PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 APR 1 2 2002 LR-N02-0157 o PSEG Nu clear LL C U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 1 Technical Specifications, the operating statistics for March 2002 are being forwarded.

Sincerely, D. F. Gar ow Vice President - Operations RAR Attachments C Distribution 95-2168 REV. 7/99

INDEX NUMBER SECTION OF PAGES Operating Data Report...............................................................................

1 Monthly Operating Summary......................................................................

1

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-272 Salem 1 04/12/02 F. Todd (856) 339-1316 Reporting Period March 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1130 1096 Month Year-to-date Cumulative 586 2002 136229 506 1922 131617 0

0 0

541892 2098129 133381527 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 1 3/3/02 F

238 hrs.

A 1

Circulating Water System 3/13/02 (1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

DOCKET NO.: 50-272 UNIT: Salem 1 DATE: 04/12/02 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience

"* Salem 1 began the month at 76% power.

"* On March 3, Salem 1 was shutdown to perform circulating water pump and traveling screen maintenance.

"* On March 13, the unit was placed back on line, reaching 100% power on March 14.

"* At the end of the month, Salem 1 completed 18 days of continuous operation.