PSEG Nuclear LLC P.O Box 236, Hancocks Bridge, New Jersey 08038-0236 FEB 1 4 2003 LR-N03-0062 o PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for January 2003 are being forwarded.
Sincerely, Lon Waldinger Operations Director RAR Attachments C Distribution 95-2168 REV 7/99
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-311 Salem 2 2/10/03 F. Todd (856) 339-1316 Reporting Period January 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH)
UNIT SHUTDO' 1131 1092 Month 744 744 744 744 Cumulative 121160 117702 0
lo 8
10 839988 1839988 1120028963 V
I.
TYPE F=FORCED S=SCHEDULED DURATION (HOURS)
REASON (1)
.1 1
t T
METHOD OF SHUTTING DOWN THE REACTOR (2)
CORRECTIVE ACTION/
COMMENT I____
I I_____J________________I___________
I
_______I____
I________________________
(2) Method (1) Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
NO.
DATE 744 744
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-311 Salem 2 2/10/03 R. Ritzman (856) 339-1445 Summary Of Monthly Operatinq Experience
- Salem 2 began the month at 100% reactor power and remained there throughout the month.
- At the end of the month, Salem 2 completed 259 days of continuous on.line operation.