|
---|
Category:Emergency Preparedness-Emergency Plan
MONTHYEARLIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-18-0018, Independent Spent Fuel Storage Installation - Emergency Plan Update2018-04-18018 April 2018 Independent Spent Fuel Storage Installation - Emergency Plan Update ML17229B1572017-08-0808 August 2017 Independent Spent Fuel Storage Installation - Submittal of Emergency Plan Update LIC-17-0063, EP-FC-1001, Rev. 2, Post-Shutdown Radiological Emergency Response Plan.2017-08-0808 August 2017 EP-FC-1001, Rev. 2, Post-Shutdown Radiological Emergency Response Plan. LIC-17-0047, Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2017-05-15015 May 2017 Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme LIC-17-0006, EP-FC-1001 Addendum 3 Rev 2 Issued 12/29/20162017-01-11011 January 2017 EP-FC-1001 Addendum 3 Rev 2 Issued 12/29/2016 LIC-16-0110, Emergency Plan Update2016-11-30030 November 2016 Emergency Plan Update LIC-16-0082, Summary of Emergency Planning Changes2016-09-0909 September 2016 Summary of Emergency Planning Changes LIC-16-0026, Emergency Planning Changes2016-03-17017 March 2016 Emergency Planning Changes LIC-16-0021, Emergency Planning Changes2016-03-0202 March 2016 Emergency Planning Changes LIC-15-0102, Response to NRC Request for Additional Information Re License Amendment Request to Adopt Emergency Action Level Scheme Per NEI 99-01, Rev. 62015-09-11011 September 2015 Response to NRC Request for Additional Information Re License Amendment Request to Adopt Emergency Action Level Scheme Per NEI 99-01, Rev. 6 LIC-13-0016, Omaha Public Power District - Response to Eight Generic Technical Issues Regarding Fort Calhoun Station'S Communication Capability2013-02-22022 February 2013 Omaha Public Power District - Response to Eight Generic Technical Issues Regarding Fort Calhoun Station'S Communication Capability 2019-02-28
[Table view] Category:Letter type:LIC
MONTHYEARLIC-24-0015, Response to Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (DQAP) – Clarification of Request for Additional Information Response2024-11-20020 November 2024 Response to Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (DQAP) – Clarification of Request for Additional Information Response LIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0006, Annual 2021 Decommissioning Funding/Irradiated Fuel Management Status Report2021-09-0808 September 2021 Annual 2021 Decommissioning Funding/Irradiated Fuel Management Status Report LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ 2024-06-18
[Table view] |
Text
....
..-. ~
~--
Omaha ~
Public Power District March 17, 2016 LIC-16-0026 10 CFR 50.54(q) 10 CFR 50.4(b)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285
SUBJECT:
Emergency Planning Changes In accordance with 10 CFR 50.54(q), the Omaha Public Power District submits a report of each such change made including a summary of its analysis. This change was reviewed and does not constitute a reduction in effectiveness.
No commitments are made in this letter.
If you have any questions regarding the enclosed changes, please contact Mr. Eric Plautz at 402-533-7308.
g~
'Bradley H. Blome Manager - Site Regulatory Assurance BHB:mec Enclosure c: M. L. Dapas, NRC Regional Administrator, Region IV C.F. Lyon, NRC Project Manager S. M. Schneider, NRC Senior Resident Inspector Fort Calhoun Station. PO Box 550 Fort Calhoun, NE 68023/9610 Power Lane. Blair, NE 68008
TBD-EPIP-OSC-1A Rev 3 and FC-EPF-42 Rev 11 Summary of analysis:
TBD-EPIP-OSC-1A provides the basis for abnormal rad levels and radiological effluent classifications.
Specific set points for RM -054A and RM-054B (Steam Generator Slowdown) are listed for the NOUE and ALERT classification levels based on predetermined monitored setpoints that are determined during instrument calibration . New predetermined setpoints were calculated based on recalibration and change of background and efficiency for RM-054A and RM-0548. Updating the basis document as well as the classification form (FC-EPF-42) to reflect the updated setpoints in no way reduces the effectiveness of the emergency plan.
A change to an EAL numeric threshold to reflect a change in a plant design parameter, instrument response characteristics, or design calculation would generally not require prior NRC approval provided that the meaning or intent of the basis of the approved EAL is unchanged. The changes made to TBD-EPIP-OSC-1A and FC-EPF-42 fall into this category.
Summary of Analysis for editorial EPIP changes.
These EPIPs were not marked "Reference Use" throughout. Some were marked various levels of use, information, or continuous use, which are incorrect. All Emergency Planning Implementing Procedures should be "Reference Use". Another editorial change made was to add the documents and forms that were listed throughout the procedure to the reference section. Additionally, some minor punctuation and spelling errors were corrected.
EPIP-EOF-1 changed to reference use EPIP-EOF-19 added reference use EPIP-EOF-25 added reference use EPIP-EOF-26 changed to reference use throughout. Had information on some pages EPIP-rr-11 added reference use EPIP-rr-17a Added references to reference section, changed to reference use EPIP-rr-19a Added references to reference section, added reference use, changed effect to affect, fixed spelling of liaison EPIP-rr-21a changed to reference use EPIP-rr-28 added reference use EPIP-rr-29 Added references to reference section, changed to reference use EPIP-rr-72 changed to reference use throughout. Had information on some pages EPIP-rr-90 changed to reference use The above changes are all editorial, not a reduction in effectiveness, and continue to comply with regulations.
..-. ~
~--
Omaha ~
Public Power District March 17, 2016 LIC-16-0026 10 CFR 50.54(q) 10 CFR 50.4(b)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285
SUBJECT:
Emergency Planning Changes In accordance with 10 CFR 50.54(q), the Omaha Public Power District submits a report of each such change made including a summary of its analysis. This change was reviewed and does not constitute a reduction in effectiveness.
No commitments are made in this letter.
If you have any questions regarding the enclosed changes, please contact Mr. Eric Plautz at 402-533-7308.
g~
'Bradley H. Blome Manager - Site Regulatory Assurance BHB:mec Enclosure c: M. L. Dapas, NRC Regional Administrator, Region IV C.F. Lyon, NRC Project Manager S. M. Schneider, NRC Senior Resident Inspector Fort Calhoun Station. PO Box 550 Fort Calhoun, NE 68023/9610 Power Lane. Blair, NE 68008
TBD-EPIP-OSC-1A Rev 3 and FC-EPF-42 Rev 11 Summary of analysis:
TBD-EPIP-OSC-1A provides the basis for abnormal rad levels and radiological effluent classifications.
Specific set points for RM -054A and RM-054B (Steam Generator Slowdown) are listed for the NOUE and ALERT classification levels based on predetermined monitored setpoints that are determined during instrument calibration . New predetermined setpoints were calculated based on recalibration and change of background and efficiency for RM-054A and RM-0548. Updating the basis document as well as the classification form (FC-EPF-42) to reflect the updated setpoints in no way reduces the effectiveness of the emergency plan.
A change to an EAL numeric threshold to reflect a change in a plant design parameter, instrument response characteristics, or design calculation would generally not require prior NRC approval provided that the meaning or intent of the basis of the approved EAL is unchanged. The changes made to TBD-EPIP-OSC-1A and FC-EPF-42 fall into this category.
Summary of Analysis for editorial EPIP changes.
These EPIPs were not marked "Reference Use" throughout. Some were marked various levels of use, information, or continuous use, which are incorrect. All Emergency Planning Implementing Procedures should be "Reference Use". Another editorial change made was to add the documents and forms that were listed throughout the procedure to the reference section. Additionally, some minor punctuation and spelling errors were corrected.
EPIP-EOF-1 changed to reference use EPIP-EOF-19 added reference use EPIP-EOF-25 added reference use EPIP-EOF-26 changed to reference use throughout. Had information on some pages EPIP-rr-11 added reference use EPIP-rr-17a Added references to reference section, changed to reference use EPIP-rr-19a Added references to reference section, added reference use, changed effect to affect, fixed spelling of liaison EPIP-rr-21a changed to reference use EPIP-rr-28 added reference use EPIP-rr-29 Added references to reference section, changed to reference use EPIP-rr-72 changed to reference use throughout. Had information on some pages EPIP-rr-90 changed to reference use The above changes are all editorial, not a reduction in effectiveness, and continue to comply with regulations.