LR-N16-0151, Spent Fuel Cask Registration
ML16223A239 | |
Person / Time | |
---|---|
Site: | Salem, Holtec |
Issue date: | 08/10/2016 |
From: | Mallon J Public Service Enterprise Group |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
References | |
LR-N16-0151 | |
Download: ML16223A239 (2) | |
Category:Letter type:LR
MONTHYEARLR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024
[Table view]Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion LR-N23-0072, Core Operating Limits Report – Cycle 302023-11-0101 November 2023 Core Operating Limits Report – Cycle 30 LR-N23-0045, And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0033, Core Operating Limits Report – Cycle 272023-04-26026 April 2023 Core Operating Limits Report – Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N23-0016, And Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 And Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 LR-N22-0096, And Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 And Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0095, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 20222022-12-20020 December 2022 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2022 LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0092, Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG2022-12-0909 December 2022 Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N22-0084, Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095)2022-11-17017 November 2022 Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) LR-N22-0090, Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2022-11-10010 November 2022 Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem LR-N22-0065, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2022-09-27027 September 2022 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations LR-N22-0074, Emergency Plan Evacuation Time Estimate2022-09-15015 September 2022 Emergency Plan Evacuation Time Estimate LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM)2022-08-31031 August 2022 License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) LR-N22-0063, Spent Fuel Cask Registration2022-08-10010 August 2022 Spent Fuel Cask Registration LR-N22-0068, In-Service Inspection Activities - 90-Day Report2022-08-10010 August 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N22-0062, Spent Fuel Cask Registration2022-07-21021 July 2022 Spent Fuel Cask Registration LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report LR-N22-0044, Emergency Plan Document Revisions Implemented November, 20212022-05-19019 May 2022 Emergency Plan Document Revisions Implemented November, 2021 LR-N22-0043, Core Operating Limits Report - Cycle 292022-05-0909 May 2022 Core Operating Limits Report - Cycle 29 2024-07-24 Category:License-Application for Dry Cask ISFSI DKT 72 MONTHYEARML24100A7242024-01-0303 January 2024
[Table view]08. Hs A19 Proposed CoC (Compiled 2023-0313) ML22321A2772022-11-17017 November 2022 Renewed Facility License No. DPR-26 NL-22-0718, Registration of Spent Fuel Cask Use2022-09-14014 September 2022 Registration of Spent Fuel Cask Use ML22245A1062022-09-0202 September 2022 Attachment 2: Proposed Certificate of Compliance No. 1014, Appendix a, Technical Specifications for the HI-Storm 100 Cask System ML22028A3832022-01-28028 January 2022 Attachment 11: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix D Reorganization Evaluation Form ML22028A3822022-01-28028 January 2022 Attachment 10: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix C Reorganization Evaluation Form ML22028A3812022-01-28028 January 2022 Attachment 9: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B Reorganization Evaluation Form ML22028A3802022-01-28028 January 2022 Attachment 8: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix a Reorganization Evaluation Form ML22028A3792022-01-28028 January 2022 Attachment 7: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization Evaluation Form ML22028A3782022-01-28028 January 2022 Attachment 6: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization Matrix ML22028A3772022-01-28028 January 2022 Attachment 5: Holtec International, Appendix D Technical Specifications for the HI-Storm 100 Cask System ML22028A3762022-01-28028 January 2022 Attachment 4: Holtec International, Appendix C Inspections, Tests, and Evaluations for the HI-Storm 100 Cask System ML22028A3752022-01-28028 January 2022 Attachment 3: Holtec International, Appendix B Technical Specifications for the HI-Storm 100 Cask System ML22028A3742022-01-28028 January 2022 Attachment 2: Holtec International, Appendix a Inspections, Tests, and Evaluations for the HI-Storm 100 Cask System ML22028A3732022-01-28028 January 2022 Attachment 1: Holtec International, Amendment 16 Certificate of Compliance for Spent Fuel Storage Casks ML21349B4202021-12-15015 December 2021 Attachment 1: Proposed HI-STORM 100 CoC Amendment 18 (non-proprietary) ML21211A6072021-07-30030 July 2021 Attachment 3: HI-STORM 100 FSAR Proposed Revision 23 Revised Pages ML21211A6052021-07-30030 July 2021 Attachment 1: HI-STORM 100 Amendment 17 Summary of Proposed Changes ML21211A6062021-07-30030 July 2021 Attachment 2: Proposed Coc No. 72-1014 ML21118A8682021-05-13013 May 2021 Certificate of Compliance 1014 - Amendment No. 15, Appendix D, Approved Contents and Design Features for the Hi-Storm 100S Version E Cask and Hi-Trac Ms ML21113A2032021-04-23023 April 2021 Attachment 1 - Certificate of Compliance Renewal Application for the HI-STORM 100 Dry Storage System RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21068A3632021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance ML21068A3972021-03-0909 March 2021 Attachment 35 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix D Reorganization Evaluation Form (Non-Proprietary) ML21068A3962021-03-0909 March 2021 Attachment 34 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix C Reorganization Evaluation Form (Non-Proprietary) ML21068A3952021-03-0909 March 2021 Attachment 33 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B-100U Reorganization Evaluation Form (Non-Proprietary) ML21068A3942021-03-0909 March 2021 Attachment 32 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix A-100U Reorganization Evaluation Form (Non-Proprietary) ML21068A3932021-03-0909 March 2021 Attachment 31 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B Reorganization Evaluation Form (Non-Proprietary) ML21068A3922021-03-0909 March 2021 Attachment 30 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix a Reorganization Evaluation Form (Non-Proprietary) ML21068A3912021-03-0909 March 2021 Attachment 29 - HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization Evaluation Form (Non-Proprietary) ML21068A3902021-03-0909 March 2021 Attachment 28 - HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization Matrix (Non-Proprietary) ML21068A3892021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix D Reorganization ML21068A3882021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix C Reorganization ML21068A3872021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B-100U Reorganization ML21068A3862021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix A-100U Reorganization ML21068A3852021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B Reorganization ML21068A3842021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix a Reorganization ML21068A3832021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization ML21068A3722021-03-0909 March 2021 HI-STORM 100 FSAR Proposed Revision 21 Revised Pages ML21068A3702021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix D ML21068A3692021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix C ML21068A3682021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B-100U ML21068A3672021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix A-100U ML21068A3662021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B ML21068A3622021-03-0909 March 2021 HI-STORM 100 Amendment 16 Summary of Proposed Changes ML21068A3642021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix a ML20290A8242020-10-16016 October 2020 Certificate of Compliance Renewal Application for the HI-STORM 100 Dry Storage System LR-N19-0029, Spent Fuel Cask Registration2019-02-25025 February 2019 Spent Fuel Cask Registration BVY 18-028, Registration of Spent Fuel Cask Use2018-07-0505 July 2018 Registration of Spent Fuel Cask Use NL-18-0627, Registration of Spent Fuel Casks2018-05-15015 May 2018 Registration of Spent Fuel Casks 2024-01-03 |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 AUG l 0 2016 LR-N16-0151 10 CFR 72.212 ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Salem Nuclear Generating Station Unit 2 Renewed Facility Operating License No. DPR-75 NRC Docket Nos. 50-311 and 72-0048
Subject:
Spent Fuel Cask Registration Pursuant to the requirements of 10 CFR 72.212(b )(2), PSEG Nuclear LLC (PSEG) hereby reports the following registration information associated with one HI-STORM 100 spent fuel cask system that was recently placed into storage in the PSEG Independent Spent Fuel Storage Installation (ISFSI).
Cask Certificate 72-1014 Amendment 5 Cask Model HI-STORM 100 MPC Serial Number 353 Overpack Serial Number 845 Number of Fuel Bundles 32 Placed in Service 07/11/2016 There are no regulatory commitments contained in this letter. If you have any questions regarding this submittal, please contact Mr. Thomas Cachaza at (856) 339-5038.
Sincerely, James Mallon Director- Site Regulatory Compliance tjc
LR-N16-0151 Page 2 cc: D. Dorman, Administrator, Region I, USNRC C. Parker, Project Manager, USNRC NRC Senior Resident Inspector, Hope Creek NRC Senior Resident Inspector, Salem P. Mulligan, Manager IV, NJBNE T. MacEwen, Commitment Tracking Coordinator, Hope Creek T. Cachaza, Commitment Tracking Coordinator, Salem L. Marabella, Corporate Commitment Tracking Coordinator C. Barnes, Dry Cask Storage Manager