January 3, 2000 Mr. J. V. Parrish Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (RAI) FOR WNP-2, (TAC NO.
MA7228)
Dear Mr. Parrish:
By letter dated November 18, 1999, Energy Northwest submitted for staff review an amendment request to revise Subsection 4.3.1.2.b of Technical Specification 4.3.1, "Criticality," to reflect the increased fuel spacing requirements in the new fuel storage vault at WNP-2. As a result of the review, the staff has determined that additional information is needed to complete the review.
The information needed is detailed in the enclosure.
The enclosed request was discussed with Mr. Inserra of your staff on December 20, 1999. A mutually agreeable target date of January 30, 2000, was established for responding to the RAI.
If circumstances result in the need to revise the target date, please call me at your earliest opportunity at (301) 415-1424.
Sincerely,
\\RA\\
Jack Cushing, Project Manager, Section 2 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosure:
Request for Additional Information cc w/encl: See next page
January 3, 2000 Mr. J. V. Parrish Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (RAI) FOR WNP-2, (TAC NO.
MA7228)
Dear Mr. Parrish:
By letter dated November 18, 1999, Energy Northwest submitted for staff review an amendment request to revise Subsection 4.3.1.2.b of Technical Specification 4.3.1, "Criticality," to reflect the increased fuel spacing requirements in the new fuel storage vault at WNP-2. As a result of the review, the staff has determined that additional information is needed to complete the review.
The information needed is detailed in the enclosure.
The enclosed request was discussed with Mr. Inserra of your staff on December 20, 1999. A mutually agreeable target date of January 30, 2000, was established for responding to the RAI.
If circumstances result in the need to revise the target date, please call me at your earliest opportunity at (301) 415-1424.
Sincerely,
\\RA\\
Jack Cushing, Project Manager, Section 2 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosure:
Request for Additional Information cc w/encl: See next page DISTRIBUTION:
File Center AAttard PUBLIC OGC PDIV-2 Reading ACRS SBlack RPichumani SRichards LSmith, RGN-IV LBerry To receive a copy of this document, indicate "C" in the box OFFICE PDIV-2/PM C PDIV-2/LA C PDIV-2/SC NAME JCushing EPeyton SDembek DATE 1 / 3/00 12 / 30 /99 1 /3 /00 DOCUMENT NAME:G:PDIV-2/WNP2/RAI7228.WPD OFFICIAL RECORD COPY
REQUEST FOR ADDITIONAL INFORMATION FUEL STORAGE WNP-2 DOCKET NO. 50-397 1.
Discuss briefly the types of analyses (including any seismic dynamic analysis) performed to determine the structural integrity of the various elements affected by the new geometrical limitations for storage of new fuel assemblies in the new fuel racks. This discussion should include the analyses related to the accidental drop of fuel assemblies on the vault floor and on the racks, including the accidental drop of the fuel assemblies being supported by the pedestal.
2.
Provide a summary of the results of the above analyses and confirm that the (strength) capacities of the various structural elements (e.g., the pedestal, vault floor, rack walls, cover plates, etc.) are adequate to satisfy the demands imposed on them by the new configuration of the fuel assemblies as per the applicable industry codes.
3.
Provide report CE NPSD-787-P, "WNP-2 SVEA-96, Fuel Assemblies Dry Fuel Storage Criticality Safety Evaluation."
Enclosure