~~e iijljlO Omaha Public Power District 444 South 1fJh Street Mall Omaha, NE 68102-2247 March 22, 2012 LI C-12 -0030 U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, D.C. 20555
References:
- 1.
Docket No. 50-285
- 2.
Letter from NRC (A. Vegel) to OPPD (D. J. Bannister),
05000285/2011014; Finding of Preliminary High Safety Si Station," dated March 12, 2012 (NRC-12-0022) (EA 12-023)
"NRC gnifica Inspection Report nce, Fort Calhoun
Subject:
Response to Special Inspection Report The Omaha Public Power District (OPPD) received three apparent violations that are being considered for escalated enforcement in Reference 2. Reference 2 also provided the following options to address the apparent violations:
- 1. Submit in writing OPPD's position on the findings to the Nuclear Regulatory Commission (NRC) within 30 days, or
- 2. Attend a Regulatory Conference, or
- 3. Decline a Regulatory Conference or decline to submit a written response with the OPPD position on the findings.
Mr. Geoffrey Miller, Chief Engineering Branch 2, Division of Reactor Safety, was notified that OPPD has elected option 3, OPPD declines to attend a Regulatory Conference or submit a written response with the OPPD position on the findings. OPPD accepts the Red Finding as described in Reference 2.
Should you have questions or comments, please contact Ms. Susan Baughn at 402-533-7215.
Sincerely, J1~
D. J. Bannister Site Vice President and CNO DJB/rmc c:
E. E. Collins, Jr., NRC Regional Administrator, Region IV G. B. Miller, NRC Region IV L. E. Wilkins, NRC Project Manager J. C. Kirkland, NRC Senior Resident Inspector