LR-N03-0394, August 2003 Monthly Operating Report for Salem Unit 2
| ML032671073 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 09/15/2003 |
| From: | Fricker C Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N03-0394 | |
| Download: ML032671073 (3) | |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 SEP 1 5 2003 LR-N03-0394 o PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for August 2003 are being forwarded.
Sincerely ratiosLier O raions Director Attachments C Distribution
'kl 95-2168 REV. 7/99
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-311 Salem 2 99103 F. Todd (856) 339-1316 Reporting Period August 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1131 1092 Month 744 744 6749 122707 0
0 0
814470 6392021 125580996 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)
(1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-311 Salem 2 9/9/03 R. Ritzman (856) 339-1445 Summary Of Monthly Operating Experience Salem 2 entered the month at approximately 100% power and remained there throughout the month.
- At the end of the month, Salem 2 completed 152 days of continuous on-line operation.