LIC-03-0147, Generator Tube Plugging Report - 2003 Refueling Outage
| ML033230486 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 10/27/2003 |
| From: | Ridenoure R Omaha Public Power District |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LIC-03-0147 | |
| Download: ML033230486 (1) | |
Text
-
Omaha Public Power District 444 South 16th Street Afall Omaha NE 68102-2247 October 27, 2003 LIC-03-0147 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
-Docket No.-50-285 -
SUBJECT:
Fort Calhoun Station Steam Generator Tube Plugging Report - 2003 Refueling Outage Pursuant to FCS Unit No. 1 Technical Specifications (TS) 3.17(5)(i), the Omaha Public Power District (OPPD) completed eddy current testing of the steam generator tubes at Fort Calhoun Station (FCS) on October 4, 2003, during the twenty-first refueling outage. In accordance with the TS, OPPD reports that 46 tubes were plugged in Steam Generator RC-2A and 69 tubes were plugged in Steam Generator RC-2B.. To date, RC-2A has 308 plugged tubes and RC-2B has 340 plugged tubes.
No tubes were repaired by sleeving in either steam generator during the 2003 Refueling Outage.
Specific details in regard to steam generator tube plugging will be included in the six (6) month report required by Technical Specification 3.17(5)(ii).
No commitments are made to the NRC in this letter. If you have additional questions, or require further information, please contact Dr. R. L. Jaworski at (402) 533-6833.
Sincerely, t t k-T R~eno~ur Divisi nager Nude r 0 erations
- / RT#MLE/m~le B. S. Mallett, NRC Regional Administrator, Region IV.
Alan Wang, NRC Project Manager John G. Kramer, NRC Senior Resident Inspector LY7 Employment WMit Equal Opportunity