-4

. r.

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 NOV 17 2003 O PSEG NuclearLLC LR-N03-0470 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for October 2003 are being forwarded.

Sincerely Carl Fricker Salem Plant Manager Attachments C Distribution 1576@

95-2168 REV. 7199

DOCKET NO.:

UNIT:

.., DATE:

COMPLETED BY:

TELEPHONE:

50-311 Salem 2 11/11/03 F. Todd (856) 339-1316 Reporting Period October 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH)

I1 31 1092 Month Year-to-date Cumulative 212 6553 126969 212 6520 123478

.0 0

0 233103 7205179 126394154 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 3 10/9/03 S

533 Hrs.

C 1

Refuel Outage 10/31/03 (1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-311 Salem 2 11/11/03 R. Ritzman (856) 339-1445 Summary Of Monthly Operating Experience Salem 2 entered the month at approximately 100% power and remained there until October 9, when the unit was shutdown for a refueling outage.

  • Salem 2 remained in the refueling outage at the end of the month.