LIC-15-0122, Final Initial Licensed Operator Examination

From kanterella
(Redirected from LIC-15-0122)
Jump to navigation Jump to search
Final Initial Licensed Operator Examination
ML15294A498
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/20/2015
From: Cortopassi L
Omaha Public Power District
To: Clyde Osterholtz
Document Control Desk, NRC Region 4
References
LIC-15-0122
Download: ML15294A498 (2)


Text

-

fjjjjjfj Omaha Public Power Dlstrfct 444 South 161" Street Mall Omaha, NE 68102-2247 10 CFR 55 LIC-15-0122 October 20, 2015 Mr. Clyde Osterholtz Chief Examiner, Operations Branch, Region IV U. S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285

References:

1. Letter from NRC (V. G. Gaddy) to OPPD (L. P. Cortopassi) dated February 17, 2015 (NRC-15-0013)
2. Letter from OPPD (E. D. Dean) to NRC (C. Osterholtz) dated September 21, 2015 (LIC-15-0111)

SUBJECT:

Final Initial Licensed Operator Examination In accordance with Reference 1, enclosed is the Omaha Public Power District's (OPPD) final initial licensed operator written and operating examination material submittal for the examination scheduled to be conducted during the week of December 14 , 2015. The enclosed material was developed in accordance with NUREG 1021, Revision 10, "Operator Licensing Examiner Standards," and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1.

This material is being provided in electronic format. An enclosed CDROM contains the examination material in password protected Adobe Acrobat (PDF) format. In addition, a separate CDROM, not password protected, includes Fort Calhoun reference material for use in your review.

Also enclosed are the signed Operating Test Quality Checklist (ES-301-3), Simulator Scenario Quality Checklist (ES-301-4 ), Written Exam Quality Checklist (ES-401-6 ) and Examination Security Agreement (ES-201-3). As additional individuals are required to participate in the examination development and validation process, they will be added to the security agreement.

To ensure exam security, it is requested that the Operations Test materials, scenarios and Job Performance Measures (JPMs), be withheld from public disclosure until after the examinations are complete. We request the written exam be withheld for a period not to exceed two years from the date the exam is administered, which is scheduled for December 21, 2015.

Employment with Equal Opportunity

U. S. Nuclear Regulatory Commission LIC-25-0122 Page 2 If you have any questions concerning the proposed examination material, please contact Mr.

Mick Joe at 402-533-604 1 or Mr. Allen Berek at 402-533-6073.

7zrd This letter contains no regulatory commitments.

Resp Louis P. Cortopassi Site Vice President and CNO Enclosures LPC/epm M. L. Dapas, NRC Regional Administrator, Region IV (w/o en-closures)

C. F. Lyon, NRC Senior Project Manager (w/o enclosures)

S. M. Schneider, NRC Senior Resident Inspector (w/o enclosures)

Document Control Desk (w/o enclosure)

fjjjjjfj Omaha Public Power Dlstrfct 444 South 161" Street Mall Omaha, NE 68102-2247 10 CFR 55 LIC-15-0122 October 20, 2015 Mr. Clyde Osterholtz Chief Examiner, Operations Branch, Region IV U. S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285

References:

1. Letter from NRC (V. G. Gaddy) to OPPD (L. P. Cortopassi) dated February 17, 2015 (NRC-15-0013)
2. Letter from OPPD (E. D. Dean) to NRC (C. Osterholtz) dated September 21, 2015 (LIC-15-0111)

SUBJECT:

Final Initial Licensed Operator Examination In accordance with Reference 1, enclosed is the Omaha Public Power District's (OPPD) final initial licensed operator written and operating examination material submittal for the examination scheduled to be conducted during the week of December 14 , 2015. The enclosed material was developed in accordance with NUREG 1021, Revision 10, "Operator Licensing Examiner Standards," and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1.

This material is being provided in electronic format. An enclosed CDROM contains the examination material in password protected Adobe Acrobat (PDF) format. In addition, a separate CDROM, not password protected, includes Fort Calhoun reference material for use in your review.

Also enclosed are the signed Operating Test Quality Checklist (ES-301-3), Simulator Scenario Quality Checklist (ES-301-4 ), Written Exam Quality Checklist (ES-401-6 ) and Examination Security Agreement (ES-201-3). As additional individuals are required to participate in the examination development and validation process, they will be added to the security agreement.

To ensure exam security, it is requested that the Operations Test materials, scenarios and Job Performance Measures (JPMs), be withheld from public disclosure until after the examinations are complete. We request the written exam be withheld for a period not to exceed two years from the date the exam is administered, which is scheduled for December 21, 2015.

Employment with Equal Opportunity

U. S. Nuclear Regulatory Commission LIC-25-0122 Page 2 If you have any questions concerning the proposed examination material, please contact Mr.

Mick Joe at 402-533-604 1 or Mr. Allen Berek at 402-533-6073.

7zrd This letter contains no regulatory commitments.

Resp Louis P. Cortopassi Site Vice President and CNO Enclosures LPC/epm M. L. Dapas, NRC Regional Administrator, Region IV (w/o en-closures)

C. F. Lyon, NRC Senior Project Manager (w/o enclosures)

S. M. Schneider, NRC Senior Resident Inspector (w/o enclosures)

Document Control Desk (w/o enclosure)