LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report
LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan
LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI
LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)
LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095
LIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information
LIC-24-0014, Independent Spent Fuel Storage Installation - Supplement to 2021, and 2024 Nuclear Decommissioning Funding Plan Required 72.30(c) Update
LIC-24-0013, Independent Spent Fuel Storage Installation - Intent to Submit a Supplement to 2021, and 2024 Nuclear Decommissioning Funding Plan Required 72.30(c) Update
LIC-24-0016, Independent Spent Fuel Storage Installation - 2024 Decommissioning Funding Plan Required 72.30(c) Updated Financial Information
LIC-24-0015, Response to Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (DQAP) – Clarification of Request for Additional Information Response
LIC-24-0017, ISFSI - Phase 1 Final Status Survey Report to Support Approved License Termination Plan, Revision 1; and Technical Support Document for the Ludlum 44-20 Detector Sensitivity
LIC-25-0001, Independent Spent Fuel Storage Installation - Response to Acceptance of Requested Licensing Action License Amendment Request to Revise the License Termination Plan (L-2024-LLA-0095)
~~e iijljlO Omaha Public Power District 444 South 1fJh Street Mall Omaha, NE 68102-2247 March 22, 2012 LI C-12 -0030 U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, D.C. 20555
References:
1.
Docket No. 50-285
2.
Letter from NRC (A. Vegel) to OPPD (D. J. Bannister),
Response to Special Inspection Report The Omaha Public Power District (OPPD) received three apparent violations that are being considered for escalated enforcement in Reference 2. Reference 2 also provided the following options to address the apparent violations:
1. Submit in writing OPPD's position on the findings to the Nuclear Regulatory Commission (NRC) within 30 days, or
3. Decline a Regulatory Conference or decline to submit a written response with the OPPD position on the findings.
Mr. Geoffrey Miller, Chief Engineering Branch 2, Division of Reactor Safety, was notified that OPPD has elected option 3, OPPD declines to attend a Regulatory Conference or submit a written response with the OPPD position on the findings. OPPD accepts the Red Finding as described in Reference 2.
Should you have questions or comments, please contact Ms. Susan Baughn at 402-533-7215.
Sincerely, J1~
D. J. Bannister Site Vice President and CNO DJB/rmc c:
E. E. Collins, Jr., NRC Regional Administrator, Region IV G. B. Miller, NRC Region IV L. E. Wilkins, NRC Project Manager J. C. Kirkland, NRC Senior Resident Inspector