-4
. r.
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 NOV 17 2003 O PSEG NuclearLLC LR-N03-0470 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for October 2003 are being forwarded.
Sincerely Carl Fricker Salem Plant Manager Attachments C Distribution 1576@
95-2168 REV. 7199
DOCKET NO.:
UNIT:
.., DATE:
COMPLETED BY:
TELEPHONE:
50-311 Salem 2 11/11/03 F. Todd (856) 339-1316 Reporting Period October 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH)
I1 31 1092 Month Year-to-date Cumulative 212 6553 126969 212 6520 123478
.0 0
0 233103 7205179 126394154 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 3 10/9/03 S
533 Hrs.
C 1
Refuel Outage 10/31/03 (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-311 Salem 2 11/11/03 R. Ritzman (856) 339-1445 Summary Of Monthly Operating Experience Salem 2 entered the month at approximately 100% power and remained there until October 9, when the unit was shutdown for a refueling outage.
- Salem 2 remained in the refueling outage at the end of the month.