LR-N03-0258, May 2003 Monthly Operating Report for Salem Unit 1

From kanterella
Jump to navigation Jump to search
May 2003 Monthly Operating Report for Salem Unit 1
ML031690373
Person / Time
Site: Salem PSEG icon.png
Issue date: 06/11/2003
From: Waldinger L
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N03-0258
Download: ML031690373 (3)


Text

-'

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 JUN 1-1 2003 LR-N03-0258 O PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT I DOCKET NO. 50-272 In compliance with Section 6.9, ReporUng Requirements for the Salem Unit I Technical Specifications, the operating statistics for May 2003 are being forwarded.

Sincerely, Operations Director Attachments C Distribution 95-2168 REV. 7/99

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-272 Salem 1 6/6/03 F. Todd (856) 339-1316 Reporting Perod May 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1130 1096 Month Year-to-date Cumulative 744 3623 145811 744 3623 141174 0

0 0

8269221 39033741 143807340 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTIONl F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)

(1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other I - Manual 2 - Manual Trip/Scram 3 - Automatic TrplScram 4-Confinuaffon 5 - Other (Explain)

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-272 Salem 1 616/03 R. Ritzman (856) 339-1445 Summary Of Monthly Operatinn Experience

  • Salem 1 started the month at approximately 79% power due to a 500kv line outage. Power was restored to approximately 100% on May 1.
  • On May 3, power was reduced to approximately 68% due to another 500kv line outage (grass fire). Powerwas restored to approximately 100% laterthat day.

At the end of the month, Salem I completed 199 days of continuous on-line operation.