LR-N02-0188, April 2002 Monthly Operating Report for Salem Unit 1

From kanterella
Jump to navigation Jump to search
April 2002 Monthly Operating Report for Salem Unit 1
ML021650316
Person / Time
Site: Salem PSEG icon.png
Issue date: 05/15/2002
From: Garchow D, Todd F
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N02-0188
Download: ML021650316 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 MAY 1 5 200Z o PSEG NuclearLLC LR-N02-0188 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT I DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 1 Technical Specifications, the operating statistics for April 2002 are being forwarded.

Sincerely, D. F. Gt chow Vice President - Operations RAR Attachments C Distribution 95-2168 REV. 7/99

DOCKET NO.: 50-272 UNIT: Salem 1 DATE: 05/10/02 COMPLETED BY: F. Todd TELEPHONE: (856) 339-1316 Reporting Period April 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1130 Maximum Dependable Capacity (MWe-Net) 1096 Month Year-to-date Cumulative No. of hours reactor was critical 719 2721 136948 No. of hours generator was on line (service 719 2641 132336 hours)

Unit reserve shutdown hours 0 0 0 Net Electrical Energy (MWH) 794998 2893127 134176525 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS) (1) SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)

___ i. ______ .1 ____________ _________ .I. _______ *

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other

DOCKET NO.: 50-272 UNIT: Salem 1 DATE: 05/10/02 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operatinq Experience

" Salem 1 began the month at 100% power.

" On April 17, power was reduced to approximately 74% due to the 13A and 13B circulators being out of service. 13A circulator was out of service for planned maintenance. The 13B circulator waterbox became bio-fouled and was taken out of service for cleaning. Power was restored to approximately 100% on April 19.

"* On April 22, power was reduced to approximately 60% due to 12 Steam Generator Feed Pump being removed from service. Power was returned to 100% later that day.

"* At the end of the month, Salem 1 completed 48 days of continuous operation.