LR-N11-0218, Inservice Inspection Activities - 90-Day Report
| ML11208C428 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 07/20/2011 |
| From: | Fricker C Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N11-0218 | |
| Download: ML11208C428 (5) | |
Text
T-.:
, 1.
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 PSEG Nuclear LLC JUL 2 0 2011 LR-NI 1-0218 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555-001 Salem Nuclear Generating Station Unit 2 Facility Operating License No. DPR-75 NRC Docket No. 50-311
SUBJECT:
Inservice Inspection Activities Day Report This letter submits the Owners Activity Report for Inservice Inspection (ISI) activities conducted at the Salem Generating Station Unit No. 2 during the eighteenth refueling outage. This report is submitted in accordance with Code Case N-532-4 "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA 6000, Section Xl, Division 1," and within its ninety (90) day reporting requirement. to this letter contains the required Salem Unit 2 Owners Activity Report.
There are no commitments made in this letter.
Should you have any questions regarding this submittal, please contact E. H. Villar at (856) 339-5456.
- Sincere F cker Site i President - Salem Enclosures (1)
Nuclear Regulatory Commission JUL 2 0 2011 Page 2 LR-N11-0218 cc Mr. W. Dean, USNRC - Administrator - Region I Mr. R. Ennis, USNRC - Licensing Project Manager - Salem USNRC Senior Resident Inspector - Salem (X24)
Mr. P. Mulligan, NJBNE Manager IV Mr. H. Berrick, Salem Commitment Tracking Coordinator Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. Milton Washington, Chief Inspector - Occupational Safety and Health Bureau of Boiler and Pressure Vessel Compliance
Nuclear Regulatory Commission LR-Nl1-0218 Salem Unit 2 Owners Activity Report - $2R1 8 In Accordance With ASME Section XI Code Case N-532-4
FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number
$2RFO18 Owner PSEG Nuclear LLC, PO Box 236, Hancocks Bridge, NJ 08038 Plant Salem Generating Station Unit No.
2 Commercial Service Date Oct. 13, 1981 Refueling Outage No. 18 Current Inspection Interval ISI - Third (3rd)
{Containment IWVE/I[VL Second (2 nd)
Current Inspection Period ISI - Third (3 rd) {Containment IXVE/I'WL First (lst)}
Edition and Addenda of Section XI Applicable to the inspection plan; ISI - 1998 Edition - 2000 Addenda; CISI (IWE/IWL) - 2004 Edition Date and revision of inspection plan ISI March 2009, Revision 1, CISI October 2010, Revision 0 Edition & Addenda of Section XI Applicable to repairs and replacements, if different than the inspection plan (Unless specifically identified in the individual repair plan)
ASME Class 1, 2 and 3 - 1998 Edition, 2000 Addenda; Class MC - 2004 Edition CERTIFICATE OF CONFORMANCE I certify that the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of S2RFO 18 confo to the requirements of Section XI.
Signed Edley T. Giles / ISI Program Manager 17 /2z lz C Owner or Owner's Designee, Title Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New York and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, during the period November 12, 2009 to May 8, 2011 and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report.
Furthennore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.,,
William J. Yaeger
,146ia.,* /.
X 6 4acommissions NB 12990 A,I,N NY5320 Inspector's Signature 7
/
National Board, State, Province, and Endorsements Date 7-I/
1 -
FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Exam Item Item Description Evaluation Description Category Number N/A N/A None N/A TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Description of Work Date Repair/
Class Completed Replacement Plan Number Tubing to valve Replaced tubing near valve 02/2112011 60089251 3
2MS227 2MS227 0
4" valve 2SW120 Repaired 4" 2SW120 Valve 06/10/2010 60090649 3
body Tubing DIS of valve Repair D/S tubing weld at 07/07/2010 60090841 3
2SWE250 valve 2SWE250 Tubing D/S of valve Replaced tubing D/S of valve 08/16/2010 60091644 3
2SW167 2SW167 Tubing at valve Replaced tubing and fittings at 07/10/2011 60096149 3
2SW230 valve SW230 Tubing between valve Replaced tubing between 2SS103 and valve 2SS103 and containment 05/11/2011 60096599 containment penetration 2
penetration 2 -