LR-N07-0211, Withdrawal of LCR S06-07 - Refueling Operations Decay Time
| ML072340442 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 08/13/2007 |
| From: | Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LCR S06-07, LR-N07-0211 | |
| Download: ML072340442 (2) | |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 PSEG Nitclear LLC 10 CFR 50.90 AUG y1.3 2007 LR-N07-021 1 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 SALEM GENERATING STATION - UNIT 2 FACILITY OPERATING LICENSE NO. DPR-75 NRC DOCKET NO. 50-311
Subject:
WITHDRAWAL OF LCR S06 REFUELING OPERATIONS -
DECAY TIME
References:
(1) Letter from PSEG to NRC: "Request for Changes to Technical Specifications, Refueling Operations -Decay Time, Salem Nuclear Generating Station, Units 1 and 2, Facility Operating Licenses DPR-70 and DPR-75, Docket Nos. 50-272 and 50-311'", dated August 4, 2006 (2) Letter from PSEG to NRC: "Response to RAls on LCR S06 Refueling Operations -Decay Time, Salem Nuclear Generating Station, Units 1 and 2, Facility Operating Licenses DPR-70 and DPR-75, Docket Nos. 50-272 and 50-311 ", dated March 8, 2007 In Reference 1, PSEG Nuclear LLC (PSEG) submitted License Change Request (LCR)
S06-07 to amend the Technical Specifications (TS) for the Salem Nuclear Generating Station, Units 1 and 2. LCR S06-07 proposed to revise TS 3/4.9.3 "Decay Time" to allow fuel movement in the containment to commence at the time calculated using the Salem Spent Fuel Pool Integrated Decay Heat Management (IDHM) Program.
In Reference 2, the PSEG responded to an NRC request for additional information on the Reference 1 request.
Following additional discussion with the NRC Staff, PSEG is withdrawing the Reference 1 license amendment request. This license amendment request may be re-submitted in the future.
95-2168 REV. 7/99
Document Control Desk Page 2 LR-N07-021 1 If you have any questions or require additional information, please do not hesitate to contact Mr. Jamie Mallon at (610) 765-5507.
Sincerely, Director - Regulatory Affairs Salem Generating Station CC Mr. S. Collins, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. R. Ennis, Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission Mail Stop 08B13 Washington, DC 20555 USNRC Senior Resident Inspector - (Salem X24)
Mr. P. Mulligan Bureau of Nuclear Engineering P.O. Box 415 Trenton, NJ 08625