LR-N10-0023, Comment (5) of Gregory Sosson, on Behalf of PSEG Nuclear LLC, on Draft Regulatory Guide DG-1199, Alternative Radiological Sources for Evaluating Design Basis Accidents at Nuclear Power Reactors

From kanterella
Jump to navigation Jump to search
Comment (5) of Gregory Sosson, on Behalf of PSEG Nuclear LLC, on Draft Regulatory Guide DG-1199, Alternative Radiological Sources for Evaluating Design Basis Accidents at Nuclear Power Reactors
ML100540570
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 02/09/2010
From: Sosson G
Public Service Enterprise Group
To:
Rulemaking, Directives, and Editing Branch
References
74FR52822 00005, DG-1199, LR-N10-0023
Download: ML100540570 (2)


Text

1W PSEG P.O. Box 236, Hancocks Bridge, NJ 08038-0236 FEB 0 9 2010 0 PSEG Nuclear LLC LR-N10-0023 Rulemaking and Directives Branch Division of Administrative Services 73 U.S. Nuclear Regulatory Commission '1 Washington, D.C. 20555-0001 ~1 Salem Nuclear Generating Station, Units 1 and 2 UZ)

Facility Operating License Nos. DPR-70 and 75 II NRC Docket Nos. 50-272 and 50-311 Hope Creek Generating Station Facility Operating License No. NPF-57 NRC Docket No. 50-354

Subject:

Comments on Draft Regulatory Guide DG-1199, "Alternative Radiological Sources for Evaluating Design Basis Accidents at Nuclear Power Reactors," (Federal Register of October 14, 2009, 74 FR 52822).

Reference:

Letter from Ralph L. Andersen (NEI) to NRC: "Nuclear Energy Institute Comments on U. S. Nuclear Regulatory Commission Draft Regulatory Guide DG-1 199, "Alternative Radiological Sources for Evaluating Design Basis Accidents at Nuclear Power Reactors," (Federal Register of October 14, 2009, 74 FR 52822) dated January 20, 2010.

PSEG Nuclear LLC (PSEG) appreciates the opportunity to submit comments on Draft Regulatory Guide DG-1 199, "Alternative Radiological Sources for Evaluating Design Basis Accidents at Nuclear Power Reactors". PSEG has reviewed and fully supports the comments made by the Nuclear Energy Institute (NEI) in the referenced letter above including all attachments.

The NRC is requested to extend the period for receiving comments on DG-1 199 and delay final issuance of Revision 1 to Regulatory Guide 1.183. There are no new regulatory commitments contained in this letter. If you have any questions or require additional information, please contact Lee Marabella, Senior Licensing Engineer, at 856-339-1208.

S3

$~2~j7 b )4~a&~-~y~

A/ 2

Rulemaking and Directives Branch LR-N10-0023 Page 2 FEB 0 9 20f0 Sincerely, Gregfory Sosson Director - Engineering Services C NRC Document Control Desk Corporate Commitment Tracking Coordinator