PSEG Nuclear LLC P.O Box 236, Hancocks Bndge, New Jersey 08038-0236 SEP 1 6 2002 LR-N02-0327 O PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT I DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 1 Technical Specifications, the operating statistics for August 2002 are being forwarded.
Sincerely, D. F. Garc/ ow Vice Presiilent - Operations RAR Attachments C Distribution 95-2168 REV. 7199
DOCKET NO.:
UNIT:
,DATE:
COMPLETED BY:
TELEPHONE:
50-272 Salem 1 09/10/02 F. Todd (856) 339-1316 Reporting Period August 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1130 1096 Month Year-to-aate Lyumulative 744 15673 139900 744 5593 135288 0
0 0
824188 6173942 137457340 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)
I _______
I _____________
.1.
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-272 Salem 1 09/10/02 R. Ritzman (856) 339-1445 Summary Of Monthly ODeratina Experience Salem 1 entered the month at approximately 100% power and remained there throughout the month.
At the end of the month, Salem 1 completed 171 days of continuous on line operation.