LR-N03-0310, June 2003 Monthly Operating Report for Salem Unit 2

From kanterella
Jump to navigation Jump to search
June 2003 Monthly Operating Report for Salem Unit 2
ML032040182
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/11/2003
From: Waldinger L
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N03-0310
Download: ML032040182 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 JUL 1 1 2003 0 PSEG NuclearLLC LR-N03-0310 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for June 2003 are being forwarded.

Sincerely, Lon Waldinger Operations Director Attachments C Distribution

"--'I 95-2168 REV. 7/99

DOCKET NO.: 50-311 UNIT: Salem 2 DATE: 7/8/03 COMPLETED BY: F. Todd TELEPHONE: (856) 339-1316 Reporting Period June 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1131 Maximum Dependable Capacity (MWe-Net) 1092 Month Year-to-date Cumulative No. of hours reactor was critical 720 4274 124690 No. of hours generator was on line (service 720 4261 121219 hours)

Unit reserve shutdown hours 0 0 0 Net Electrical Energy (MWH) 802414 4759106 123948081 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS) (1) SHUTTING COMMENT S=SCHEDULED DOWN THE

__ __ __ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ REA CTO R 2 _ _ _ _ _ _ _ _ _

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other

DOCKET NO.: 50-311 UNIT: Salem 2 DATE: 7/8/03 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operatina Experience

  • Salem 2 entered the month at approximately 100% power.
  • At the end of the month, Salem 2 completed 90 days of continuous on-line operation.