LIC-13-0005, 10 CFR 72.48 Evaluation Summary Report for January 1, 2012 Through December 31, 2012

From kanterella
Jump to navigation Jump to search
10 CFR 72.48 Evaluation Summary Report for January 1, 2012 Through December 31, 2012
ML13018A230
Person / Time
Site: Fort Calhoun  Omaha Public Power District icon.png
Issue date: 01/17/2013
From: Simpkin T
Omaha Public Power District
To:
Office of Nuclear Material Safety and Safeguards, Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-13-0005
Download: ML13018A230 (3)


Text

-~

DjjjjD Om,'"Public Power 0IsIrIct 444 South 1tfh Street Mall Omaha, NE 68102-2247 January 17, 2013 LI C-13-0005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

References:

1. Docket No. 50-285
2. Docket No.72-054
3. Letter from OPPD (J. R. Goodell) to NRC (Document Control Desk), "Fort Calhoun Station (FCS), Unit No.1, 10 CFR 72.48 Evaluation Summary Report for July 23, 2010 through December 31, 2011," dated January 31, 2012 (LlC-12-0009) (ML12031A188)

SUBJECT:

Fort Calhoun Station (FCS), Unit No.1, 10 CFR 72.48 Evaluation Summary Report for January 1, 2012 through December 31, 2012 In accordance with 10 CFR 72.48(d)(2), attached is the 10 CFR 72.48 Evaluation Summary Report for the period of January 1, 2012 through December 31, 2012. The previous report (Reference 3) was submitted on January 31,2012.

No commitments to the NRC are made in this letter.

If you should have any questions, please contact Mr. Phil Turner at (402) 533-6825.*

Sincerely, Terrence W. Simpkin Manager, Site Regulatory Assurance

Attachment:

10 CFR 72.48 Evaluation Summary Report for January 1, 2012, through December 31 , 2012 TWS/PRT/mle Employment with Equal Opportunity

LIC-13-0005 Attachment Page 1 10 CFR 72.48 Evaluation Summary Report For January 1, 2012 through December 31, 2012

LIC-13-0005 Attachment Page 2 During this period, there were no changes, tests, or experiments that required an evaluation to be performed under 10 CFR 72.48.