.5.3 Radio Equipment

a. Hand held radio
b. Two batteries
c. Antenna
d. Cigarette Lighter Adapter

ERP-340, Rev. 7 Page 2 of 12 MES/ldt 2.2.6 IF seal on Field Survey Kit is broken THEN obtain a sealed kit OR perform inventory per G0000579.

2.2.7 Perform Step 1 of ERP-340-2.

2.2.8 Notify DAC of any equipment that did not function correctly or is missing.

NOTE: RELOCATE TO A MINIMUM OF 50 FEET FROM ANY SITE BUILDING PRIOR TO COMMUNICATION CHECK 2.2.9 Perform radio communication check with DAC.

NOTE: CHANNEL 1 IS USED TO COMMUNICATE WITH THE FIELD SURVEY GROUP LEADER, CHANNEL 2 IS USED TO COMMUNICATE WITH OTHER FIELD SURVEY TEAMS.

2.2.9.1 IF vehicle has installed radio THEN use installed radio as primary communications.

a. Switch radio on
b. Perform radio check 2.2.9.2 IF vehicle dose not have installed radio but DOES have cigarette lighter, THEN use portable radio with charger.
a. Locate radio charger in vehicle
b. Plug charger into cigarette lighter
c. Put radio into charger face down
d. Place magnetic-based antenna on roof
e. Perform check using charger speaker and microphone 2.2.9.3 IF vehicle does not have an installed radio OR cigarette lighter, THEN use portable radio only.
a. Switch radio on
b. Adjust Squelch
c. Perform radio check 2.2.10 Ensure E-520/HP-270 or equivalent is operating at all times.

2.2.11 Proceed to initial location as directed.

ERP-340, Rev. 7 Page 3 of 12 MES/ldt 3.0 CONTINUING ACTIONS NOTE: SECTION 3.1 IS TO BE PERFORMED ONLY IN THE EVENT THAT EOF DOSE ASSESSMENT IS NOT STAFFED TO PERFORM THESE FIELD SURVEY GROUP LEADER FUNCTIONS.

3.1 DAC shall:

3.1.1 Direct activities of the field survey teams.

3.1.1.1 Maintain communications with field survey teams 3.1.1.2 Record data on Appendix ERP-340-1 3.1.1.3 Provide status updates to the Field Survey Teams NOTE: DRD READING X PROJECTED DOSE RATIO EQUALS ESTIMATED TEDE 3.1.1.4 Keep FST informed of projected dose ratio AND assist FST in using ratio to estimate TEDE dose.

3.1.2 Inform DATL of results from field surveys, particularly where:

3.1.2.1 Actual readings differ significantly from expected (projected) values.

3.1.2.2 Field dose rate equals or exceeds 250 mrem/hr.

3.1.2.3 Field radioiodine concentration equals or exceeds 6.5 X 10 N7 uCi/cc.

3.1.3 IF field radioiodine concentration exceeds 2 X 10 N8 uCi/cc THEN initiate team member DAC-hr tracking.

3.1.4 IF informed by FST that team MPC-hr exceeds 850 DAC hrs OR dose projections indicated that team MPC-hr may reach 950 DAC-hr THEN arrange for relief team dispatch OR initiate process for KI administration per ERP-600.

ERP-340, Rev. 7 Page 4 of 12 MES/ldt 3.1.5 IF informed by FST that team dose exceeds 75% of authorized level THEN arrange for relief field team dispatch OR initiate dose extension per ERP-650.

3.1.6 WHEN scan results of field air sample is available THEN calculate efficiency factor using the following equation AND transmit to teams.

Eff Factor = Estimated Concentration Actual Concentration 3.1.7 IF Field Survey Team members or vehicles become contaminated, THEN inform the Health Physics Team Leader.

3.1.8 WHEN directed by DATL THEN turnover FSGL duties to EOF FSGL using Appendix ERP-300-3.

3.2 Field Survey Team Members shall:

WARNING ALWAYS FOLLOW PECO ENERGY VEHICLE AND PERSONNEL SAFETY TECHNIQUES.

3.2.1 At each survey location:

3.2.1.1 Perform airborne, radiation and contamination survey, per ERP-340-2 step 2, unless directed otherwise by FSGL.

NOTE SURVEY NUMBER INCLUDES BOTH LETTER AND NUMBER.

LETTER IS DETERMINED BY TEAM DESIGNATED COLOR, NUMBER IS SEQUENTIAL BY TEAM. EXAMPLE-SURVEY G-3 WOULD BE THE 3RD SURVEY PERFORMED BY THE GREEN TEAM.

3.2.1.2 Enter survey data on Field Survey Data Sheet, Appendix ERP-340-3.

3.2.1.3 Unless directed otherwise by FSGL proceed to a Low Background Area.

ERP-340, Rev. 7 Page 5 of 12 MES/1dt 3.2.2 While enroute to Low Background Area, transmit Data Items #1 through 5 from Field Survey Data Sheet Appendix ERP-340-3.

3.2.2.1 IF unable to contact FSGL by radio THEN:

a. Switch to Channel 2 and attempt a communications relay with another team
b. Telephone TSC at (610) 326-9860 OR EOF at (610) 380-3847 or 3848.

3.2.3 Upon arrival at Low Background Area:

NOTE THE AIR SAMPLE CALCULATIONS USED IN APPENDIX ERP-340-3, FIELD SURVEY DATA SHEET USE THE METHODOLOGY DESCRIBED IN HP-204.

3.2.3.1 Remove and count filter per HP-C-214.

3.2.3.2 Run air sampler for one minute with silver zeolite cartridge in place to purge cartridge of noble gases.

3.2.4 Field count smears per HP-C-211.

3.2.5 Field count iodine cartridge per HP-204.

3.2.6 Complete Field Survey Data Sheet.

3.2.7 Transmit Data Items #6 and 7 to Field Survey Group Leader.

3.2.8 Perform additional surveys as directed.

4.0 FINAL CONDITIONS 4.1 Survey all personnel and vehicles for radioactive contamination before returning to site.

4.2 Deliver all samples to Chemistry Group at R/W-217 OR as directed.

4.3 Deliver data sheets to DAC.

4.4 Inventory Field Survey Kit AND report results to Health Physics Team Leader in the TSC.

ERP-340, Rev. 7 Page 6 of 12 MES/ldt 5.0 APPENDICES 5.1 ERP-340-1, Field Survey Group Leader Data Sheet 5.2 ERP-340-2, Field Survey Team Member Checklist 5.3 ERP-340-3, Field Survey Data Sheet 6.0 SUPPORTING INFORMATION 6.1 Purpose 6.1.1 To provide guidelines for actions of Field Survey Group.

6.2 Criteria for Use 6.2.1 Field Survey Group shall be activated at Alert level or as determined by The Emergency Director.

6.3 Special Eguipment 6.3.1 Radio with battery packs and charger 6.3.2 Field survey kits 6.3.3 Vehicle 6.3.4 Emergency Dosimetry 6.4 References 6.4.1 HP-204 6.4.2 HP-C-214 6.4.3 Letter #JGF-89-11 6.4.4 Manual of Protective Actions for Nuclear Incidents (EPA 520-1-75-001-A January 1990) 6.4.5 NUREG/CR-3011 Dose Projection Considerations for Emergency Conditions at Nuclear Power Plant 6.4.6 HP-C-211 6.4.7 ERP-600 6.4.8 ERP-300 6.4.9 ERP-650

ERP-340, Rev. 7 Page 7 of 12 MES/1dt 6.4.10 G0000579 6.4.11 EPA400-R-92-001, Oct. 1991, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents.

6.5 Commitment Annotation 6.5.1 A.I Q0001944 6.5.2 OEAP A0370948-AE02 (Entire Procedure)

ERP-340, Rev. 7 Page 8 of 12 MES/ldt APPENDIX ERP-340-1 DATE FSGL FIELD SURVEY GROUP LEADER DATA SHEET DATA SURVEY NUMBER NUMBER 1

1 SURVEY LOCATION 2 TIME OF SURVEY 3 OPEN WINDOW mR/hr 4 CLOSED WINDOW 5*

GROSS SMEAR (cpm) 6 MASSLIN 6

IODINE CONCENTRATION 7*

jC i/cc DOSE RATIO

  • IF CLOSED WINDOW(#5) >250 OR IODINE CONCENTRATION(#7) >6.5 x 10N7, NOTIFY DOSE ASSESSMENT COORDINATOR IMMEDIATELY I

ERP-340, Rev. 7 Page 9 of 12 MES/ldt APPENDIX ERP-340-2 FIELD SURVEY TEAM MEMBER CHECK LIST (PAGE 1 of 2)

1. BEFORE LEAVING SITE INSTRUMENT INVENTORY INSTRUMENT SERIAL CALIBRATI BATTERY RESPONSE CHECK-OFF TYPE NUMBER ON DUE CHECK CHECK RO-2A ...... " .

E-520 E-140N HP210T Radeco H 890C N/A A) All Equipment accounted for and operable B) Ensure all team members have Emergency Dosimetry and it is zeroed (0-1500mR and 0 5R DRD's)

C) Notified DAC by phone X2620 D) Radio communication check performed

1) Kit color designation

_ team E) Have been briefed on situation, etc.

F) E520/HP270 is ON

2. INSTRUCTIONS AT SURVEY LOCATION AND WHILE IN TRANSIT A) Performed radiation survey while in transit to specified survey location B) Notified DAC or FSGL at EOF of arrival and dose rate encountered C) Start air sample
1) Particulate filter and silver zeolite cartridge marked to indicate direction of air flow
2) Flow Rate observed and recorded not to exceed 3 SCFM
3) 10 cubic feet minimum volume D) Performed open/closed waist level survey using E-520/HP-270

ERP-340, Rev. 7 Page 10 of 12 MES/ldt E) Perform gross masslin smear survey F) Move to low background area G) Transmit data points 1-5 from ERP-340-3

3. AT LOW BACKGROUND COUNTING AREA A) Remove and count particulate filter B) Count Smear(s)

C) Perform purge of silver zeolite cartridge D) Calculate 1-131 Concentration E) Transmit data points 6 and 7 from ERP-340-3 F) Calculate DAC-hr G) Complete Field Survey Data Sheet H) When advised to return, monitor self, driver and vehicle for contamination and relay findings to FSGL I) All samples turned over to Chemistry Group at Chemistry Control Point in Radwaste Enclosure J) Turn over all completed forms to DAC for subsequent disposition.

ERP-340, Rev. 7 Page 11 of 12 MES/Idt APPENDIX ERP-340-3 FIELD SURVEY DATA SHEET (PAGE 1 of 2)

READ NUMBERED DATA TO FSGL/DAC W/O UNITS UNLESS DIRECTED OTHERWISE SURVEY NUMBER (#1) SURVEY LOCATION (#2)

AIRBORNE SURVEY DATA SURVEY TIME (#3) Time Off Duration (Time Off Survey Time)

Initial Flow Rate cfm +Final Flow Rate cfm = /2=Avg Flow Rate cfm Retention Factor (RF)=(20-Avg Flow Rate) Volume (Duration x Avg Flow Rate)

RADIATION SURVEY DATA (WAIST HIGH)

OPEN WINDOW mR/hr (#4) CLOSED WINDOW mR/hr

(#5)

CONTAMINATION SURVEY DATA GROSS SMEARS (MASSLIN)

LOCATION net cpm (#6)

LOCATION net cpm (#6)

AIRBORNE SURVEY CALCULATIONS Gross cpm Filter net cpm Filter Gross cpm Cartridge net cpm Cartridge ESTIMATE RADIOIODINE CONCENTRATION & MPC FRACTION Eff Factor = 1 unless FSGL notifies otherwise IODINE CONCENTRATION uCi/cc = Net cpm Cartridge = (#7)

(7.86 X 10-)(Volume)(RF)(Eff Factor)

DAC FRCTION = Estimated Radioiodine Concentration =

DAC 1-131 2.0 x 10N8 (Ref 6.5.1)

ERP-340, Rev. 7 Page 12 of 12 MES/ldt APPENDIX ERP-340-3 FIELD SURVEY DATA SHEET (PAGE 2 of 2)

(IF REQUESTED BY FSGL/DAC)

TEAM DOSE AND DAC-HR ESTIMATION Estimate time in plume(hr) __ x DAC Fraction = Current DAC - hr Previous DAC-hr + Current DAC-hr = Team DAC-hr IF TEAM DAAC-HR EXCEEDS 850, NOTIFY FSGL IMMEDIATELY Completed by:

Date:

oHP TECH DRIVER

1. Prev . Est. TEDE
2. Prev. DRD Rdng.
3. Current DRD Rdng.
4. Current Est. Proj. Dose Ratio IF TOTAL DOSE EXCEEDS 75% OF CURRENT AUTHORIZED LEVEL, NOTIFY FSGL IMMEDIATELY HP TECH Current HP DRD Reading (3) _ - Prey. HP DRD Reading (2) = Current HP Exp.

Current HP Exp _ x Current Est. Dose Ratio (4) = Current HP TEDE Prey. HP TEDE (1) + Current HP TEDE_= total TEDE I&C TECH Current Driver DRD Rdng (3) - Prev. Driver DRD Rdng (2) =Current Driver Exp._

Current Driver Exp__ x Current Est. Dose Ratio (4) = Current Driver TEDE Previous Driver TEDE (1) + Current Driver TEDE = Total TEDE

3/02/2000 PECO ENERGY COMPANY PAGE 1 LIMERICK GENERATING STATION PROCEDURE INDEX REPORT:

CURR DOC PROC REV FAC TYPE TYPE PROCEDURE NUMBER EFFECTIVE RESP SYSTEM NBR TITLE DATE GROUP NBR LG PROC ERR ERP-C-1000 0005 EMERGENCY OPERATIONS FACILITY (EOF) ACTIVATION/DEACTIVATION 04/21/99 LG PROC ERP ERP-C-1000-1 0002 EOF ACTIVATION CHECKLIST LG PROC ERP ERP-C-1000-2 04/21/99 0003 EOF DEACTIVATION CHECKLIST LG PROC ERP ERP-C-1000-3 04/21/99 0000 EOF BUSINESS HOURS FIRST RESPONDER CHECKLIST LG PROC ERP ERP-C-1000-4 04/21/99 0000 EOF AFTER HOURS FIRST RESPONDER CHECKLIST LG PROC ERP ERP-C-1100 04/21/99 0003 EOF STAFF AUGMENTATION 09/14/94 INCORPORATED INTO ERP-C-1250 LG PROC ERP ERP-C-1200 0008 EMERGENCY REPSONSE MANAGER LG PROC ERP ERP-C-1200-1 11/02/98 LWE 0000 EMERGENCY RESPONSE MANAGER TURNOVER/BRIEFING FORM LG PROC ERP ERP-C-1200-2 09/14/94 0000 PROTECTIVE ACTION RECOMMENDATION WORKSHEET 10/24/95 CANCELLED LG PROC ERP ERP-C-1210 0002 ASSISTANT EMERGENCY RESPONSE MANAGER (AERM) 10/24/95 CANCELLED LG PROC ERP ERP-C-1250 0003 EMERGENCY PREPAREDNESS COORDINATOR/EOF LG PROC ERP ERP-C-1250-1 11/02/98 0000 EMERGENCY POWER INSTRUCTIONS LG PROC ERP ERP-C-1250-2 09/14/94 0001 EMERGENCY PREPAREDNESS COORDINATOR INSTRUCTIONS FOR ASPEN 04/02/98 BACKUP NOTIFICATION SYSTEM LG PROC ERP ERP-C-1250-3 0000 EMERGENCY PREPAREDNESS COORDINATOR INSTRUCTIONS TO STOP 09/14/94 STAFFING LG PROC ERP ERP-C-1250-4 0000 ENERGENCY PREPAREDNESS COORDINATOR INSTRUCTIONS FOR SYSTEM 09/14/94 RESET LG PROC ERP ERP-C-1300 0008 EMERGENCY OPERATIONS FACILITY (EOF) DOSE ASSESSMENT TEAM LEADER 11/02/98 LG PROC ERP ERP-C-1300-1 0002 DOSE ASSESSMENT TEAM LEADER INITIAL ACTIONS LG PROC ERP ERP-C-1300-2 04/10/98 0000 DOSE ASSESSMENT TURNOVER LIST LG PROC ERP ERP-C-1300-3 09/23/94 0003 PROTECTIVE ACTION RECOMMENDATION WORKSHEET LG PROC ERP ERP-C-1300-4 11/02/98 0000 OFFSITE SAMPLE ANALYSIS REQUESTS LG PROC ERP ERP-C-1300-5 09/23/94 0001 DETERMINATION OF PROTECTIVE ACTION 11/02/98 RECOMMENDATIONS (PARS)

LG PROC ERP ERP-C-1300-6 0001 DOSE ASSESSMENT GROUP INITIAL ACTIONS LG PROC ERP ERP-C-1300-7 04/10/98 0000 OBTAINING EPDS MET/RAD DATA LG PROC ERP ERP-C-1300-8 03/26/97 0000 USE OF MODE A/MODE B CDM LG PROC ERP ERP-C-1300-9 03/26/97 0001 OBTAINING MET DATA FROM NATIONAL WEATHER SERVICE LG PROC ERP ERP-C-1310 09/12/97 0003 EMERGENCY OPERATIONS FACILITY (EOF) DOSE ASSESSMENT GROUP 03/26/97 CANCELLED LG PROC ERP ERP-C-1310-1 0000 DOSE ASSESSMENT GROUP LEADER INITIAL ACTIONS 03/26/97 CANCELLED LG PROC ERP ERP-C-1310-2 0000 OBTAINING MET DATA FROM NATIONAL WEATHER SERVICE 03/26/97 CANCELLED LG PROC ERP ERP-C-1310-3 0000 OBTAINING EPDS MET/RAD DATA 03/26/97 CANCELLED LG PROC ERP ERP-C-1310-4 0000 USE OF MODE A / MODE B OF CDM 03/26/97 CANCELLED LG PROC ERP ERP-C-1320 0005 EMERGENCY OPERATIONS FACILITY (EOF) FIELD SURVEY GROUP LEADER 04/10/98 LG PROC ERP ERP-C-1320-1 0002 FIELD SURVEY GROUP LEADER INITIAL ACTIONS LG PROC ERP ERP-C-1320-2 04/10/98 0001 FIELD SURVEY GROUP LEADER TURNOVER SHEET LG PROC ERP ERP-C-1320-3 03/26/97 0000 FIELD SURVEY GROUP LEADER DATA SHEET LG PROC ERP ERP-C-1400 09/23/94 0004 ENGINEERING SUPPORT TEAM LG PROC ERP ERP-C-1400-1 11/02/98 0002 ENGINEERING SUPPORT TEAM CHECKLIST LG PROC ERP ERP-C-1410 11/02/98 0002 CORE DAMAGE ASSESSMENT LG PROC ERP ERP-C-1410-1 09/09/98 0000 RADIOLOGICAL DATA 09/14/94

3/o2/2QOO PECO ENERGY COMPANY PAGE 2 LIMERICK GENERATING STATION PROCEDURE INDEX REPORT:

CURR DOC PROC REV FAC TYPE TYPE EFFECTIVE RESP SYSTEM PROCEDURE NUMBER NBR TITLE DATE GROUP NBR LG PROC ERP ERP-C-1410-2 0001 HYDROGEN CONCENTRATION DATA LG PROC ERP ERP-C-1410-3 09/09/98 0001 CONTAINMENT RADIATION MONITOR DATA 09/09/98 LG PROC ERP ERP-C-1410-4 0000 METAL WATER REACTION 09/09/98 CANCELLED LG PROC ERP ERP-C-1410-5 0001 PERCENT OF FUEL INVENTORY AIRBORNE IN THE CONTAINMENT VS. 09/09/98 APPROXIMATE SOURCE AND DAMAGE ESTIMATE LG PROC ERP ERP-C-1410-6 0001 PROCEDURES FOR ESTIMATING FUEL DAMAGE BASED ON MEASURED 09/09/98 1-131 AND XE-133 CONCENTRATIONS LG PROC ERP ERP-C-1500 0005 LOGISTIC SUPPORT TEAM LG PROC ERP ERP-C-1500-1 04/02/98 0001 MESSAGE AND INFORMATION INSTRUCTIONS 10/24/95 LG PROC ERP ERP-C-1500-2 0001 HELICOPTER LANDING INFORMATION LG PROC ERP 10/24/95 ERP-C-1900 0004 RECOVERY PHASE IMPLEMENTATION LG PROC ERP ERP-C-1900-1 11/02/98 0000 RECOVERY PHASE IMPLEMENTATION FLOW CHART 06/28/93 LG PROC ERP ERP-C-1900-2 0002 PEACH BOTTOM ATOMIC POWER STATION RECOVERY ACCEPTANCE CHECKLIST LG PROC ERP ERP-C-1900-3 04/02/98 0002 LIMERICK GENERATING STATION RECOVERY ACCEPTANCE CHECKLIST 04/02/98 LG PROC ERP ERP-C-1900-4 0002 RECOVERY PLAN OUTLINE LG PROC ERP ERP-C-1900-5 04/02/98 0002 ASSESSMENT CONSIDERATIONS 12/28/99 LG PROC ERP ERP-101 0011 CLASSIFICATION OF EMERGENCIES LG PROC ERP ERP-1O1 BASES 09/14/99 LWE 0000 LGS EAL TECHNICAL BASIS MANUAL LG PROC ERP ERP-106 09/16/99 0003 WRITTEN

SUMMARY

NOTIFICATION 11/22/95 LG PROC ERP ERP-110 LWE 0030 EMERGENCY NOTIFICATION 11/04/99 LG PROC ERP ERP-120 LWE 0006 STATION EVACUATIONS 11/14/97 LG PROC ERP ERP-140 LWE 0009 STAFFING AUGMENTATION 02/03/98 LG PROC ERP ERP-200 LWE 0012 EMERGENCY DIRECTOR (ED) RESPONSE LG PROC ERP ERP-200-1 APP 10/05/98 LWE 0010 EMERGENCY NOTIFICATION MESSAGE FORM LG PROC ERP ERP-230 10/05/98 LWE 0013 OPERATIONS SUPPORT CENTER (OSC) DIRECTOR 05/14/99 LG PROC ERP ERP-300 LWE 0021 TSC/MCR DOSE ASSESSMENT TEAM LG PROC ERP ERP-330 10/18/99 LWE 0000 USE OF NORTH STACK-DOSE RATE TO ESTIMATE RELEASE SOURCE TERM 11/14/94 LWE CANCELLED INCORPORATED INTOERP-300 APP.1O LG PROC ERP ERP-340 0007 FIELD SURVEY GROUP LG PROC ERP ERP-350 03/01/00 LWE 0003 RADIOACTIVE LIQUID RELEASE 11/10/94 LWE CANCELLED LG PROC ERP ERP-360 0003 ADJUSTMENT OF WIDE RANGE GAS MONITOR CONVERSION FACTORS LG PROC ERP ERP-370 10/18/99 LWE 0001 USE OF RMMS FOR DOSE ASSESSMENT 11/10/94 LWE LG ERP-400 CANCELLED PROC ERP 0012 CHEMISTRY SAMPLING AND ANALYSIS TEAM LG PROC ERP ERP-410 09/28/98 LWE 0002 SAMPLE PREPARATION AND HANDLING OF HIGHLY RADIOACTIVE LIQUID 09/28/98 LWE SAMPLES LG PROC ERP ERP-420 0002 SAMPLE PREPARATION AND HANDLING OF HIGHLY RADIOACTIVE 09/28/98 LWE PARTICULATE FILTERS AND IODINE CARTRIDGES LG PROC ERP ERP-430 0002 SAMPLE PREPARATION AND HANDLING OF HIGHLY RADIOACTIVE GAS 09/28/98 LWE SAMPLES LG PROC ERP ERP-440 0002 OFF-SITE ANALYSIS OF HIGH ACTIVITY SAMPLES LG PROC ERP ERP-500 03/29/95 LWE 0015 SECURITY TEAM 09/24/97 LG PROC ERP ERP-600 LWE 0012 HEALTH PHYSICS TEAM 05/19/98 LG PROC ERP ERP-620 LWE 0002 PLANT SURVEY GROUP 05/02/95 LWE CANCELLED - NO REPLACEMENT LG PROC ERP ERP-630 0003 VEHICLE AND EVACUEE CONTROL GROUP LG PROC ERP ERP-640 03/29/95 LWE 0008 EMERGENCY RESPONSE FACILITY HABITABILITY 04/17/99 LG PROC ERP ERP-650 LWE 0009 ENTRY FOR EMERGENCY REPAIR AND OPERATIONS 04/17/99 LWE

3/02/2Ž0O PECO ENERGY COMPANY PAGE 3 LIMERICK GENERATING STATION PROCEDURE INDEX REPORT:

CURR DOC PROC REV EFFECTIVE RESP SYSTEM FAC TYPE TYPE PROCEDURE NUMBER NBR TITLE DATE GROUP NBR LG PROC ERP ERP-660 0006 DISTRIBUTION OF THYROID BLOCKING TABLETS 04/17/99 LWE LG PROC ERP ERP-700 0014 TECHNICAL SUPPORT TEAM LG 10/05/98 LWE PROC ERP ERP-800 0018 MAINTENANCE TEAM 09/14/99 LWE

    • END OF REPORT **