PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 NOV 1 7 2003 LR-N03-0469 O PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 1 Technical Specifications, the operating statistics for October 2003 are being forwarded.
Salem Plant Manager Attachments C Distribution 95-2168 REV. 7/99
e.
DOCKET NO.:
UNIT:
I DATE:
COMPLETED BY:
TELEPHONE:
50-272 Salem 1 11/11/03 F. Todd (856) 339-1316 Reporting Period October 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1130 1096 Month Year-to-date Cumulative 678 7014 149202 668 6938 144489 0
0 0
725498 7524038 147428004 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 3 10/15/03 F 77 hrs.
A 1
Manual Reactor l
l shutdown due to steam 10/19/03 generator level control valve failure (14B F 19).
I I A.
A.
n a.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
(1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.: 50-272 UNIT: Salem 1 DATE: 11/11/03 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience Salem 1 entered the month at approximately 100% power.
On October 15, Salem 1 was manually shutdown due to a steam generator level control valve failure. The unit was returned on-line on October 19.
On October 29, power was reduced to approximately 79% due to solar magnetic disturbance, returning to 100% power on October 31.
- At the end of the month, Salem 1 completed 12 days of continuous on-line operation.