LR-N03-0310, June 2003 Monthly Operating Report for Salem Unit 2
ML032040182 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 07/11/2003 |
From: | Waldinger L Public Service Enterprise Group |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
LR-N03-0310 | |
Download: ML032040182 (3) | |
Similar Documents at Salem | |
---|---|
Category:Letter type:LR
MONTHYEARLR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024
[Table view]Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion LR-N23-0072, Core Operating Limits Report – Cycle 302023-11-0101 November 2023 Core Operating Limits Report – Cycle 30 LR-N23-0045, And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0033, Core Operating Limits Report – Cycle 272023-04-26026 April 2023 Core Operating Limits Report – Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N23-0016, And Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 And Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 LR-N22-0096, And Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 And Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0095, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 20222022-12-20020 December 2022 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2022 LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0092, Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG2022-12-0909 December 2022 Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N22-0084, Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095)2022-11-17017 November 2022 Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) LR-N22-0090, Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2022-11-10010 November 2022 Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem LR-N22-0065, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2022-09-27027 September 2022 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations LR-N22-0074, Emergency Plan Evacuation Time Estimate2022-09-15015 September 2022 Emergency Plan Evacuation Time Estimate LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM)2022-08-31031 August 2022 License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) LR-N22-0063, Spent Fuel Cask Registration2022-08-10010 August 2022 Spent Fuel Cask Registration LR-N22-0068, In-Service Inspection Activities - 90-Day Report2022-08-10010 August 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N22-0062, Spent Fuel Cask Registration2022-07-21021 July 2022 Spent Fuel Cask Registration LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report LR-N22-0044, Emergency Plan Document Revisions Implemented November, 20212022-05-19019 May 2022 Emergency Plan Document Revisions Implemented November, 2021 LR-N22-0043, Core Operating Limits Report - Cycle 292022-05-0909 May 2022 Core Operating Limits Report - Cycle 29 2024-07-24 Category:License-Monthly Operating Report MONTHYEARLR-N06-0078, January 2006 Monthly Operating Report for Salem, Unit 22006-02-16016 February 2006
[Table view]January 2006 Monthly Operating Report for Salem, Unit 2 LR-N06-0077, January 2006 Monthly Operating Report for Salem, Unit 12006-02-15015 February 2006 January 2006 Monthly Operating Report for Salem, Unit 1 LR-N06-0015, December 2005 Monthly Operating Report for Salem Generating Station Unit 12006-01-16016 January 2006 December 2005 Monthly Operating Report for Salem Generating Station Unit 1 LR-N06-0016, December 2005 Monthly Operating Report for Salem Generating Station Unit 22006-01-16016 January 2006 December 2005 Monthly Operating Report for Salem Generating Station Unit 2 LR-N05-0585, November 2005 Monthly Operating Report for Salem Generating Station, Unit 12005-12-14014 December 2005 November 2005 Monthly Operating Report for Salem Generating Station, Unit 1 LR-N05-0586, November 2005 Monthly Operating Report for Salem Generating Station Unit 22005-12-14014 December 2005 November 2005 Monthly Operating Report for Salem Generating Station Unit 2 LR-N05-0557, October 2005 Monthly Operating Report for Salem, Unit 22005-11-15015 November 2005 October 2005 Monthly Operating Report for Salem, Unit 2 LR-N05-0556, October 2005 Monthly Operating Report for Salem, Unit 12005-11-15015 November 2005 October 2005 Monthly Operating Report for Salem, Unit 1 LR-N05-0519, September 2005 Monthly Operating Report for Salem Generating Station Unit 12005-10-14014 October 2005 September 2005 Monthly Operating Report for Salem Generating Station Unit 1 LR-N05-0518, September 2005 Monthly Operating Report for Salem Generating Station Unit 12005-10-14014 October 2005 September 2005 Monthly Operating Report for Salem Generating Station Unit 1 LR-N05-0452, August 2005 Monthly Operating Report for Salem Generating Station Unit 22005-09-15015 September 2005 August 2005 Monthly Operating Report for Salem Generating Station Unit 2 LR-N05-0451, August 2005 Monthly Operating Report for Salem Generating Station Unit 12005-09-15015 September 2005 August 2005 Monthly Operating Report for Salem Generating Station Unit 1 LR-N05-0417, July 2005 Monthly Operating Report for Salem Generating Station Unit 22005-08-11011 August 2005 July 2005 Monthly Operating Report for Salem Generating Station Unit 2 LR-N05-0416, July 2005 Monthly Operating Report for Salem Generating Station Unit 22005-08-11011 August 2005 July 2005 Monthly Operating Report for Salem Generating Station Unit 2 LR-N05-0354, June 2005 Monthly Operating Report for Salem Generating Station Unit 12005-07-14014 July 2005 June 2005 Monthly Operating Report for Salem Generating Station Unit 1 LR-N05-0355, June 2005 Monthly Operating Report for Salem Generating Station Unit 22005-07-14014 July 2005 June 2005 Monthly Operating Report for Salem Generating Station Unit 2 LR-N05-0315, May 2005 Monthly Operating Report for Salem Generating Station, Unit 22005-06-14014 June 2005 May 2005 Monthly Operating Report for Salem Generating Station, Unit 2 LR-N05-0314, May 2005 Monthly Operating Report for Salem Generating Station, Unit 12005-06-14014 June 2005 May 2005 Monthly Operating Report for Salem Generating Station, Unit 1 LR-N05-0263, April 2005 Monthly Operating Report for Salem Generating Station Unit 12005-05-13013 May 2005 April 2005 Monthly Operating Report for Salem Generating Station Unit 1 LR-N05-0264, April 2005 Monthly Operating Report for Salem Generating Station Unit 22005-05-13013 May 2005 April 2005 Monthly Operating Report for Salem Generating Station Unit 2 LR-N05-0208, March 2005 Monthly Operating Report for Salem Generating Station, Unit 12005-04-14014 April 2005 March 2005 Monthly Operating Report for Salem Generating Station, Unit 1 LR-N05-0209, March 2005 Monthly Operating Report for Salem Generating Station, Unit 22005-04-14014 April 2005 March 2005 Monthly Operating Report for Salem Generating Station, Unit 2 LR-N04-0146, February 2005 Monthly Operating Report for Salem Generating Station Unit 22005-03-14014 March 2005 February 2005 Monthly Operating Report for Salem Generating Station Unit 2 LR-N05-0145, February 2005 Monthly Operating Report for Salem Generating Station Unit 12005-03-14014 March 2005 February 2005 Monthly Operating Report for Salem Generating Station Unit 1 LR-N05-0091, January 2005 Monthly Operating Report for Salem Generating Station Unit 12005-02-14014 February 2005 January 2005 Monthly Operating Report for Salem Generating Station Unit 1 LR-N04-0092, January 2005 Monthly Operating Report for Salem Generating Station Unit 22005-02-14014 February 2005 January 2005 Monthly Operating Report for Salem Generating Station Unit 2 LR-N04-0012, December 2004 Monthly Operating Report, Salem Generating Station, Unit 22005-01-14014 January 2005 December 2004 Monthly Operating Report, Salem Generating Station, Unit 2 LR-N05-0011, December 2004 Monthly Operating Report, Salem Generating Station, Unit 12005-01-14014 January 2005 December 2004 Monthly Operating Report, Salem Generating Station, Unit 1 LR-N04-0573, November 2004 Monthly Operating Report for Salem, Unit 22004-12-15015 December 2004 November 2004 Monthly Operating Report for Salem, Unit 2 LR-N04-0572, November 2004 Monthly Operating Report for Salem Generating Station Unit 12004-12-15015 December 2004 November 2004 Monthly Operating Report for Salem Generating Station Unit 1 LR-N04-0505, October 2004 Monthly Operating Report for Salem Generating Station, Unit 12004-11-11011 November 2004 October 2004 Monthly Operating Report for Salem Generating Station, Unit 1 LR-N04-0506, October 2004 Monthly Operating Report for Salem Generating Station, Unit 22004-11-11011 November 2004 October 2004 Monthly Operating Report for Salem Generating Station, Unit 2 LR-N04-0448, September 2004 Monthly Operating Report for Salem Generating Station Unit 22004-10-15015 October 2004 September 2004 Monthly Operating Report for Salem Generating Station Unit 2 LR-N04-0447, September 2004 Monthly Operating Report for Salem Unit 12004-10-15015 October 2004 September 2004 Monthly Operating Report for Salem Unit 1 LR-N04-0405, August 2004 Monthly Operating Report for Salem Generating Station Unit 12004-09-13013 September 2004 August 2004 Monthly Operating Report for Salem Generating Station Unit 1 LR-N04-0406, August 2004 Monthly Operating Report for Salem Generating Station Unit 22004-09-13013 September 2004 August 2004 Monthly Operating Report for Salem Generating Station Unit 2 LR-N04-0356, July 2004 Monthly Operating Report for Salem Generating Station Unit 12004-08-12012 August 2004 July 2004 Monthly Operating Report for Salem Generating Station Unit 1 LR-N04-0357, July 2004 Monthly Operating Report for Salem Generating Station Unit 22004-08-12012 August 2004 July 2004 Monthly Operating Report for Salem Generating Station Unit 2 LR-N04-0302, June 2004 Monthly Operating Report from Salem Generating Station Unit 12004-07-13013 July 2004 June 2004 Monthly Operating Report from Salem Generating Station Unit 1 LR-N04-0257, May 2004 Monthly Operating Report for Salem Generating Station Unit 22004-06-14014 June 2004 May 2004 Monthly Operating Report for Salem Generating Station Unit 2 LR-N04-0256, May 2004 Monthly Operating Report for Salem Generating Station Unit 12004-06-14014 June 2004 May 2004 Monthly Operating Report for Salem Generating Station Unit 1 LR-N04-0213, April 2004 Monthly Operating Report for Salem Generating Station, Unit 22004-05-12012 May 2004 April 2004 Monthly Operating Report for Salem Generating Station, Unit 2 LR-N04-0212, April 2004 Monthly Operating Report for Salem Generating Station, Unit 12004-05-12012 May 2004 April 2004 Monthly Operating Report for Salem Generating Station, Unit 1 LR-N04-0171, March 2004 Monthly Operating Report for Salem Generating Station Unit 22004-04-15015 April 2004 March 2004 Monthly Operating Report for Salem Generating Station Unit 2 LR-N04-0170, March 2004 Monthly Operating Report for Salem Generating Station Unit 12004-04-15015 April 2004 March 2004 Monthly Operating Report for Salem Generating Station Unit 1 LR-N04-0111, February 2004 Monthly Operating Report for Salem, Unit 22004-03-11011 March 2004 February 2004 Monthly Operating Report for Salem, Unit 2 LR-N04-0110, February 2004 Monthly Operating Report for Salem, Unit 12004-03-11011 March 2004 February 2004 Monthly Operating Report for Salem, Unit 1 LR-N04-0060, January 2004 Monthly Operating Report for Salem, Unit 12004-02-17017 February 2004 January 2004 Monthly Operating Report for Salem, Unit 1 LR-N04-0061, January 2004 Monthly Operating Report for Salem, Unit 22004-02-17017 February 2004 January 2004 Monthly Operating Report for Salem, Unit 2 LR-N03-0518, November 2003 Monthly Operating Report for Salem Unit 12003-12-15015 December 2003 November 2003 Monthly Operating Report for Salem Unit 1 2006-02-16 |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 JUL 1 1 2003 0 PSEG NuclearLLC LR-N03-0310 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for June 2003 are being forwarded.
Sincerely, Lon Waldinger Operations Director Attachments C Distribution
"--'I 95-2168 REV. 7/99
DOCKET NO.: 50-311 UNIT: Salem 2 DATE: 7/8/03 COMPLETED BY: F. Todd TELEPHONE: (856) 339-1316 Reporting Period June 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1131 Maximum Dependable Capacity (MWe-Net) 1092 Month Year-to-date Cumulative No. of hours reactor was critical 720 4274 124690 No. of hours generator was on line (service 720 4261 121219 hours)
Unit reserve shutdown hours 0 0 0 Net Electrical Energy (MWH) 802414 4759106 123948081 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS) (1) SHUTTING COMMENT S=SCHEDULED DOWN THE
__ __ __ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ REA CTO R 2 _ _ _ _ _ _ _ _ _
(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other
DOCKET NO.: 50-311 UNIT: Salem 2 DATE: 7/8/03 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operatina Experience
- Salem 2 entered the month at approximately 100% power.
- At the end of the month, Salem 2 completed 90 days of continuous on-line operation.