LIC-15-0003, Revision of Standard Practice Procedures Plan

From kanterella
Jump to navigation Jump to search
Revision of Standard Practice Procedures Plan
ML15010A055
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/07/2015
From: Cortopassi L
Omaha Public Power District
To:
Document Control Desk, Division of Security Operations
References
LIC-15-0003 SY-FC-101-136-F-01, Rev 0
Download: ML15010A055 (3)


Text

~~

UPPU Omaha Public PDWflr Oistrjcl 444 South 1(3th Street Mall Omaha, NE 68102-2247 LIC-15-0003 January 7, 2015 10 CFR 95.19 U.S. Nuclear Regulatory Commission Attn: Document Control Desk, Director, Division of Security Operations, Office of Nuclear Security and Incident Response Washington, DC 20555-0001 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285

Subject:

Revision of Standard Practice Procedures Plan for Fort Calhoun Station, Unit No. 1

Reference:

10 CFR 95.19 Pursuant to 10 CFR 95.19(b), the purpose of this letter is to provide a copy of a revised Standard Practice Procedures Plan for the Fort Calhoun Station (FCS) Unit No. 1. The plan has been issued as a separate form and the frequency of refresher briefings was corrected.

This letter contains no regulatory commitments.

If you should have any questions regarding this submittal or require additional information, please contact Mr. Dennis A. Bakalar, Manager Site Security, at 402-533-7640.

Louis P. Cortopassi Site Vice President and CNO LPC/BRH/brh

Attachment:

Standard Practice Procedures Plan Employment with Equal Opportunity

U.S. Nuclear Regulatory Commission Ll C-15-0003 Attachment Standard Practice Procedures Plan

SY-FC-1 01-136-F-01 FCS Fort Calhoun Station Revision 0 Page 1 of 1 Level 3 - Information Use Standard Practice Procedures Plan Omaha Public Power District Policv for Use of Classified Information This policy outlines the security responsibilities of Omaha Public Power District with its principal office at 444 S.

1 16 h St. Mall, Omaha, NE, 68102-2247, doing business at Fort Calhoun Nuclear Station.

OPPD will not receive, store, transmit, or originate Classified Information within our facilities. OPPD personnel granted a security clearance by the NRC will have authorized access to Classified Information at approved NRC facilities.

The Facility Security Officer (FSO) will be responsible for ensuring that the following security requirements are met:

  • Initial and refresher briefings (every year) are conducted and documented as required by 10 CFR 95, "Facility Security Clearance and Safeguarding of National Security Information and Restricted Data," and that Form SF 312, "Classified Information Nondisclosure Agreement Form," is signed and processed prior to any access to Classified Information.
  • Termination briefings are conducted and documented in accordance with 10 CFR 25, "Access Authorization for Licensee Personnel," and 10 CFR 95 for all cleared personnel leaving our employment, losing their clearance, or no longer requiring a clearance. The termination statements will be forwarded to NRC Headquarters.
  • Provisions of the Privacy Act are met when handling and mailing/delivering completed personnel security clearance request documents.
  • Cleared OPPD personnel are apprised of and comply with the personnel clearance reporting requirements .
  • Foreign national employees are not placed in a position to exercise control or influence over properly cleared U.S. citizens who have been granted access to NRC Classified Information.
  • Reporting requirements involving foreign ownership, control, or influence conditions are complied with.
  • A procedure is developed describing the internal processes for performing functions to accomplish each of the items above. Applicable OPPD employees will be familiar with and comply with security procedures at sites where classified work is being performed and be informed of their individual responsibilities in executing and supporting these procedures.
  • Designated representatives of the NRC are required periodically to inspect the procedures, methods, and facilities utilized by OPPD in complying with the requirements of the terms and conditions of 10 CFR 25 and 10 CFR 95. OPPD shall assist by proving necessary documentation for review.

All personnel at OPPD who have been granted a security clearance by the NRC are responsible for compliance with the requir ents of th is policy.

an Date s ortopassi Date uclear Station Facility Security Officer art Calhoun Nuclear Station Site VP