David Sharbaugh Site Vice President - Salem Generating Station - PSEG Nuclear PO Box 236 Hancocks Bridge, New Jersey 08038-0221 David.Sharbaugh@PSEG.com 10 CFR 50.90 LR-N25-0091 LAR S24-02 November 19, 2025 US Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 Salem Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311 Subject :
Supplement 2 to License Amendment Request to Adopt TSTF-505 and TSTF-591
References:
- 1. PSEG letter to NRC, License Amendment Request - Revise Salem Generating Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b and TSTF-591-A, Revision 0, Revise the Risk Informed Completion Time (RICT) Program, dated January 31, 2025 (ADAMS Accession No. ML25031A416) 2.
PSEG letter to NRC, Supplement to License Amendment Requests to Adopt TSTF-505, TSTF-591, and 10 CFR 50.69, dated October 10, 2025 (ADAMS Accession No. ML25283A069) 3.
NRC letter to PSEG, Issuance of Amendment Re: One-Time On-Line Battery Replacement, dated September 1, 2010 (ADAMS Accession No. ML102150499)
In accordance with 10 CFR 50.90, PSEG Nuclear LLC (PSEG) submitted, in Reference 1, a request for an amendment to the Technical Specifications (TS) for Salem Generating Station (Salem) Units 1 and 2. The request was to adopt the provisions of Technical Specifications Task Force (TSTF) Travelers TSTF-505, Revision 2, and TSTF-591, Revision 0, for Salem. PSEG provided a supplement to this application in Reference 2.
During ongoing preparations for implementation of the Risk Informed Completion Time Program at Salem, PSEG identified one additional administrative change on a previously submitted TS page that should have been included in the TS markups provided in Reference 1. Specifically, Unit 2, TS page 3/4 8-10 contains a footnote that was added in Amendment 280 (Reference 3).
LR-N25-0091 10 CFR 50.90 LAR S24-02 Page 2 The footnote supported on-line replacement of 125 VDC Battery 2C, which was only approved on a one-time basis. The footnote expired upon completion of the replacement activity in 2010 and should be removed from the TS with this amendment. This additional change is an administrative variation from TSTF-505/TSTF-591 and does not impact the applicability of the travelers to the Salem TS.
The Attachment to this letter provides a revised Unit 2 TS markup page 3/4 8-10. The revised TS markup page supersedes the Unit 2 TS markup page 3/4 8-10 previously provided in.2 to Reference 1. All other markups provided in Reference 1, as superseded by Reference 2, are unaffected. Additionally, no TS Bases changes are required as the result of deleting this footnote.
PSEG has determined the information provided in this supplement does not alter the conclusions reached in the 10 CFR 50.92 no significant hazards determinations previously submitted in Reference 1. Additionally, the information provided herein does not affect the basis for concluding that neither an environmental impact statement nor an environmental assessment need be prepared in connection with the proposed amendments.
In accordance with 10 CFR 50.91(b)(1), a copy of this supplement is being provided to the designated State of New Jersey official.
There are no new or revised regulatory commitments contained in this letter.
If there are any questions or if additional information is needed, please contact Mr. Shane Jurek at Shane.Jurek@pseg.com.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on: November 19, 2025 David Sharbaugh Site Vice President - Salem Generating Station PSEG Nuclear
Attachment:
Revised Technical Specification Markups cc:
Administrator, Region 1, NRC NRC Project Manager, Salem NRC Senior Resident Inspector, Salem Manager, New Jersey Bureau of Nuclear Engineering PSEG Commitment Tracking Coordinator Digitally signed by Sharbaugh, David L Date: 2025.11.19 11:08:10 -05'00'
Attachment LAR S24-02 LR-N25-0091 Attachment Revised Marked-Up Technical Specification Pages The following page for Renewed Facility Operating License DPR-75 is revised in this submittal:
TS Page 3.8.2.3 3/4 8-10
Insert 1 Insert 1 ELECTRICAL POWER SYSTEMS 125-VOL T D.C. DISTRIBUTION - OPERA TING LIMITING CONDITION FOR OPERATION 3.8.2.3 The following D.C. bus trains shall be OPERABLE and energized:
TRAIN 2A consisting of 125-vott D.C. bus No. 2A, 125-volt D.C. battery No. 2A and battery charger 2A 1.
TRAIN 28 consisting of 125-volt D.C. bus No. 2B, 125-volt D.C. battery No. 2B and battery charger 281, T RAIN 2C consisting of 125-volt D.C. bus No. 2C. 125-volt D.C. battery No. 2C* and battery charger 2C 1.
APPLICABILITY:
MODES 1. 2, 3 and 4.
ACTION;
- a.
With one 125-volt D.C. bus inoperable or not ener i
, restore the inoperable bus to OPERABLE and energized status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN withfn the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- b.
With one 125-volt D.C. battery char er ino er e inoperable charger to OPERABLE status Within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> onnecl the backup charger for no more than 7 days or be in at least HOT STANDBY within the next 6, hours and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- c.
With one or more 125-volt D.C. batteries with one or more battery cell parameters not within the Category A or B limits of Table 4.8.2.3-1 :
- 1.
Verify within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, that the electrolyte level and float voltage for the pilot cell meets Table 4.8.2.3-1 Category C limits, and
- 2.
Verify within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, that the battery cell parameters of all connected cells meet Table 4.8.2.3-1 Category C limits, and
- 3.
Restore battery cell parameters to Category A and B limits of Table 4.8.2.3-1 within 31 days, and
- 4.
If any of the above listed requirements cannot be met, comply with the requirements of action f.
- d.
With one or more 125-volt D.C. batteries with one or more battery cell parameters not within Table 4.8.2.3-1 Category C values, comply with the requirements of action f.
- e.
With average electrolyte temperature of representative cells less than 65°F, comply with the requirements of action f.
- f.
Restore the batlery to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
During the one-time on-Hne replacement of station battery 2C, this LCO can be satisfied by a temporary battery as described in PSEG LAR submittal dated March 29, 2010.
SALEM - UNIT 2 3/4 8-10 Amendment No. ~