LR-N03-0469, October 2003 Monthly Operating Report for Salem, Unit 1

From kanterella
Jump to navigation Jump to search
October 2003 Monthly Operating Report for Salem, Unit 1
ML033290310
Person / Time
Site: Salem PSEG icon.png
Issue date: 11/17/2003
From: Fricker C
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N03-0469
Download: ML033290310 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 NOV 1 7 2003 LR-N03-0469 O PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 1 Technical Specifications, the operating statistics for October 2003 are being forwarded.

Salem Plant Manager Attachments C Distribution 95-2168 REV. 7/99

e.

DOCKET NO.:

UNIT:

I DATE:

COMPLETED BY:

TELEPHONE:

50-272 Salem 1 11/11/03 F. Todd (856) 339-1316 Reporting Period October 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1130 1096 Month Year-to-date Cumulative 678 7014 149202 668 6938 144489 0

0 0

725498 7524038 147428004 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 3 10/15/03 F 77 hrs.

A 1

Manual Reactor l

l shutdown due to steam 10/19/03 generator level control valve failure (14B F 19).

I I A.

A.

n a.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

(1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

DOCKET NO.: 50-272 UNIT: Salem 1 DATE: 11/11/03 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience Salem 1 entered the month at approximately 100% power.

On October 15, Salem 1 was manually shutdown due to a steam generator level control valve failure. The unit was returned on-line on October 19.

On October 29, power was reduced to approximately 79% due to solar magnetic disturbance, returning to 100% power on October 31.

  • At the end of the month, Salem 1 completed 12 days of continuous on-line operation.