LIC-05-0095, Fitness-for-Duty Program Performance Data Report
| ML052130522 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 08/01/2005 |
| From: | Mcmanis J Omaha Public Power District |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LIC-05-0095 | |
| Download: ML052130522 (4) | |
Text
Omaha Public Power District 444 South 16th Street Mall Omaha NE 68102-2247 August 1,2005 LIC-05-0095 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
Docket No. 50-285
SUBJECT:
Fitness-for-Duty Program Performance Data Report In accordance with 10 CFR 26.7 1 (d), attached please find the Omaha Public Power District (OPPD) Fitness-for-Duty Program Performance Data for the six-month period from January 1 through June 30,2005.
No commitments are made to the NRC in this letter. If you have any questions, please contact Theresa Petersen at (402) 533-7325.
aM:
anager Nuclear Licensing Attachment Employment with Equal Opportunity 4 17 1
LIC-05-0095 Attachment Page 1 Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Omaha Public Power District Company Fort Calhoun Nuclear Power Station Location June 30,2005 6 Months Ending Terri Petersen (402) 533-7325 Contact Name Phone (include area code)
I Cutoffs: ScreedConfirmation (ngiml)
Appendix A to 10 CFR I
I Marijuana 50 I 15 Amphetamines 1000 I 500 Benzodiazepines 300 / 300 I Cocaine 300 / 150 Phencyclidine 25 / 25 Barbiturates 300 / 300 I
I Opiates 300 / 300 Alcohol (% BAC) 0.04 Methadone 300 / 300 I
Propoxyphene 300 / 300 Testing Results Average Number with Unescorted Access Categories Pre-Access For Cause Licensee Employees 890 Post Accident Observed behavior
- Tested 3 8 0
0 279 23 1
341 Random Follow-up Other (re-entry)
Total
- Positive 0
0 0
0 0
0 0
Long-Tern Contractor Personnel
- Tested Short-Term Contractor Personnel 543
- Positive
- Tested 1171 1
1 128 N/A 0
1301
- Positive 8
0 0
0 N/A 0
8
LIC-05-0095 Attachment Page 2 Breakdown of Confirmed Positive Tests for Specific Substances
- One short-term contractor tested positive for both marijuana and opiates.
Licensee Employees Long-Term Contractors Short-Term Contractors Total Marijuana 4
4 Cocaine 2
2 A
9
- Opiates 1
1 Amphe-tamines 1
1 Phency-clidine Alcohol 1
1 Refusal to Test
LIC-05-0095 Attachment Page 3 I. MANAGEMENT ACTIONS A.
Two contractor employees attempted to subvert drug/alcohol tests by providing urine outside the temperature range. Both individuals were directly observed while providing a second specimen. The second specimen on the first individual tested positive for marijuana and the second specimen for the other individual tested positive for marijuana and opiates. These individuals were denied unescorted access and turned over to their employers.
B.
Eight contractor employees tested positive on their pre-access tests. They were denied unescorted access and turned over to their employers.
- 11. EVENTS REPORTED None