LIC-14-0067, Final Initial Licensed Operator Examination

From kanterella
Jump to navigation Jump to search
Final Initial Licensed Operator Examination
ML14122A391
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/02/2014
From: Cortopassi L
Omaha Public Power District
To: Garchow S
NRC Region 4
References
LIC-14-0067
Download: ML14122A391 (2)


Text

Security-Related Information - Withhold From Public Disclosure Under 10 CFR 2.390 Scenario 1 of the Operating Test Upon removal of Scenario 1 of the Operating Test, this letter is Decontrolled.

-~.:..

jjjjjjjj Omaha Public Power Oistrict 444 South 16th Street Mall Omaha, NE 68102-2247 10 CFR 55 LI C-14-0067 May 2,2014 Mr. Steve Garchow Chief Examiner, Operations Branch, Region IV U. S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Fort Calhoun Station, Unit No.1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285

References:

1. Letter from NRC (V. G. Gaddy) to OPPD (L. P. Cortopassi) dated March 4, 2014 (NRC-14-0018)
2. Letter from NRC (V. G. Gaddy) to OPPD (L. P. Cortopassi) dated May 16, 2013 (NRC-13-0064)

SUBJECT:

Final Initial Licensed Operator Examination In accordance with References 1 and 2, enclosed is the Omaha Public Power District's (OPPD) final initial licensed operator written and operating examination material submittal for the examination scheduled to be conducted during the week of May 19, 2014. The enclosed material was developed in accordance with NUREG 1021, Revision 9, Supplement 1, "Operator Licensing Examiner Standards," and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1.

This material is being provided in electronic format. An enclosed CDROM contains the examination material in password protected Adobe Acrobat (PDF) format. In addition, a separate CDROM, not password protected, includes Fort Calhoun reference material for use in your review.

Also enclosed are the signed Operating Test Quality Checklist (ES-301 -3), Simulator Scenario Quality Checklist (ES-301 -4), Written Exam Quality Checklist (ES-401-6) and Examination Security Agreement (ES-201 -3) . As additional individuals are required to participate in the examination development and validation process, they will be added to the security agreement.

To ensure exam security, it is requested that the Operations Test materials, scenarios and Job Performance Measures (JPMs), be withheld from public disclosure until after the examinations are complete. We request the written exam be withheld for a period not to exceed two years from the date the exam is administered, which is scheduled for May 27, 2014.

Security-Related Information - Withhold From Public Disclosure Under 10 CFR 2.390 Scenario 1 of the Operating Test Upon removal of Scenario 1 of the Operating Test, this letter is Decontrolled.

Employment with Equal Opportunity

Security-Related Information - Withhold From Public Disclosure Under 10 CFR 2.390 Scenario 1 of the Operating Test Upon removal of Scenario 1 of the Operating Test, this letter is Decontrolled.

U. S. Nuclear Regulatory Commission LlC-14-0067 Page 2 Scenario 1 of the Operating Test contains Sensitive Unclassified Non-Safeguards Information (SUNSI) and should be withheld from public disclosure under 10 CFR 2.390.

If you have any questions concerning the proposed examination material, please contact Mr.

Shannon Shea at 402-533-6031, Mr. Dennis Dryden at 402-533-6048 or Mr. Jerry Koske at 402-533-6065.

This letter contains no regulatory commitments.

L is P. Cortopas I Site Vice President and CNO Enclosures LPC/epm c: M. L. Dapas, NRC Regional Administrator, Region IV (w/o enclosures)

J. M. Sebrosky, NRC Senior Project Manager (w/o enclosures)

J. C. Kirkland, NRC Senior Resident Inspector (w/o enclosures)

Document Control Desk (w/o enclosure)

Security-Related Information - Withhold From Public Disclosure Under 10 CFR 2.390 Scenario 1 of the Operating Test Upon removal of Scenario 1 of the Operating Test, this letter is Decontrolled.