LR-N03-0118, February 2003 Monthly Operating Report for Salem, Unit 1

From kanterella
Jump to navigation Jump to search
February 2003 Monthly Operating Report for Salem, Unit 1
ML030770767
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/11/2003
From: Waldinger L
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N03-0118
Download: ML030770767 (3)


Text

PSEG Nuclear LLC P.O Box 236, Hancocks Bndge, New Jersey 08038-0236 MAR 1 1 2003 LR-N03-0118 O PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

'MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT I DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit I Technical Specifications, the operating statistics for February 2003 are being forwarded.

Sincerely, RAR Attachments C Distribution 95-2168 REV 7199

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-272 Salem 1 3/10/03 F. Todd (856) 339-1316 Reporting Period February 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1130 1096 uuI *

-L nvonin T ear-1o-aale j

umuiative 672 1416 143604 672 1416 138967 0

0 0

736485 1575171

.141479137 UNIT SHUTDOWNS L.

L J

I J

(1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)

I t

I

DOCKET NO.: 50-272 UNIT: Salem 1 DATE: 3/10/03 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience

  • Salem 1 entered the month at 100% reactor power.
  • On February 22, a planned power reduction was taken for Turbine Control Valve Testing and a 500KV Line Outage. Power was restored to 100% on February 25.
  • At the end of the month, Salem 1 completed 107 days of continuous on-line operation.