M180020, (Vnc) Organization Change

From kanterella
Jump to navigation Jump to search
(Vnc) Organization Change
ML18024A226
Person / Time
Site: Vallecitos Nuclear Center
Issue date: 01/24/2018
From: Murray S
GE-Hitachi Nuclear Energy Americas
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
M180020
Download: ML18024A226 (1)


Text

  • HITACHI GE Hitachi Nuclear Energy Scott P. Murray Manager, Facility Li censing 3901 Castle Hayne Road P.O. Box 780 Wilmin gton, NC 28402 USA M180020 T (910) 819-5950 Scott.murray @ge .com January 24, 2018 US Nuclear Regulatory Commission Attn: Document Control Desk Director, Office of Nuclear Reactor Regulation Director, Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001

Subject:

Vallecitos Nuclear Center (VNC) Organization Change

References:

1- License R-33, Docket 50-73 (NTR) 2- License TR-1, Docket 50-70 (G ETR) 3- License DR-1 0, Docket 50-183 (EVESR) 4- License DPR-1, Docket 50-18 (VBWR) 5- SNM 960, Docket 70-754 6- SNM 1270, Docket 70-1220 Pursuant to the Technical Specifications requirements of Reference 1, this 30-day report is being provided regarding a personnel change for the VNC Manager Regulatory Compliance position.

Specifically, License R-33 Docket 50-73 Technical Specification (6.6.2.b) requires a written report to the NRC within 30 days following permanent changes in the facility organization involving Level 2 or Level 3 management.

Effective December 27, 2017 Mr. Juan Ayala was appointed as the acting VNC Manager Regulatory Compliance forGE-Hitachi Nuclear Energy Americas, LLC replacing Mr. Mark Leik.

Mr. Ayala is a US Citizen and can be reached at 925-918-6058.

References 2 through 6 do not contain specific reporting requirements of this nature, but are listed here for completeness.

If you have any questions regarding this change , please contact me at 910-819-5950.

P~l~.

Scott Murray, Facility Licensi~~r Commitments: None cc: Jack Parrott- NRC, NMSS Project Manager Duane Hardesty- NRC, NRR Project Manager Osiris Siurano- NRC, NMSS Project Manager SPM 18-004