-- S Director - Operations RAR Attachments C Distribution 95-2168 REV 7199 PSEG Nuclear LLC P 0. Box 236, Hancocks Bndge, New Jersey 08038-0236 0 PSEG Nuclear LLC JAN 1 4 2003 LR-N02-0008 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555.
Gentlemen:
MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for December 2002 are being forwarded.
Sincerely,
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-311 Salem 2 1/8/03 F. Todd (856) 339-1316 Reporting Period December 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1131 1092 Month Year-to-date Cumulative 744 7703 120416 744 7620 116958 0
0 0
834071 8367434 119188975 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)
(1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.: 50-311 UNIT: Salem 2 DATE: 1/8/03 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience
"* Salem 2 began the month at 100% reactor power.
On December 15, power was reduced to approximately 46% for control valve testing and was returned to 100% later that day. Power remained at approximately 100% power for the rest of the month.
" At the end of the month, Salem 2 completed 228 days of continuous on line operation.